9 IDC New Product Development Simplified
9 IDC New Product Development Simplified
1
Traditional Product Development
https://www.youtube.com/watch?v=w2m5eU8XDVI
• Business strategy where tasks are done in parallel and there is an early consideration of every task
• Structured approach which builds a common platform among cross functional teams and stakeholders
• Address the Business need for creating new products within defined schedule.
• Cross-functional reviews
• Risk management (Identification, Abatement & Control)
• Manufacturing, Service, Marketing, Sourcing reviews
• EHS, Safety, Regulatory and agency requirements
• Supplier selection process
R6 • Transition to Production/Audits
• Project Log Book
Business Need
Project Scoping Concept Development Concept Prediction Design Validation Product Launch
Optimize Designs
Develop concepts Build System models
Identify Critical SubSystems Error Proofing
Identify transfer functions Generate Transfer functions
DFSS Set Quality goals
Generate Metrics Process capability flowup
Tolerance allocations
QFD Generation Control plans developed
Start Risk assesment Control Risk assessment
Documents transition to Systems
4
Detailed Design Process
Joint Workshop
Review s, Toll gates plans
Activities sharing to complete product definition
Sourcing & Manufacturing activities
Location of Prototype builds and testing
Arcelik & Msat Joint Activity
Phase wise Technical Review
Line set up
Prototype parts timeline w ith Arcelik Vendors
Checklist
Specification freezing & Ideation phase
Develop QFD
DC Evaluation
Identify required tolerance loops Msat Arcelik Arcelik
DC Field Test Arcelik Msat
Possible patent infringement issues Arcelik Msat Arcelik
Release for reliability fixtures Msat Arcelik Arcelik Primary Secondary
Risk analysis Msat Arcelik Arcelik
Part/Sub asm Reliability Msat Arcelik
Activity Arcelik responsibility responsibility
Styling & IDO models finalized Arcelik Msat Arcelik
Tol Loops Msat Arcelik
Update Design Msat
Program Details
• Project Type – New Platform
• Target Market – North America & Europe
• Variants -15 SKUs
• Estimated Annual Units - 75,000
• Price POINT - $1500 - $3500
• Market Size of Bottom Freezers ~ 30%
Business Impact
• Time to launch – 22 Months
• Project Cost ~ $40MM
• Payback – 18 Months
6
Key Stakeholders
PIVA,
Italy
R&D HQ,
USA
Sourcing,
China
MFG Plant
Mexico TechM
India
Sourcing,
Brazil
Stakeholders
Appliances Customer, USA – Program management
MFG Plant, Mexico – Manufacturing Site
PIVA,Italy – Major tools supplier
TechM, India – Design Management/CAD/CAE
Sourcing Team, China – Major component suppliers
Sourcing Team, Brazil – Strategic components suppliers
7
Business Need
Project Implementation
Design Validation
Concept Prediction
Concept Development
Project Scoping
Business Need
• Customer Surveys
• Focus Groups
• Interviews
• Complaints
• Benchmarking Data
• Executive Level Discussions
• Business Goals
• Function Specific Discussions
• Market Strategies
Project Scoping
• Quality Functional Deployment is a powerful tool Business Need
Customer Wants
HOW 1
HOW 2
HOW 3
HOW 4
HOW 5
HOW 6
HOW 7
Technical Requirements 65
Need 1 5 H L L M
Need 2 5 H 45
Need 3 3 M M L 21
Part Characteristics
Need 4 4 H 36
Need 5 2 L M 8
Need 6 4 M L H 52
Manufacturing Process Need 7 1 L M 4
3 mils
40 psi
8 atm
12 in.
1 mm
3 lbs
3
Production Requirements 57 41 48 13 50 6 21
• Industrial Design renderings generated for appearance related specs Concept Prediction
Concept Development
Project Scoping
Concept Development
• Benchmarking with similar designs
Project Implementation
Design Validation
• Concept Selection tool used to identify the Concept Prediction
Project Scoping
• Concept selection tool directs for selecting the Business Need
11
Competitive landscape analysis
Product
Patent Issuing Date of Date of Cabinet Type of Reliability/ Door Vs.
Item Cost Technical Issues Synopsis
Number Company Application Publication Location Execution SCR Risk Cabinet
Estimate
Gasket scrub
Design based on opposite pole magnets kept on
Door drop
EP 0940 643 Gasket-to- both french doors inside a gasket and sealed with
1 Camco Inc 2/19/99 8/9/99 External M Gasket comp H Door Only
A2 Gasket the gasket in the middle from top to bottom.Used on
Sweat issues
commercial Freezers
Heat leak
Gasket scrub Design based on opposite pole magnets kept on
Door drop both french doors inside a gasket and sealed with
EP 0962 730 Gasket-to-
2 Camco Inc 5/20/99 8/12/99 External M Gasket comp H Door Only the gasket in the middle from top to bottom.Used on
A2 Gasket
Sweat issues commercial Freezers. Design is more emphasised
Heat leak on corner seal inside between the french doors.
Refirgerator with a chiller compartment inside the
Plastic links over Fresh food door secured to the fresh food door
US
Gasket-to- load and abuse which has a french door to access the food contents
3 2003/0024265 Maytag Inc 7/15/02 2/6/03 Internal L M Door Only
Gasket conditions may or beverages inside the chiller compartment. Design
A1
affect over life doesn’t emphasize more on sealing between the
doors bu
Gasket scrub Design based on opposite pole magnets kept on the
Door drop iside of both french doors with gasket and sealed
Gasket-to-
4 US 4226489 Whirlpool Corp 5/14/79 10/7/80 External M Gasket comp H Door Only with the gasket in the middle from top to bottom. An
Gasket
Sweat issues air pocket is created when both doors are closed
Heat leak and that retains and reduces heat loss.
Too many moving
parts. Hinge
lubrication due to
moisture issues
near mullion.
French door sealing in the middle with articulated
Tampering with the
Sanyo Electric Articulating Cabinet & mullion and gaskets which are fixed to the french
5 US 4711098 10/10/86 12/8/87 External H articulating mullion H
Co, Ltd Japan Mullion Door doors and guides provided on the case for the
may cause door not
articulated mullion
to close and SCR.
Sweat issue. Food
spillage on tracks
and guides of
articulated mullion
12
Generate System level Quality dashboards
Design Validation
Concept Prediction
Concept Development
Project Scoping
Business Need
Drawing
Release
Soft Tooling
14
Design Validation
Design Validation
Concept Prediction
Concept Development
Project Scoping
Business Need
15
Project Implementation
Project Implementation
• Seamless transition of Design to Manufacturing Project Implementation
Design Validation
Concept Development
Business Need
16
17
Design Maturity – Case study
• Designed to Support push pull feature – New design to market ,Patent Filed
• Harness clips and the water tube holding clips added for Simplifying assembly
• Snap design for Funnel-Eliminating screw and simplifying the assembly
• Simplifying the Dispenser Tube and designed grommet for easy assembly
DC
DG
18