The document describes the process for temporary back feeding of power to two 6kV busbar sections (I and II) during maintenance. Normally each section is powered from a separate unit generator, but during maintenance section I can be powered via a transformer and breaker from the PLN grid, and section II can be powered via cable connected to section I's breaker. The process involves opening existing breakers, energizing the transformer, closing breakers one at a time to the two sections while checking voltages and phases, inspecting parameters and protection relays, and leaving the temporary setup running or switching it off as needed.

Uploaded by

ranowijaya
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
280 views

Back Feeding Procedure

The document describes the process for temporary back feeding of power to two 6kV busbar sections (I and II) during maintenance. Normally each section is powered from a separate unit generator, but during maintenance section I can be powered via a transformer and breaker from the PLN grid, and section II can be powered via cable connected to section I's breaker. The process involves opening existing breakers, energizing the transformer, closing breakers one at a time to the two sections while checking voltages and phases, inspecting parameters and protection relays, and leaving the temporary setup running or switching it off as needed.

Uploaded by

ranowijaya
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 4

Temporary Back Feeding

In normal operation the power busbar 6 KV section I (10BBA) supplied via breaker
(VCF) 10BBA14 and power busbar 6 KV section II (20BBA) supplied via breaker (VCF)
20BBA14 from each unit generator.

During temporary back feeding power busbar 6 KV section I supplied via breaker
10BBA14 which supplied from PLN transformer 20KV/6KV and for busbar 6 KV section
II supplied via breaker 10BBA16 by XLPE Cable to breaker 20BBA16.
Temporary Back Feeding

Energize Busbar 6KV START

All Breaker of 6KV


sec I & II are open at test
position; Isolation No
Open all breaker
handcart and grounding
knife switch are
open

Yes
Switched on 20KV PLN panel

Check the operation status of


PLN 20KV transformer

20KV Step No Switch off 20KV


down TR Repair the problems
PLN Panel
condition is OK

Yes

push the 6KV busbar I PT switch 10BBA15 to working


position; close the secondary switch of 6KV busbar I PT

1
Temporary Back Feeding

Switched on 10BBA14, last 3 times with


interval of 5 minutes

the secondary voltage


value and phase No Switch off 20KV Change the position of cable
sequence of 6KV PLN Panel connection
busbar I are correct.

Yes

Switched on 20BBA16

push the 6KV busbar II PT switch 20BBA15 to working


position; close the secondary switch of 6KV busbar II PT

Switched on 10BBA16, last 3 times with


interval of 5 minutes

2
Temporary Back Feeding

the secondary voltage


value and phase No Switch off Change the position of cable
sequence of 6KV 10BBA16 connection
busbar II are correct.

Yes

Inspect parameter and


protection relay

MV panel 6KB section I & II


continous running

Switched off 10BBA14 if power


is not used

END