7SD52
Distance relay
7SA52
X21
G703.1 PCM SDH PCM
820 nm e multi- multi-
o
Option: o comms-network e
max.
3 km
plexer plexer
I-REGB Comms-
time converter
synchronisation G703.1: 64 kBit
X21: N*64 kBit (1N8)
Protection interface 2
Port E
Remote line end 2
2
Synchronous N x 64kB/sec D5
7S Plug in
modules
Protection interface 1
Remote line end 1 Port D
Synchronous N x 64kB/sec
Main processor
board of the relay
trip stage.
Dynamic increase of differential setpoint during
switch-on of long lines / cables (settable time)
CT saturation detector (only 5 ms saturation free
time due to external faults necessary)
Phase selective intertrip within 15 ms
Settable delay time for single phase
faults (feature for inductive compensated
networks)
Option: Inrush 2nd harmonic restraint with
vector group adaption. Undelayed trip for high
fault currents
Optional Lockout function
I1
IDiff I2
IN
Tripping I2 I3
I3 area
Restraint I1
area
IDiff>
I1
I
Phasor summation:
IDiff = I1 + I2 + I3 IN
Error summation: I = IDiff> + Linear CT-error ( IK ) + Syncronization error
Trip, if diff.current exceeds the max. permissible error
Protection and Substation Control EV-S_V13_17.07.00- 8
To complete the 7SD52
Additional functions
side 3
I2 I2
Connection to
side 3
other diff. relays
I3 I3+I1 I2 I3
I1+I2 I3
I1 I1
I3+I1
I1+I2
side 1 side 1
PI - Protection Interface
PI1
PI2 PI1
PI - Protection Interface
CB test trip
IL2_2 Counting of faulty telegrams in % per minute and hour
Activation of binary inputs and outputs by operating
IL3_2
software DIGSI 4.
IL3_1 Display of the status of binary inputs
Test telegrams to the substation control system
Automatic Switchover from 3 line to 2 line end
configuration (while commissioning 3rd line end)
Complete commissioning support with DIGSI 4 and
browser based PC-software
Protection and Substation Control EV-S_V13_17.07.00- 14
Browser based commissioning aid
-2
-1
-0
0,0
1,5
I/A
0 iEe -0,075 iL1 -0,050 iL2 -0,025 iL3 0,000 0,025 0,050 0,075 0,100 0,125 t/s
U-2
-8
-6
-4
2
4
6
8
/V
0 uL1 -0,075 uL2 -0,050 uL3 -0,025 0,000 0,025 0,050 0,075 0,100 0,125 t/s
Protection and Substation Control EV-S_V13_17.07.00- 16
Prefault and fault conditions in the vector diagram