Monthly Maintenance Department Report: PT Cemindo Gemilang
Monthly Maintenance Department Report: PT Cemindo Gemilang
PT CEMINDO GEMILANG
OCTOBER 2016
Signed
Date
Maintenance Department
|
www.semenmerahputih.com
Monthly Report MR 1
TABLE OF CONTENTS
Table of contents
MR 1
Maintenance comments
MR 2
MR 3
MR 4
MR 5
MR 6
CMMS
MR 7
MR 8
Maintenance Department
|
www.semenmerahputih.com
Monthly Report MR 2
MAINTENANCE COMMENTS
A. Maintenance management factory
The definition of maintenance often stated maintenance as an activity carried out for any equipment to ensure its reliability to perform its functions.
Maintenance to most people is any activity carried out on an asset in order to ensure that the asset continues to perform its intended functions, or
to repair any equipment that has failed, or to keep the equipment running, or to restore to its favorable operating condition. Over the years, many
new strategies has been implemented as a maintenance strategies which is intended to overcome the problems which is related to equipment
breakdown.
Maintenance should be a constantly improving activity, which enhances the quality of service and optimizes operating costs. Condition-based
maintenance and predictive strategies based on cutting-edge technologies are arriving on the market and their continuous cost reduction opens
wide opportunities, helping the operation and maintenance personnel to perform tasks more effectively.
B. Maintenance control
With increasing production in the packing plant and to keep the performance of machine in factory, then the activity of preventive and predictive
maintenance implemented seriously.
Maintenance program activities in October for use lubrication of maintenance equipment :
Shell tellus 68
: 20 Liters (additional hydraulic oil ship unloader because rubber hose broken during operation)
Omala S2 G 220
: 75 liters (oil change in schedule maintenance)
Shell Gadus S2 V100
: 16 Pail (extra grease to screw ship unloader)
Shell gadus S3 V100
: 2 Pail (schedule maintenance)
Work improvement and corrective maintenance for the smooth operation of conducted regularly, among others :
Recondition shaft screw ship unloader on side west position (horizontal screw in section 3 and 4)
Replace hanger bearing of horizontal screw on side west position (2 set in section 1 and 3)
Replace rubber belt type flat on long conveyor at packer area (spec belt 650 X EP315 / 3P X 4,0 X 2,0 X 45870 MM)
Installation of safety platform for checkered cement bag in truck loader
Replace new pneumatic cylinder in dust collector 59B BF1 and 6E1 BF2 (2 set with new brand PARKER)
Installation new compressor reciprocating 15 kw to be used only receiving transport system (to reduce power consumption)
Modification of system changes seat bag in roto packer (that has been modified of seat No 1, 2 and 3 for operational effectiveness)
Modification head / tail pulley and replace rubber belt on bag diverter
Maintenance Department
|
www.semenmerahputih.com
Monthly Report MR 2
C. Other
To help repair activities on the equipment, we also do a collaboration at the local workshop, Vendor designated to cooperate by management
Pontianak, among others:
* CV. Prima Teknik Inovasi
* Workshop Achun
Equipment repair work, carried out by outsiders :
Recondition shaft screw ship unloader
Work on turning, lathing and milling machine
Repair and service heavy equipment (as guarantee)
Big improvement work
Rewinding motor electric
And others
Outstanding works and improvement also being accelerated for the safety workers, equipment spare parts, maintenance tools, improvement work of
equipment for smooth production in the packing plant.
Maintenance Department
|
www.semenmerahputih.com
Monthly Report MR 3
DATE
CODE
EQUIP. NAME
DESCRIPTION
CORRECTIVE ACTION
DOWNTIME
(MINUTE)
STATUS
1-10-16
61B SG1
Limit switch
bulk loader
Operation
not stop
Done
2-10-16
6E1 BF2
Centrifugal
vacuum fan
360
Done
3-10-16
691 HE2
30
Done
6-10-16
6E1 SC1
Gearbox head
screw
180
Done
8-10-16
600 CP2
Compressor
reciprocating
Operation
not stop
Done
11-10-16
6E2 SC2
Horizontal
screw (west)
40
Done
12-10-16
800 SK1
Maintenance schedule
30
Done
13-10-16
661 BD1
Bag diverter
360
Done
16-10-16
661 PM1
Packer
machine
Operation
not stop
Maintenance Department
Done
|
www.semenmerahputih.com
Monthly Report MR 3
DATE
CODE
EQUIP. NAME
DESCRIPTION
11
17-10-16
661 3B1
Bin vibrating
screen
12
17 21
Oct 2016
6E2 SC2
Horizontal
screw (west)
13
20-10-16
59B BF1
6E1 BF2
14
22-10-16
15
CORRECTIVE ACTION
DOWNTIME
(MINUTE)
STATUS
Operation
not stop
Done
Operation
not stop
On
progress
Dust collector
120
Done
6E2 SC2
Horizontal
screw (west)
Operation
not stop
Done
25-10-16
661 PM1
Packer
machine
30
Done
16
27-10-16
500 WB2
Weighing
bridge
Operation
not stop
On
progress
17
29-10-16
691 HE2
480
On
progress
Maintenance Department
|
www.semenmerahputih.com
Monthly Report MR 4
DESCRIPTION
BEFORE
AFTER
STATUS
3 seat finish
modification, 5 seat on
progress
Done
Done
Maintenance Department
|
www.semenmerahputih.com
Monthly Report MR 4
DESCRIPTION
BEFORE
AFTER
STATUS
On progress
Done
Maintenance Department
Done
|
www.semenmerahputih.com
Monthly Report MR 5
INCIDENT
ACTUAL HOURS
(TOTAL)
OVER TIME
(TOTAL)
ESTIMATED PAYMENT
(IDR)
Jobs
17
38
498
Substitutes of permission
23
Substitutes of leave
Substitutes of sick
Project
Total
498
IDR
Maintenance Department
|
www.semenmerahputih.com
Monthly Report MR 6
click link
Maintenance Department
|
www.semenmerahputih.com
Monthly Report MR 7
SECTION
1
2
PM & CM
1
2
JOB
INSPECTION
TOTAL JOB
ORDER
(EXECUTE)
C-C
O-C
O-O
O-P
JO NOT TO US
TOTAL
CM
PM
SH
Maintenance
34
25
24
17
4 Open
Workshop
25
18
14
6 Open
SECTION
TOTAL JO INSPECTION
Maintenance
33
27
11
14
Workshop
16
14
Maintenance Department
|
www.semenmerahputih.com
Monthly Report MR 8
ME TL
Muhaimin
ADM. Operation
Nisa P
Workshop
Sukardi
Maintenance Department
Maintenance
H. Dio
M. Ilham
Reza
Local vendor
|
www.semenmerahputih.com