0% found this document useful (0 votes)
20 views7 pages

Modul Teknik Reservoir: Oleh: Ir.H.R.SUMANTRI Ir - Onnie Ridaliani, MT

This document discusses material balance analysis for non-associated gas reservoirs. It provides two formulas to calculate the original gas based on whether the reservoir has water drive or depletion as the only drive mechanism. It also describes using P/Z and G' versus Gp straight line methods to determine the gas initially in place and type of reservoir drive. The methods analyze pressure/volume and gas produced data to distinguish between water drive, which has a positive slope, versus no water drive, which has a constant slope of zero.

Uploaded by

dina mutia sari
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views7 pages

Modul Teknik Reservoir: Oleh: Ir.H.R.SUMANTRI Ir - Onnie Ridaliani, MT

This document discusses material balance analysis for non-associated gas reservoirs. It provides two formulas to calculate the original gas based on whether the reservoir has water drive or depletion as the only drive mechanism. It also describes using P/Z and G' versus Gp straight line methods to determine the gas initially in place and type of reservoir drive. The methods analyze pressure/volume and gas produced data to distinguish between water drive, which has a positive slope, versus no water drive, which has a constant slope of zero.

Uploaded by

dina mutia sari
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 7

MODUL

TEKNIK RESERVOIR
A
A

1
2
6

1580
1560
1550
1540
1530
1520

1570

3
4

GWC

CROSS SECTION A - A

8
10

10

8
A
SUBSURFACE MAP
SCALE 1 : 20 000

Oleh : Ir.H.R.SUMANTRI
Ir.Onnie Ridaliani,MT

MATERIAL BALANCE RESERVOIR GAS


RES GAS : NON ASSOCIATED

Berisi gas SajaTidak ada minyak


Bertenaga dorong depletion + water atau
depletion saja
RUMUS UMUM :
GAS AWAL = GAS PROD + GAS SISA
G
= Gp
+ GBgi /Bg

1.Depletion + Water Drive


G = Gp + [GBgi (We WpBw )] / Bg
Gp =G[1 (Bgi/Bg)]+[ (We WpBw) ] / Bg

2.Depletion + No Water Drive


G = Gp + GBgi / Bg
Gp = G [ 1 (Bgi/Bg) ]

Straight Line Material Balance


Reservoir Gas
Untuk menentukan jenis tenaga dorong
reservoir gas dan GIIP
1.Reservoir Gas No Water Drive
Gunakan Metoda P/Z
P/Z = Pi/Zi - [ (Pi/Zi) /G ] Gp
P/Z = A B
Gp
Pers. Grs lurus : Y = A
-BX

P/Z = 0
Gp = 0

Gp = GIIP
P/Z = Pi/Zi

2.Reservoir Gas Water Drive


Gunakan Metoda G Vs Gp
G=[Gp/(1(Bgi/Bg))] [(WeWpBw)/(Bg Bgi) ]
G+[(WeWpBw)/(BgBgi)]=[Gp / (1 (Bgi/Bg))]
-------------G------------------= [Gp / (1 (Bgi/Bg)) ]

Water Drive :
Slope > 0
G G
G terus membesar dengan
membesarnya We

No Water Drive :
Slope = 0
G = G
G konstan dengan We = 0 dan
Wp = 0

You might also like