Ravi Presentation1
Ravi Presentation1
10/19/16
A
Summer Training Presentation
On
10/19/16
Contents
1. About NTPC
2. About BSTPS
3. Installed capacity of barh
4. Operation of power plant
5. Various Parts The Coal Thermal Power Plant
6. Basic principle of thermal power plant
7. Coal Handling Plant
8. Power plant layout
9. Boiler
10. Super Heater
11. Steam Turbine
12. Economiser
13. Reheater
14. Condenser
15. Cooling Tower
16. Electrical overview
Ranjan kumar yard
17.RaviSwitch
10/19/16
About NTPC
NTPC, the largest power company in india, was setup in 1975 to
accelerate power development in country.
NTPC has total installed capacity of 47,178MW (including JVS) with 18
coal based, 7 gas based,2 hydro based, 9 Joint Venture stations are
coal based and 5 renewable energy.
The company has 17.73% of the total national capacity, it contributes
24% of total power generation due to its focus on high efficiency.
It plans to be a 75,000 MW company by 2017.
Ravi Ranjan kumar
10/19/16
10/19/16
INSTALLED CAPACITY
Stage
Unit
EPC Contractor
Date of
Commissioning
Capacity
in MW
1st
1st
Tecchnopromexport
660MW
Delayed
1st
2nd
Tecchnopromexport
660MW
Delayed
1st
3rd
Tecchnopromexport
660MW
Delayed
2nd
4th
BHEL
2013 November
660MW
2nd
5th
BHEL
2015 March
660MW
Status of plant
Running
10/19/16
3,300MW
10/19/16
12.Condenser
13.Deareator
14.Air Preheater
15.Precipitator
16.Cooling Tower
17.Unit Transformers(3-phase)
18.Trasmission line(3-phase)
19.Swith Yard
20. Control Room
10/19/16
10/19/16
10/19/16
10
10/19/16
11
Boiler
Boiler is a rectangular furnace about 50 feet on side and 130 feet
tall. theirs walls are made of high pressure steel tubes about 2.3
inches in diameter which circulates DM water to be converted into
steam. The thermal radiation heats water and changes to steam.
Steam is sent to the turbine .The efficiency and technology of
boiler vary according to the operational pressures(217.176atm)
Super Heater
Super heater is component of steam-generating unit in
which steam, after it has left the boiler drum, is
heated above the saturation temperature.
The super heater may consist of one or more stage of
tube banks arranged to effectively transfer heat from
the product of combustion
Ravi Ranjan kumar
10/19/16
12
Steam Turbine
The turbine generator consists of a series of steam turbines
interconnected to each other and generators on a common
shaft. There is a high pressure turbine at one end, followed
by intermediate pressure turbine and low pressure turbine in
other end. Steam loses pressure and temperatures as it
passes through turbines and expands in volume
Economiser
An economiser is a mechanical device which is recover the
heat from the flue gases on their way to chimney.
It increases the 10-12% efficiency of the plant.
Reheater
Reheater is a heater which is used to rise the temperature of
steam which have fallen from the intermediate pressure
turbine
Ravi Ranjan kumar
10/19/16
13
Condenser
The steam coming out from the Low Pressure Turbine (a little
above its boiling pump) is brought into thermal contact with
cold water (pumped in from the cooling tower) in the
condenser, where it condenses rapidly back into water,
creating near Vacuum-like conditions inside the condenser
chest
Cooling Tower
A cooling tower is a heat rejection device which rejects
waste heat to the atmosphere through the cooling of a water
stream to a lower temperature
Cooling tower size 200 metres (660 ft) tall and 100 metres
(330ft) diameter but rectangular shape 40m tall (130ft)and
80m (260ft) dia.
10/19/16
14
ELECTRICAL OVERVIEW
General Voltage Level
LT 415 V
HT 11KV & 3.3 KV
EHT 400KV
Voltage generation level (NTPC Barh)
stage 1 24.5KV
stage 2 21.5KV
voltage level ( power plant)
5.5KV, 11KV, 132KV,400KV
10/19/16
15
Switch Yard
Switchyard is considered as the HEART of the Power Plant. Power generated can be worthy only if it
is successfully transmitted and received by its consumers. Switchyard plays a very important role as
a junction between the generation and transmission. It is a junction, which carries the generated
power to its destination (i.e. consumers).
Outdoor equipments
1.Bus bar
2.Lightening Arrester
3.Wavetrap
4.Breaker
5.Gen.transformer
6.Earthingrod
Indoor equipments
1.Relays
2.Control panels
3.Circuit breakers
10/19/16
16
400 KV SWITCHYARD
There are total 22 bay in 400 KV
switchyard. A Bay is basically a way for the
incoming power from generator as well as
outgoing power for distribution.
5 Bay for each generating transformer
3 Bay for ICT(Inter Connecting
Transformer)
2 Bay for PATNA line
2 Bay for KAHALGAON line
2 Bay for BALIA line
7 for FUTURE line
1 Bay for use in emergency case
Ravi Ranjan kumar
132 KV SWITCHYARD
There are total 11 Bay in 132 KV
switchyard.
3 Bay for ICT (Inter Connecting
Transformer)
5 Bay for S.T (Station Transformer)
2 Bay for MST (Miscellaneous Service
Transformer)
1 Bay for Bus Coupler
There are two main buses in 132 KV
switchyard.
Main bus - 1
Main bus - 2
10/19/16
17
10/19/16
18