Measurement System Analysis
Measurement System Analysis
BIAS
The difference between the average measured value and a
reference value is referred as bias. The reference value is an agreed
value depending on the specification of the process/ product. Bias
is controlled by calibration.
BIAS
REFERENCE
VALUE
AVERAGE
MEASUREMENT
REPEATABILITY
JANE
DICK
REPRODUCIBILITY
WEDNESDAY
FRIDAY
STABILITY
REFERENCE
VALUE
M
A
S
T
E
R
as
bad
M
Bad
as
good
F
Good
as
bad
accept.
0.9
< 0.02
<0.05
Marginal unacceptable
0.8 0.9
< 0.80
0.02-0.05
> 0.05.
0.05-0.10
>0.10.
Observer 1
Observer 2
T1
T2
T3
T1
T2
T3
B
G
G
G
G
B
B
G
G
B
G
G
G
B
B
G
G
G
G
B
B
G
G
B
G
G
G
B
B
G
G
G
G
B
B
G
G
B
G
G
G
B
B
G
G
G
G
B
B
G
G
G
G
G
G
B
B
G
G
G
G
G
B
G
G
B
G
G
G
B
G
G
G
G
G
B
B
G
G
B
G
G
G
B
B
G
G
G
G
B
B
G
B
B
G
G
G
B
0
6
6
6
6
0
0
6
5
0
6
6
6
0
5
0
0
0
0
5
6
0
0
5
0
0
0
6
1
0
0
0
0
1
0
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
1
0
0
0
0
0
Total Inspection = 84
Total (A) = 53
Total (M) = 3
Total (B) = 27
Total (F) = 1
Effectiveness = (A+B)/total inspection
= (53+27)/84 =0.952
Prob. of Miss (Pmiss ) = M(B+M) =3/(27+3) =3/30 = 0.1
Prob. Of False Alarm (Pfa ) = F/(A+F) = 1/(53+1) = 0.02
Bfa = 0.0488 corresponding to Pfa
Bmiss = 0.1758 corresponding to Pmiss
B = Bfa / Bmiss = 0.28
PERSON1
1.2,1.3
3.0,3.1
4.2, 4.2
2.9,3.0
5.1,5.3
6.1,6.3
8.1,8.0
3.2,3.2
0.5,0.4
PERSON2 PERSON3
2.0,2.1
2.3,2.1
3.4,3.6
3.9,4.0
4.5,4.6
4.7,4.8
3.1,3.3
3.5,3.1
5.0,5.0
5.5,5.5
6.3,6.5
7.0,7.1
8.4,8.4
8.7,9.0
3.5,3.5
4.0,4.0
0.9,0.8
1.1,1.2