Construction Site Management: Case Study 2 Obrai Site at Etternia
Construction Site Management: Case Study 2 Obrai Site at Etternia
CASE STUDY 2
OBRAI SITE AT ETTERNIA
SITE LAYOUT
Space allocation for temporary
Facility
Access roads.
Perimeter fencing.
Material handling.
Travelling time.
Equipment constraints.
Sign boards and barricades.
OBRAI SITE AT ETTERNIA
LABOUR MANAGEMENT
LABOUR CAMP
INSIDE THE SITE
OUTSIDE THE SITE
LABOUR CREW
TEMPORARY FACILITIES
SECURITY OFFICE
TIME OFFICE
QUALITY CONTROL
SCRAP YARD
BATCHING PLANT
STEEL YARD
CANTEEN
TOILET
WEIGHING BRIDGE
SAFETY MANAGEMENT
INSURANCE PREMIUM
JOB SITE MEETING
APPROPRIATE PROTECTIVE
EQUIPMENTS
MANAGEMENT OF HAZARDOUS
SUBSTANCES
SIGN BOARDS