Major Tenders Awarded & Under Process Till Date

The document lists major tenders that have been awarded and are under process for the Pune Metro rail project. It notes that contracts have been awarded for the design and construction of viaducts, elevated stations, and environmental and social impact assessments. Upcoming tenders mentioned include more design and construction work, including additional viaducts, stations, tunneling, depots, track materials, and power and signaling systems.

Uploaded by

Tushar Sharma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views2 pages

Major Tenders Awarded & Under Process Till Date

The document lists major tenders that have been awarded and are under process for the Pune Metro rail project. It notes that contracts have been awarded for the design and construction of viaducts, elevated stations, and environmental and social impact assessments. Upcoming tenders mentioned include more design and construction work, including additional viaducts, stations, tunneling, depots, track materials, and power and signaling systems.

Uploaded by

Tushar Sharma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 2

MAJOR TENDERS AWARDED & UNDER

PROCESS TILL DATE


 Design & Construction of 10.92 Km. Viaduct from PCMC to Range Hill- Awarded to M/s NCC Ltd.
 Design & Construction of 7.15 Km. Viaduct from Vanaz to Civil Court- Awarded to M/s NCC Ltd.
 Construction of 9 Elevated Stations from PCMC to Range Hill- Awarded to M/s HCC-Alfara’a JV
 Construction of 8 Elevated Stations from Vanaz to Civil Court- Under Evaluation & Likely to be awarded in
November.
 Detailed Design Consultants for 9 Stations from PCMC to Range Hill- Awarded to M/s Ayesa
 Detailed Design Consultants for 12 Stations from Vanaz to Ramwadi- Awarded to Ms LKT-Hafeez
Contractor JV
 Environmental Impact Assessment for 1.7 Km Alignment passing near Mutha River- Awarded to M/s
MITCON
 Environmental Impact Assessment for both the corridors of Pune Metro- Awarded to M/s RITES
 Social Impact Assessment for both the corridors of Pune Metro- Awarded to M/s CMRSD Pvt. Ltd.
MAJOR UPCOMING TENDERS

 Design & Construction of Viaduct in Reach-3 of Approx. length 7.5 Km.


 Construction of 7 Elevated Stations from Civil Court to Ramwadi.
 Design & Construction of Tunneling Section from Range Hill to Swargate.
 Construction of 2 Metro Rail Depots in Vanaz & Range Hill.
 Supply of Track Materials (HH Rail, Turnout & Fastening).
 Design & Construction of Ballastless Track in Pune Metro.
 Supply, Installation, Testing & Commissioning of OHE Cables for both Corridors of Pune Metro.
 Supply, Installation, Testing & Commissioning of Power Supply Substations of Pune Metro.
 Supply, Installation, Testing & Commissioning of CBTC Signalling System for Pune Metro.