Basic Project Management
Basic Project Management
4Q Process
Q1 - Measure Q2 - Analyze
Q4 - Sustain Q3 - Improve
Identify raw materials Calculate the ideal Track the actual Modify the safety stock
Build the
that safety stock is safety stock level for consumption on safety level according to the
safety stock
needed each type of material stock for 1 month actual consumption
Gantt Chart
PERT
4Q Project Charter
Problem Description
Project Goal
Major Assumption eg. production volume is 100 pcs/day
(optional)
Requirement eg. data to be retrieved from SAP system
(optional)
Budget
(if any)
Schedule Start date: End date:
Project Team
Role Name Title/Department
Project Sponsor
Project Leader
Team Members
Reduce Raw
Material Stock-Out
Identify raw materials Calculate the ideal Track the actual Modify the safety stock
Build the
that safety stock is safety stock level for consumption on safety level according to the
safety stock
needed each type of material stock for 1 month actual consumption
ahead of schedule
6
4
Days of critical path
2
0
2
4
behind schedule
6
10 8