The Changing Trend... : Six Sigma Quality
The Changing Trend... : Six Sigma Quality
QUALITY
QUALITY ASSURANCE
QUALITY CONTROL
INSPECTION
NON-CONFORMITY
NON-CONFORMITY
Repair: Remedial action taken to
restore, for usage, a once
conforming but now nonconforming product.
Rework: The action taken on a nonconforming product so that it will
fulfill the specified requirements.
CODES
STANDARDS
Q U A L IT Y
Q U A L IT Y A S S U R A N C E
Q U A L IT Y C O N T R O L
LABS
N D TL
PLAN T LAB
SYSTEM
QC - QMI
21222324-
25-
2627-
2829-
INSPECTION METHODOLOGY
INCOMING & ISSUE INSPECTION
EXAMINATION & TEST PROGRAMME
PREPARATION & COMPILATION OF
DATA FOLDERS
CALIBRATION OF INSTRUMENTS /
GAUGES
SUBCONTRACTING INSPECTION
PRESHIPMENT INSPECTION
PROCEDURE
WELDER QUALIFICATION AS PER IBR
HANDLING PRODUCT NONCONFORMANCES
TYPES OF INSPECTION
Receipt Inspection
Issue Inspection
In-process Inspection
Final Inspection
Records and Documentation.
Receipt Inspection
Check identification of
material/component w.r.t. the Test
certificate of that material/component
Verify Test certificate values with itsTDC
requirements
Visually check the surface condition of
the material/components
If acceptable clear to stock
Incase of deviation resolve through MM
Issue Inspection
In-Process Inspection
In-Process
Inspection(Contd..)
NDT
Hydraulic testing-(Gauge selection,calibration,pressure,
duration)
Final Inspection
DISPOSITIONS
ACCEPTED
NOT ACCEPTED
REWORK
NCR
REJECT
SHOP QC
DOCUMENTS
OPS
Records