Crashing of Activities Example

The critical path is A-B-E-F with a total normal duration of 15 weeks. To shorten the project duration by 3 weeks, tasks A and D should each be shortened by 1 week, costing an additional $500 + $2000 = $2500. The new critical path after crashing would be checked to ensure it is still shortened by 3 weeks.
Copyright
© © All Rights Reserved
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
135 views

Crashing of Activities Example

The critical path is A-B-E-F with a total normal duration of 15 weeks. To shorten the project duration by 3 weeks, tasks A and D should each be shortened by 1 week, costing an additional $500 + $2000 = $2500. The new critical path after crashing would be checked to ensure it is still shortened by 3 weeks.
Copyright
© © All Rights Reserved
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Example: Crashing of activities

Activities Preceding Normal Crash Time Cost Cost


Activities Time in Wks in Wks Normal $ Crash $
A - 4 2 10000 11000
B A 3 2 6000 9000
C A 2 1 4000 6000
D B 5 3 14000 18000
E B,C 1 1 9000 9000
F C 3 2 7000 8000
G E,F 4 2 13000 25000
H D,E 4 1 11000 18000
I H,G 6 5 20000 29000
Key
ABDHI 22 wks
Crash A by 2 wks
Crash D by 1 wk
A) What are the critical path(s) and the estimated completion time, normal time.
Addnl Cost =
B) To shorten the duration of the project by 3 weeks, which tasks should be shortened and by
500+500+2000
how many weeks , and what would be the additional cost to do that.
Check critical path after
each week of crashing
Review
Quiz
Activity Immediate Preceding Duration in days
Activities

A - 5
B A 7
C A 3
D C 3
E B,D 3
F E 2

1 Draw the network diagram


2 Identify the critical path(s).
3 If activities can be crashed at cost per day given below, can you complete the project in 15 days , and what would be
the additional cost?
Cost of crashing per day A:$80, B=$50, C=$75, D=$100,E=$200,F=$175
till duration reaches 2 days and no more crashing is possible.