ITIL Introduction Presentation

This document provides an introduction to ITIL concepts of change management and configuration management. It begins with an agenda and overview of ITIL and then describes the key aspects of the change management process and configuration management process. The change management process section explains the objectives, scope, classification and categories of changes. It also outlines the criteria for determining the risk value and category of a change. The document establishes several change advisory boards to review and assess proposed changes from different perspectives.

Uploaded by

DESMOND5166410
Copyright
© © All Rights Reserved
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
279 views

ITIL Introduction Presentation

This document provides an introduction to ITIL concepts of change management and configuration management. It begins with an agenda and overview of ITIL and then describes the key aspects of the change management process and configuration management process. The change management process section explains the objectives, scope, classification and categories of changes. It also outlines the criteria for determining the risk value and category of a change. The document establishes several change advisory boards to review and assess proposed changes from different perspectives.

Uploaded by

DESMOND5166410
Copyright
© © All Rights Reserved
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 46

Introduction to

ITIL Concept
Change Management and
Configuration Management

MTR Corporation

01/19/16

Page 1

Agenda
1. Introduction to Basic Concept in ITIL
2

Change Management Process and Sharing

3. Configuration Management Process and Sharing

MTR Corporation

01/19/16

Page 2

Introduction to ITIL
(Overview)

MTR Corporation

01/19/16

Page 3

Whats ITIL ?

ITIL (Information Technology Infrastructure Library) is a public framework


that describes Best Practice in IT service management. It provides a
framework for the governance of IT and focuses on the continual
measurement and improvement of the quality of IT service delivered from
both a business and a customer perspective.

ITIL has provided not only a best practice based framework for IT
management, but also an approach and philosophy shared by the people
who work with it in practice.

ITIL was originally developed in 1980s and has been updated twice, the first
time in 2000-2002 (V2), and the second time in 2007 (V3). ITIL is supported
by the IT Service Management Forum (itSMF), an internationally recognized
not-for-profit organization dedicated to support the development of IT service
management

MTR Corporation

01/19/16

Page 4

Benefits from ITIL Service


Management

Increased user and customer satisfaction with IT services

Improved service availability, directly leading to increased business profits


and revenue

Financial savings from reduced rework, lost time, improved resource


management and usage

Improved time to market for new products and services

Improved decision making and optimized risk.

MTR Corporation

01/19/16

Page 5

ITIL Service Lifecycle


ITIL V3 approaches service management from the lifecycle aspect of a
service.

MTR Corporation

01/19/16

Page 6

ITIL Service Management


Mission
Statement

Business IT
Alignment

Service
Strategy

Service
Delivery

Service Design
and Transition

Service
Support

MTR Corporation

Service
Operation

01/19/16

Page 7

The 5 Phases in ITIL Service LifeCycle


Service Strategy - The phase of strategic planning of service
management capabilities, and the alignment of service and business
strategies.
Service Design - The phase of designing and developing appropriate IT
services, including architecture, processes, policy and documents; the
design goal is to meet the current and future business equirements.
Service Transition - The phase of realizing the requirements from
previous stages,and improving the capabilities for the transition of
new and modified services to production.
Service Operation - The phase of achieving effectiveness and
efficiency in providing and supporting services in order to ensure
value for the customer and the service provider.
Continual Service Improvement - The phase of creating and
maintaining the value for the customer by design improvement, and
service introduction and operation.
MTR Corporation

01/19/16

Page 8

What s inside in each LifeCycle Phase?


Process - A structured set of activities designed to
accomplish a defined objective. Processes have inputs and
outputs, result in a goal-oriented change, and utilize feedback
for self-enhancing and self-corrective actions. Processes are
measurable, provide results to customers or stakeholders, are
continual and iterative and are always originating from a
certain event. Processes can run through several organizational
units. An example of a process is change management.

Function - A team or group of people and the tools they use


to carry out one or more processes or activities, specialized in
fulfilling a specified type of work, and responsible for specific
end results. Functions have their own practices and their own
knowledge body. Functions can make use of various processes.
An example of a function is a service desk.

MTR Corporation

01/19/16

Page 9

ITIL Process Definition

MTR Corporation

01/19/16

Page 10

Process Characteristics
Process
Characteristics

Description

Measurable

If we can' t measure a process, then it will not fit the


definition of 'closed loop', as no feedback will be available.
Measuring a process allows it to be performance driven.
Different measurements will be equired for different
audiences- for example managers may be interested in the
cost of the process, while customers may be interested in the
outcome.

Delivers specific results

The results of a process need to be identifiable, measureable


and countable. Again, without a clear result the process
cannot be managed, measured and controlled.

Delivers to a customer or
stakeholder

The customer or stakeholder can be internal or external, but it


is their expectations that shape the overall process.

Responds to specific
events

This is classed as a trigger or input to the process, and is


again important for measurement and control.

MTR Corporation

01/19/16

Page 11

Service Support Model


Business, Customers or Users
Difficulties
Queries
Enquiries

Management Tools

Incidents

Incident
Management
Process

Incidents

Problem
Management
Process

Communications
Updates
Workarounds

Service Desk

Changes

Change & Release


Management Process
Configuration
Management
Process

Configuration Management System


Incidents

MTR Corporation

Problems
Known Errors

Changes & Releases

01/19/16

CMDB

CIs
Relationships
Page 12

Change Management Process

MTR Corporation

01/19/16

Page 13

Process Objectives
To ensure that standardised methods and procedures are used for efficient and prompt handling of all Changes, in order to
minimise the adverse impact of any Change-related incidents upon service quality
Assessing the impact, cost, benefit, resource requirements and risk of proposed Changes
Developing business justification and obtaining approval
Managing and coordinating Change implementations
Monitoring and reporting on the implementation
Reviewing and closing the Changes

MTR Corporation

01/19/16

Page 14

Change Management Scope


In-Scope
All Production Environment including related hardware, software and
configuration items, which are owned by ITSD and are essential for
supporting a Production IT Service

Out-Scope
Development environment equipments
Frontend network devices
Data Centre Facility
Storage of actual physical form (e.g. software binaries, documents)

MTR Corporation

HP Commerical Confidential

01/19/16

Page 15

15

Change Classification
All changes to IT production environment are
classified according to the below metrics :
Risks and Impacts
Complexity and Resources Requirement

Currently, they can be assigned into 6 different


categories according to the above metrics, and they
will follow the designated change process flow and go
through the formal review and approval process from
respective CAB (Change Advisory Board) prior to
production release.

MTR Corporation

01/19/16

Page 16

Change Category
Category

Characteristics

Approval Required

Standard

Low risk

Simplified, Pre-defined and Pre-authorized

Minor

Requires relatively few


resource; not complex

Simplified with DCAB approval only

Significant

Medium risk; medium


resources requirement

Full approval from TCAB & DCAB

Major

High complexity; High


impact and/or requires a
large amount of resources

Full approval from TCAB & DCAB

Emergency

Results from Incidents


(such as outage or prevent
outage)

Streamlined, Approval from ECAB only

Hardware /
OS

Special kind of change


request to capture the
changes on physical / VM
machines for updating host
CMDB

Need to associate with approved Minor /


Significant / Major / Emergency change for
execution

MTR Corporation

01/19/16

Page 17

Change Category Determination


Criteria
Category

Determination Criteria

Standard

For changes that can be mapped with pre-registered


Standard Change Template which is pre-approved by
TCAB members

Minor

For changes with 0 Risk Value < 0.5

Significant

For PI / SER / Infrastructure initiated Changes with


investment size below HK$ 1M or 0.5 Risk Value <
0.75

Major

For PI / SER / Infrastructure initiated Changes with


investment size over HK$ 1M

Emergency

For changes raised to address Priority 1 Incidents and


need higher-level management attention and
streamlined approval

Hardware / OS

For those changes to physical hardware / VM


machines or its Operating System

MTR Corporation

01/19/16

Page 18

Change Category Determination


Criteria (Cont)
The Risk Value associated with a change is determined
by the following factors together with the review by
Change
Coordinator:
Risk Criteria
Remarks
Change Duration

The estimated entire duration to execute this Change. This equals to Planned
End Date Planned Start Date

Outage Duration

The estimated duration for any outage necessary

Lead Time

The lead time for planned change to happen. This equals to Planned Start Date
Current Date

Back out is Possible

Back out possibility

Back out Recovery Time

Time needed to revert back the change to previous baseline

Within SLA Change Window

Whether the Change is fall within the non-Service hours specified in SLA

Impact on the Network

The area of the MTR corporate network to be affected

No of Domains required

The technical areas to be involved; e.g. System Software, Database, other


Application interfaces, PC desktop configuration etc. One technical area means
one domain to be involved

No of CIs being changed

How many estimated no. CIs will be involved (added, altered or retired) in this
Change

Impact on other CIs

The impact of implementing this Change to other CIs listed above

No of previous successful
Implementation of this type of
change

Whether similar kinds of changes has been executed before

Business Impact

Significance of this Change to the business

Urgency

Urgency of this Change to the business

MTR Corporation

01/19/16

Page 19

Change Advisory Board (CAB)


The Change Advisory Boards are formulated to assess
the changes from different viewpoints. They will take
the advisory role, review and assess the proposed
changes, and carry the authority to approve or reject
the proposed changes. Currently, 3 different types of
CAB are introduced :
Technical CAB

Deployment CAB

Emergency CAB

MTR Corporation

01/19/16

Page 20

CAB Objectives and Meeting Frequency


CAB
Technical
CAB (TCAB)

Objectives
Assess the risk
and impact of the
changes from
technical
viewpoint

Deploymen Assess the


t
readiness to
CAB (DCAB) deploy the
changes to
Production
environment and
post
implementation
support
Emergency Assess the
CAB (ECAB) change to address
incidents /
problems under
an emergent or
adhoc condition
MTR Corporation

Meeting Frequency
Meeting is arranged on needed
basis to assess change requests
and monthly review meeting for
the post implementation review
for the changes within the month.
Meeting is arranged 2 times for
each week to assess change
requests.

Most often the approval is


conducted through email or
phone communication

01/19/16

Page 21

Roles and CAB membership


Roles

Members

Process Owner

Raymond Yip

Change Requestor

All ITSD Staffs

Change Owner

All ITSD Staffs

Change Manager

Raymond Yip/Albert Cheung

Change Coordinator

Albert Cheung/Desmond Chiu

Release Manager

Raymond Yip

Config Manager

Raymond Yip / Desmond Chiu

Config Data Analyst

Desmond Chiu / Albert Cheung

Technical CAB

Nominations by DHoIT, ISS , ITEA and ITS


Section Heads

Deployment CAB

(a) Nominations by IS/IT Managers


(b) PCU
(c) Operation Team Representative
(d) IT Help Desk

Emergency CAB

ITS & ISS section head

MTR Corporation

01/19/16

Page 22

Change Management Process Flow


1. Standard Change
A standard change template must be registered
before a standard change can be raised against the
approved template

Standard Change
Regis tration Form

MTR Corporation

01/19/16

Page 23

Change Management Process Flow


2. Minor Change
It needs approval from both Change Manager and
DCAB members before deployment to production

MTR Corporation

01/19/16

Page 24

Change Management Process Flow


2. Minor Change

MTR Corporation

01/19/16

Page 25

Change Management Process Flow


3. Significant / Major Change
It needs approval from both TCAB members and
DCAB members before deployment to production

MTR Corporation

01/19/16

Page 26

Change Management Process Flow


3. Significant / Major Change

MTR Corporation

01/19/16

Page 27

Change Management Process Flow


4. Emergency Change
It needs approval from ECAB members before
deployment to production

MTR Corporation

01/19/16

Page 28

Change Management Process Flow


4. Emergency Change

MTR Corporation

01/19/16

Page 29

Change Management Process Flow


5. Hardware / OS Change
For approved change requests involving Physical /
VM hosts / OS installation, this change request
should be raised and captured information is used to
update CMDB

MTR Corporation

01/19/16

Page 30

Configuration Management
Process

MTR Corporation

01/19/16

Page 31

Process Objectives

The Configuration Management (CM) manages the Configuration Items


(CIs) in order to support the other service management processes. CM
defines the service and infrastructure components and maintains accurate
configuration records.

To provide a logical model of the IT infrastructure by identifying,


controlling, maintaining and verifying the versions of ALL
Configuration Items in existence.

MTR Corporation

01/19/16

Page 32

Objectives of CMDB
Support Process*

In the Way

By Providing

Incident Management

To facilitate assessment of business


impacts of Incidents
To pinpoint possible failure CI and
the owner

Upstream relationship to
depending IT Services of a
particular CI
CI owners / administrators
contacts

Problem
Management

To facilitate identification of root


causes

Downstream relationship to
supporting CIs of a
particular IT Service
Overall relationship tree
view of IT Services

Change Management

To facilitate assessment of business


impacts of proposed Changes

Service to CIs dependency


Basic attributes of CIs

*In general, CMDB is the foundation of all ITIL processes


MTR Corporation

HP Commerical Confidential

01/19/16

Page 33

33

Activities of Configuration Management


Planning
The management team and configuration management decide what level of
configuration management is needed and how this level will be achieved. This is
documented in a configuration management plan.

Identification

- Configuration identification focuses on establishing a CI classification system.


Configuration identification determines: the configuration structures and selection
of CIs; the naming conventions of CIs, the CI labels; relations between CIs, the
relevant attributes of CIs

Configuration Control

-Configuration control ensures that the CIs are adequately controlled. No CIs can be
added, adapted, replaced or removed without following the agreed procedure.

Status Accounting

- The lifecycle of a component is classified into different stages. For example:

development or draft, approved and withdrawn. The stages that different types of
CIs go through must be properly documented and the status of each CI must be
tracked.

Verification and Audit

- Reviews and audits to verify physical existence of CIs

MTR Corporation

01/19/16

Page 34

Configuration Management Scope


In-Scope
Any server hosts (including both physical and virtual machine), Software
components which are owned by ITSD and are essential for supporting
a live Service (Regardless of Production / non-production environments)

Out-Scope
Frontend network devices
Data Centre facility
User workstations

MTR Corporation

HP Commerical Confidential

01/19/16

Page 35

35

Configuration Item

A Configuration Item (CI) is an asset, service component or other item that


is ) controlled by configuration management.
Contain attributes that further define it

Attribute

A piece of information describing a CI, e.g.:


- Name
- Location
- Version number

CMDB (Configuration Management DataBase)

A database that contains all relevant details of each CI and details of the
important relationships between CIs

MTR Corporation

HP Commerical Confidential

01/19/16

Page 36

36

CI Classification
CI Class

Description

Examples

Application

A logical composition of functionalities


to support business processes

Oracle ERP, IBM Websphere, MS SQL, HP OVSC,


MS Exchange

Compute

All kinds of server platforms

Mainframe, Unix Servers,


Windows Servers

Documentati
on

All Service supporting documents

Operation Manual

Network

All kinds of network devices

Routers, Switches, Hubs

Service

All IT Services provided by ITSD

AFCOIM, Corporate Email,


FMS

Storage

All kinds of storage devices

SAN, tape library, NAS

MTR Corporation

HP Commerical Confidential

01/19/16

Page 37

37

CI Relationships
Relationship Type

Relationship Subytpe

Physical

Connected/Connected

Physical

Consists of/Is a part of

Logical

Associated/Associated

Logical

Connected/Connected

Logical

Consists of/Is a part of

Logical

Installed on/Has installed

Logical

Hosts / Is hosted on

Logical

Is DR for/has DR

MTR Corporation

HP Commerical Confidential

01/19/16

Page 38

38

Logical Model
Service
Consist of / Is part of

Application
Component

Consist of / Is part of

Consist of / Is part of

Application
Component

Hosts / Is Hosted on

Compute
Connects

Storage

MTR Corporation

HP Commerical Confidential

01/19/16

Page 39

39

Maintenance of CMDB
A CMDB has been built and under control by Change
Management Process

Useful for impact analysis in case a system


component is malfunctioning

System supports have the sole responsibility to


update the CMDB of the responsible service

A Change Request need to be raised to update the


CMDB records.

The CMDB can be accessible on-line through service


management tool and reporting

MTR Corporation

01/19/16

Page 40

(Reference Screenshot for Viewing CMDB)

MTR Corporation

01/19/16

Page 41

(Reference Screenshot for Viewing CMDB)

MTR Corporation

01/19/16

Page 42

(Reference Screenshot for Viewing CMDB)

MTR Corporation

01/19/16

Page 43

(Reference Screenshot for Viewing CMDB)

MTR Corporation

01/19/16

Page 44

(Reference Screenshot for Viewing CMDB)

MTR Corporation

01/19/16

Page 45

Sample Service Tree

MTR Corporation

HP Commerical Confidential

01/19/16

Page 46

46