0% found this document useful (0 votes)
201 views

Cold Start Up

The document provides a procedure for cold start up of a turbine. It involves warming up and commissioning various systems like steam, condensate, lube oil, and drains. Parameters are raised gradually while monitoring turbine readings. The turbine is rolled at low speed and warmed up before synchronization. Minimum load is held for 10 minutes after synchronization before further loading in steps while keeping steam conditions steady and within stress limits of the turbine.

Uploaded by

Jijo Jose
Copyright
© © All Rights Reserved
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
201 views

Cold Start Up

The document provides a procedure for cold start up of a turbine. It involves warming up and commissioning various systems like steam, condensate, lube oil, and drains. Parameters are raised gradually while monitoring turbine readings. The turbine is rolled at low speed and warmed up before synchronization. Minimum load is held for 10 minutes after synchronization before further loading in steps while keeping steam conditions steady and within stress limits of the turbine.

Uploaded by

Jijo Jose
Copyright
© © All Rights Reserved
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 31

TURBINE COLD

START UP
PROCEDURE
Initial Condition of Turbine

Turbine is under Cold condition


HP & IP starting probe temp is less than
1500C
AOP,JOP & OVEF in service
TG Rotor on Turning Gear
Speed = 19
Ensure all related work permits are returned
Ensure TG rotor is on Barring Gear (in auto) &
all oil pumps in auto
Ensure sufficient CST level & keep one hot well
make up in service with recirculation
Ensure adequate level in condenser Hot well.
(About 650mm)
Ensure Deaerator at adequate level (About
2500mm)
Ensure one CW pump is running
Ensure one TCW booster pump & CCW pump
in service with one PHE
Ensure Turbine Lube oil cooler water valves in
open condition
Ensure all the Turbine drain valves (MAL-
12,13,14,22,23&24) & MST,CRH and HRH line
drains MOV & GV in full open condition
Ensure drain before Boiler Main Stop valve in
open condition (MOV & GV)
Ensure drain before MST to AST PRDS in open
(MOV & GV)
Ensure AST header atmosphere drain in open
Ensure Main Ejector PCV in Auto & in Full open
condition (Pr. Set at 15 Bar)
Ensure opening of Steam trap GV & Bypass valve
in Seam of Main Ejectors & open one of the Main
Ejectors steam valve
Ensure full opening of drain before HP Bypass
valves. (Steam trap GV & Bypass valve)
Ensure opening of Stem trap GV & its Bypass
valves in the seal steam header drain line.
Ensure charging of BFPs & charge the feed line
through gravity by opening the discharge valve
& release the air
Ensure charging of CEPs
Start one Boiler Feed Pump & charge the Feed
Water circuit including HP Heaters & keep
another BFP in standby
Start one CEP & charge condensate circuit
including LP Heaters
Start The TV camera pump after venting
Start second CW pump
Open Bypass valve of Boiler Main Stop Valve
Start warming up of MST to AST PRDS
Ensure running of one Oil pump in HP Bypass
OSU & check for Oil leak at HP & LP Bypass
valves
Commission MST to AST PRDS & put AST
Pressure & Temperature control in Auto (set at
15 Bar & 3000C). Maintain AST header
pressure above 15 Bar.
Warm up the Boiler & FOPH steam line from
AST header
Warm up Deaerator preheating line & start
preheat the Deaerator tank (Keep Deaerator
motorized vents full open)
Warm up AST to Pilot Ejector & Seal Steam
system
Open the Main Valves at AST header for Boiler
& FOPH Steam lines
Ensure AST header pressure above 15 Bar &
Temp above 2500C
Commission AST pegging steam to Deaerator
& gradually raise the Deaerator pressure to
1 Bar
Prepare the system for Condenser Vacuum
raising (For Turbine Seal steam admission
minimum 500C super heat is necessary)
Ensure Main Ejectors siphon filling line is in
Open Condition
Start Vacuum pulling through Pilot Ejector
(Before raising vacuum ensure TG Rotor on
Barring Gear and Re-Heater drains & vents at
Boiler side closed)
When the vacuum is about 0.2 Bar (a), open
the Boiler Main Stop Valve (Take care of Drum
Level)
Close Drain Valve before Boiler Stop Valve
Ensure full vacuum is reached
Commission the HP & LP Bypass system and
keep in Auto
Ensure minimum super heat of 500C for HP B/P
opening
Ensure initial opening of HP B/P valves always
above 20% (Take care of Drum Level)
Close Steam Trap B/P valve in the drain line
before HP B/P valves
Ensure LP B/P pressure set at 7 Bar in full Auto
& check for opening of LP B/P valves
Ensure opening of HP & LP Bypass valves
above 20% (Check for temp pick up at the
Turbine)
Commission one Main Ejector when Main
Ejector steam pressure at 15 Bar & Temp is
above 2500C and close Pilot Ejector air valve
Maintain Main Ejector shell level by 250mm
(Observe for any vacuum drop)
Open CRH to Deaerator pegging steam valve
and maintain Deaerator pressure above 1 Bar
Ensure all the Turbine drain valves (MAL Valves) &
MS,CRH & HRH line drains valves in open condition
Prepare the system for Turbine reset
When MS Pressure >35 Bar & Temp above 3000C
RESET the Turbine for Opening of HP&IP stop valves.
(Ensure minimum Superheat of 500C)
Confirm of HP&IP stop valves opening at local
Ensure no speed rising on operation of Stop valves
Open LP Heaters & Deaerator steam extraction valves
(MOVs & Extn. NRVs)
Ensure Condensate to LP Heaters are made through
Ensure LP Heaters drain condensate valves are in
Auto
Raise the MST Pressure gradually to 45 Bar
Ensure the Steam temp is not dropping below
3200C
Check for HP & IP stop valves metal temp
pickup
Keep the Pegging Steam to Deaerator in Auto
(AST & CRH)
Turbine Rolling Parameters

1. MST Pressure = 45/50 Bar


2. MST Temperature = 3700C
3. HRH Pressure = 7 Bar
4. HRH Temperature = 3500C

Ensure HRH Temp is always less than MST


Temp by 200C
Ensure Turbine Drain valves open
(Choke MS line drain by 50%)
Record Rolling parameters, Turbine metal Temps and
supervisory readings
Switch ON Turbine RSE
Start Turbine Rolling (Target Speed 501 rpm &
Acceleration 5%)
Ensure Turning Gear got disengaged on Rolling
Check the Turbine supervisory readings and observe
HP & LP De, Axial Shift, Shaft vibration & Bearing
metal Temp
At 500 rpm warm up the Turbine for 30 min (Turbine
soaking for 30 min)
Keep steam parameters steady
Check for HP&IP starting probe temp pick up
Start further Speed rising of Turbine (Target
speed 3000 rpm & Acceleration 5%)
Check the Turbine supervisory readings and
observe HP & LP DE, Axial Shift, Shaft
Vibration & Bearing metal temp
Record Maximum vibration during speed rising
(In the critical speed range, Auto acceleration is
10%)
Check for Opening of LP Exhaust hood spray
at 1500 rpm
Check the Lube Oil Temp (about 450C)
Observe Turbine Stress Margin
Observe HP Turbine exhaust temp & should
not exceed 4500C
Ensure stoppage of Auxiliary Oil Pump and
jacking Oil Pump at 2700 rpm & observe the
Lube Oil header pressure
Ensure Turbine RSE is ON & Enabled
On Synchronizing check the control valve open
demand rises by 5% for initial load pick up &
check for the load rising
Close MS line drain valves fully
Slowly raise the load till HP & LP Bypass valve
closure
If HP/LP Turbine stress margin is dropping, DO
NOT raise the load (Take care of Drum Level)
Hold 10/20 min. at this load depending on
Turbine Stress Margin
Ensure Closing of LP exhaust hood spray at
10% load
Ensure closure of Turbine drain valves, HRH &
CRH drain valves at 15% Load on Auto (Close
the GV of MOV if necessary)
Ensure turbine Follow Mode is selected
automatically on full closing of HP & LP Bypass
valves and ensure HP Bypass pressure set on
full Auto
Slowly close the Pilot Ejector steam valve
Close Deaerator Start up vents
Close steam trap bypass valve in the seal
steam header drain line
 Check Turbine Stress Margin for Parameter
raising (Margin must always be above 1%)
 Observe HP & LP DE for any abnormality
 Rate of parameter raising.
 Load :1.5 MW/min
 MS pressure : 0.2 bar/min (up to 70 bar)
 MS pressure : 1.2 bar/min. (above 70bar)
 MS Temp : 1 0C/min. (Up to 490 0C)
 MS Temp : 1.5 0C/min. (above 490 0C)
(Take care of Turbine thermal stress)
 Ensure take over of Turbine self-sealing and
open CRH steam to seal header MOV
 Charge CRH to AST PRDS
 Raise MS pressure gradually depending upon the
Steam Purity and Silica value (MS & Condensate
silica must be less than 20 ppb)
 Load the Turbine slowly on observing HP & LP
DE and Stress margin
 LOAD : 70 MW
 MS pressure : 60 70 bar.
 MS & HRH Temp : 450 OC.
(*** Ensure the Turbine control valves not opening full,
while raising the load ***)
 Start charging of HP heaters on steam side at a
load of 70 MW (Ensure FW to HP Heaters are made
through)
 Start one LP drain pump at a load of 90-100 MW
Start second BFP
Commission CRH to AST PRDS and set the
pressure at 15bar.Reduce MS to AST PRDS set
to 14 bar and ensure take over of CRH to AST
PRDS
LOAD : 90 MW
MS pressure : 70  80 bar.
MS & HRH Temp : 480 0C.
(If the silica value is high DONOT raise the load &
the pressure)
 LOAD : 110 MW
 MS pressure : 90 100 bar.
MS & HRH Temp : 500 0C.
LOAD : 140 MW
MS pressure : 110 120 bar
MS & HRH Temp : 520 0C

LOAD : 160 170 MW


MS pressure : 130 bar
MS & HRH Temp : 535 0C

LOAD : 210 MW
MS pressure : 146bar
MS & HRH Temp : 535 0C
 Put CMC mode into service& enable Frequency
influence.
TURBINE START UP PARAMETER
ESV & ISV Warm Up
HPT – Turbine Rolling Min Load
for 10 min
Sl. RSE after
No Probe SH3 O/L RH2 O/L Acc Holding synchronize
MS Pr & HRH Pr
Temp Pr & Pr & Rate Time at & Hold Time
Temp & Temp
Temp Temp % 500 rpm

Below 30 Bar 7 Bar 45-50 Bar 7 Bar 20 MW


1 5 30 min
1500C 3000C 2500C 3700C 3500C 10 min

1500C 40 Bar 7 Bar 20 MW


7 Bar 50-60 Bar
2 to 325 - 350 - 7 20 min
3000C 4000C 10 min
2500C 3500C 3750C
2500C 60-70 Bar 7 Bar 70-80 Bar 7 Bar 20 MW
3 to 375 - 350 - 400 - 350 - 10 10 min
3500C 4500C 4250C 4500C 4250C 10 min

3500C 80 Bar 7 Bar 80-100 Bar 7 Bar


30 MW
4 to 450 - 400 - 450 - 450 - 10 5 min
5 min
4500C 4800C 4800C 5000C 5000C
4500C 100 Bar 7 Bar 40 MW
100 Bar 7 Bar Direct
5 and 500 - 500 - 10
5000C 5000C 3000 rpm 5 min
above 5200C 5200C
Start Up Limiting Factors
Thermal Stress
 Non steady state operation such as start up,
shutdown & load changes give rise to Thermal
Stresses
Vibration
 Excessive vibration affecting a machine can be
originated by improperly balanced or bowed Rotor
Differential Expansion
 Sudden loading & Unloading can give raise to
excessive temp differences between Rotor &
Casing. This is due to differences existing between
Mass & Surface area of the parts concerned
Turning Gear Operation
Its very important that Turbine shaft is turned by
the turning gear for a sufficient period of time
before a start-up is initiated, even if the turbo-
group is in cold condition.
Turning Gear times are:

Shaft Stand still Min. Turning Gear Time


Less than 1 day 2 Hours
Up to 7 days 6 Hours
From 7 to 30 days 12 Hours
Over 30 days 24 Hours
Critical Speed Range
Speed up must never be stopped when in
the range of following critical speeds

Critical speed range:


0800 – 0900 RPM
1560 – 1700 RPM
2000 – 2450 RPM
Differential Expansion
Differential Expansion should be watched
during load increase as well as load
decrease
Positive Expansion (+ve) mean the Rotor
Shaft is longer than Cylinder Body (During
Loading)
Negative Expansion (-ve) mean the Rotor
Shaft is shorter than Cylinder Body
(During Unloading)
Temperature at the HP Steam Exhaust
The HP exhaust steam temp limiter provides for
limiting the exhaust steam temp by acting on
both MST & RH control valves
Moreover during a load rise when coming fron
no-load or low load condition, care shall be
exercised that no allowable cooling down
gradients occur at the HP exhaust steam outlet
Allowable values given below:
 Sudden Temp change :500C
 Temperature gradient :1.30C/min
Under normal condition this is governed by the
HP cooling down limiter
LPT Ventilation Safety
On No-Load/Low Load operation for a certain
time length & concurrent bad vacuum he
turbine temp can become to high through the
ventilation

Values for Spray Water Exhaust Hood system


 >750C : Opening Spray valve

Boundary value for LP blading temp


 >1800C : Alarm
 >2000C : Tripping