Software-Presentation Final
Software-Presentation Final
SURVEYING
CSC60603
NG CHUAN KAI 0323738
TAN VIN NIE 0323706
TAN JIT KIM 0323854
LOH WEN JUN 0323551
TEY CHENG FERN 0323912
YEOH SIN YUEN 0323737
VIVIAN TAY HUEY SHUEN 0323869
What is Building Information
Modeling (BIM)?
CostOS
Master bill software was established in 1981, the number from the practice of
investigation, a Master bill always set construction software should be a judgment
standard.
Master bill in recent years has become the market based on the evaluation, to make their
customer service quantity measurement and construction company, which in turn led to the
development including CAD survey, combined with field measurement and modeling work.
2005 of Master bill again have the opportunity to go beyond product launch Master bill elite
to provide complete solution through the planning and the feasibility of the BQ production
cost final account in a product with a database.
COST PLANNING
• Cost Analyses
• Budget Estimates
• Cost Plans
• Bills of Quantities and Tendered Rates
• Post Contract
Function
It saves hours by simply copying relevant parts of
previous projects and adapting them to suit the of
MasterBill
current project.
Fast BQ production
Function
• Freeform Bills
• Comprehensive Pricing Facilities
of
• Powerful Analysis Tools
• Full eTendering Compatibility
MasterBill
Pricing/Estimating
Function
• Sub Contract Packaging routines
• Find Prices facility
of
• Match Prices facility
• Tender Comparison and Analysis
• Resource Reports
MasterBill
• Price adjustment facilities
Costly
Master Bill software isn’t cheap, so the
company got to be prepared to invest in the
technology. It is not very popular in Malaysia as
it focus more on production of BQ.
Limitation of
MasterBill It takes time and
patience
It takes time to learn and familiar with this
software as it provides quite a lot of functions
and services. Getting the team on-board with
the software will also take some time. Expert in
this software is required to assist and train the
team so that they can operate the software.
Buildsoft is an Australian company with its head office in Sydney. Buildsoft was
established in 1985 to develop and market computer software for the building and
construction industry.
It designed primarily for use by commercial building contractors and professional quantity
surveyors. It is also including features which allow it to be used in other industries where estimating
is required.
Create and update estimates
more efficiently
• To price the quantities, user can import pricing data from
suppliers, which can be saved as a template that is natively
connected to the estimate.
Buildsoft
Comprehensive, Integrated
Solution and package
• Buildsoft supports DWF files and it’s not restricted to working in
3D alone as it offers 2D models with 3D BIM and can integrate
these directly with rate libraries and workbooks.
• The Pro version has all the features, including Bills of Quantities,
Custom Report and BIM Reader. Cubit has the ability to generate
Function
and print a range of professional reports including trade, markup,
rate, takeoff, and Bills of Quantities.
Limitation of
Buildsoft Delete the existing file after
doing amendment
Embedded BIM
technology Features
• 3D models can work on directly which makes possible visual
approach on estimating. of
CostOS
Benefits Limitations
• Key in data can be more accurate and • Cost used to purchase softwares
have an efficient work. • Estimating software isn’t cheap
• Multiples estimators can work on and can cost from few hundred
same time and experience true dollars to few thousand dollars or
collaborations. even more.
• Strong Security • Out of date.
• Users can store their data in Cloud • Some provides will offer upgrades
computing and if they lost their or updates of the software, some
laptops, they still able to get back may not which means software
their data and even completely may redundant over time.
wipe data from the lost laptops.
Autodesk, Inc. is an American multinational software corporation that makes
software for the architecture, engineering, construction, manufacturing, media, and
entertainment industries.
Software that enables the effective quantification of design data for use in estimating
construction costs, enabling you to collect and synchronize design data and streamline cost-
estimation processes.
Takeoff in Minutes
Automatically
• Provides a platform to perform a takeoff on an entire building information model
in a short time, as with more traditional methods through integration of 2D and
3D design data.
Quantity TakeOff
Share, Query, and Clarify
• Automatically generates quantities linked to specific objects, enabling faster,
more efficient navigation and takeoff.
Greater Flexibility
• It can perform intuitive, interactive examination of models to gain a better
understanding of the model for estimating purposes.
• Object visibility and transparency are adjustable according to building section or
component type.
Quantity TakeOff
Lack of First-Hand Software
Expert
of
could be deemed average.
Benefits
1. Visualization makes decision making faster
Keep the information up to date and also easy accessibility
3. Clear Accountability
Ability to manage the collaborative process by setting model ownership. The specific accountability built into the
system makes it easier for teams to collaborate without interfering with each other's work
Building Information Modelling
Constraints
1. Cost of software
Requires substantial investment in new technology
Benefits
1. The software is initially expensive, however there are free packages available to download
through.
2. To operate the software, designer will need to learn how to operate the software smoothly, which
the time required is another issue.
3. This software can only be operated in a computer and therefore a computer with high spec is
required for this software to run smoothly.
Manual Measurement
Benefit
1. Cost effective
Cheaper compare to the BIM and CAD due to the software is need to be purchased
Manual measurement would only cost for the printing
2. No training required
Most of the fresh graduate QS are most get used to manual measurement as they are pay more attention
to learn doing measurement manually in their institution as compared to using BIM or CAD software.
Therefore, for the firm which are using BIM or CAD may have to send their employees for further training
Manual Measurement
Constraints
1. Cost Preparation
QS may require to advise the client in term of the budgets and variations on particular project. However, QS may
require cost dare to create the cost plan. Most of the time, there wouldn’t be a problem for a senior or experienced QS
as they are experts based on their past experience but the problem arise when comes to young QS
2. Risk of error
The risk of errors for manual measurement are greater compared to BIM or CAD
3. Quality Output
Inconsistent and designed improperly
Handwritten records may be hard to identify
poorly presented information may fail to communicate key points.
2. Enhanced detail
• Quality of the information
• BIM models gives specific details of information on exact model, specifications, quantities and materials that
used in construction
• Reduce the cost and material usage
Building Information Modelling
3. Improve Collaboration
• Sharing and collaborating with models is easier than drawing sets
• Tools for different disciplines used to share their complex project models and coordinate integration with
peers
• Enhances efficiency of the project
Building Information Modelling
Constraints
1. Features
• During design, allows designer to use several features such as erasing & redrawing, zoom, edit and etc.
2. Drawing tools
• CAD also provide several drawing tools such as lines, points, curves and etc to create a design.
3. Auto measurements
• CAD consist several methods to obtain exact dimensions such as locate points by snapping to an interval on a
rectangular grid or specify exact coordinates by indicating a point along an X and Y axis
Computer-Aided Design (CAD)
Constraint
1. Operating skills
• Inexperience designer with lack of knowledge in operating the software can affect the design process while
producing the design.
2. No back-ups
• Information of the design can be lost instantly if a computer hangs or a problem occurs, there is no back-up
for the software.
Manual measurement
Benefits
1. No operating skills required
• Do not require any skills to operate as no software is required, manual measurements can be done on the
drawing papers.
3. Allocation of mistakes
Doing measurement manually mistakes can be identified easily
Besides, users need to have ability to operate software efficiently in order to check for mistakes since the
measurement is auto-generated by the software
Manual measurement
Constraints
3. Longer time
• Manual measurement would take longer time as scale ruler is required to accurately measure the dimensions
of each design
PRE-CONSTRUCTION STAGE
BIM, CAD, AND MANUAL ENTRY
Benefits of BIM
Promotes better understanding of
designs
• By creating a visual environment for everyone involved in
the construction industry.
• Provides a platform for efficient collaboration, review and
feedback
Safer
Designs are safer
more well-planned, coordinated and has minimal re-
work.
Reduce risk.
Constraints of BIM
Incompatibility between partners.
Not all companies have this software
Designs cannot be shared through BIM.
Speed up processes.
Ensure drawings, reports, specification and bill of materials to be done easier and
faster.
Helps the designers to send the product drawings and specifications at a faster speed
to the contractor and engineers.
Constraints of CAD
High initial cost
Not be suitable for small companies which have lower budget.
Must allocate training cost.
Relatively easier
Just need our knowledge on measurement calculations and experience in the
field to measure any structural or architectural drawings.
Undertaking management
• can take out issues with respect to the plan of a building, spending control and
work execution easier
Speed of development (Construction)
• evaluate the changes, glitches and issues in the drawings for correction
High precision prompting waste lessening
• amounts extricated are sufficiently precise to think of a moreeffective
requesting process and limit the waste and storage room on-site.
Constraints of BIM
Outer parameters
• does not mull over the external components during construction
Progress from drafting to modeling
• required expertise work force with top to bottom comprehension of the
undertaking and the materials utilized
Institutionalization system
• there may be conflicts between parties engaged with the undertaking, for
example, correspondence breakdown
Benefits and Contraints of CAD
Enhances communication
process by means of clearness Constrained measurements
• diminishes misinterpretations and • extra efforts are required to carry
vulnerability in understanding the on the measurements (volume)
designs. while continuing for 3D illustrations
• Getting reconsidered and refreshed Working expenses on-site
plans to the teams is more easier.
• utilization of CAD at construction
Institutionalization technique sites may strife organization
and procedure monetary administration policies.
• CAD frameworks help for • charge PC assets for project
standardizing the design, drafting overhead
and documentation methodology
Benefits and Constraints of Manual
Measurement
Cost Effective
• the cost is primarily on the printing Longer time consuming
of the archive • manual recalculation is required if
No Training Required there any changes in construction
• technique and procedures of Dimensional limitation
measurement are standardized and • doesn't offer the 2D, 3D, 4D or 5D
done physically amid their tertiary administrations of software
education
• firms who are utilizing programming
need to send crisp graduates for a
training program for preparation