This document summarizes Chapter 8 of the book "Simulation with Arena" which discusses entity transfer in simulation models. It describes different types of entity transfers including resource-constrained transfers where the number of entities in transit is limited, and transfers using transporters and conveyors. It provides an example model of a small manufacturing system where parts are transferred between work stations using two carts as transporters. The distances between stations are defined, and the transporters and their movements are animated in the simulation model.

Uploaded by

daselknam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
108 views

Entity Transfer: Simulation With Arena, 4 Ed

This document summarizes Chapter 8 of the book "Simulation with Arena" which discusses entity transfer in simulation models. It describes different types of entity transfers including resource-constrained transfers where the number of entities in transit is limited, and transfers using transporters and conveyors. It provides an example model of a small manufacturing system where parts are transferred between work stations using two carts as transporters. The distances between stations are defined, and the transporters and their movements are animated in the simulation model.

Uploaded by

daselknam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 25

Entity

Transfer

Chapter 8

Last revision August 26, 2005

Simulation with Arena, 4th ed. Chapter 8 – Entity Transfer Slide 1 of 25


What We’ll Do ...
• Types of Entity Transfers
• Model 8-1: Resource-Constrained Transfers
• Models 8-2, 8-3: Transporters
• Conveyors
 Model 8-4: Non-accumulating
 Model 8-5: Accumulating

Simulation with Arena, 4th ed. Chapter 8 – Entity Transfer Slide 2 of 25


Types of Entity Transfers So Far
• Connect
 Zero-delay
 Connection graphic vs. module Labels (no graphic)
• Route
 Non-zero-delay — constant, r.v., expression
 Stations, animated Routes
 Fixed routes vs. entity-dependent Sequences
• Connect and Route both assume:
 No limit on number in transit at a time
 Entities have their own feet

Simulation with Arena, 4th ed. Chapter 8 – Entity Transfer Slide 3 of 25


New Types of Entity Transfers
• Resource-constrained transfers
 Limit total number of entities in transit at a time
 Entities still have their own feet
 Telecommunications (number of packets),
logistics (number of vehicles)
• Material-handling devices
 Transporters – fork lifts, trucks, carts, wheelchairs
– Usually place limits on numbers, capabilities of transporters
– Like a Resource, except moveable
 Conveyors
– Belts, hook lines, escalators, freeways
– Usually limit space on conveyor, speed
– Non-accumulating vs. accumulating
Simulation with Arena, 4th ed. Chapter 8 – Entity Transfer Slide 4 of 25
Model 8-1: Small Manufacturing System
with Resource-Constrained Transfers
• Original system (Model 7-1) assumptions
 All transfer times = 2 minutes … keep (for now)
 Parts have their own feet … keep (for now)
 No limit on number of parts in transit at a time … dump
– Now – no more than 2 parts can be in motion at a given time
– If other parts are ready to go, they must wait until there’s room to go
• Model via existing constructs — think creatively
 Model “space” on the “road” as a Resource
 Limit the number of Units of this Resource
 Entity must Seize unit of “space” resource before beginning
trip, Release it at end of trip

Simulation with Arena, 4th ed. Chapter 8 – Entity Transfer Slide 5 of 25


Two Ways to Model Resource-
Constrained Transfers
• Both use a new Transfer Resource representing
space on the transitways
 Capacity set to 2 in Resource data module
• Maybe the most obvious way (but won’t do) …
 Before each Route module insert a Seize module to Seize
one unit of Transfer (queue, priority details … see text)
 After each Station module (except Order Release) insert
a Release module to free up one unit of Transfer
 Shared vs. separate queues (details in text)
 Can’t animate entity movement

Simulation with Arena, 4th ed. Chapter 8 – Entity Transfer Slide 6 of 25


Two Ways to Model Resource-
Constrained Transfers (cont’d.)
• Different way (will do, to illustrate new modules,
set up for transporters and conveyors)
 Replace Route modules with Leave modules (Advanced
Transfer panel)
– Transfer Out: Seize unit of Transfer resource before leaving
station
Resource, Resource Set, particular member of a Resource Set
Can specify priorities
– Also contains the Route-module logic, options
– Get individual queues, with animation, for parts waiting to go
 Replace Station modules with Enter modules (Advanced
Transfer panel)
– Defines the Station
– Option of an unload Delay time (0 for this model)
– Transfer In: Release Transfer resource
• Effect – slight increase in cycle times in system
Simulation with Arena, 4th ed. Chapter 8 – Entity Transfer Slide 7 of 25
Transporter Concepts
• Carts, fork lifts, trucks, wheelchairs, people, …
• When entity is ready to go somewhere, it needs
to be “picked up” and moved
• Use Transporters — “moveable” resources
• Activities: Request, Transport, Free
 Transporter Selection Rule: If > 1 transporter is available
when Requesting
 When freed and > 1 entity is waiting: Priorities, closest one
• Two types of Transporters
 Free-Path (will do)
– Travel time depends only on velocity, distance
– Ignore “traffic jams” and their resulting delays
 Guided (won’t do)
– AGVs, intersections, etc.
Simulation with Arena, 4th ed. Chapter 8 – Entity Transfer Slide 8 of 25
The Small Manufacturing System with
Transporters
• Have two carts to transport parts
 A cart can carry one part at a time
 Carts move at 50 feet/minute
– Will need to specify accurate distances between Stations
 It takes 0.25 minute to load part on a cart, 0.25 minute to
unload it from a cart
• Modify Model 8-1 to Model 8-2

Simulation with Arena, 4th ed. Chapter 8 – Entity Transfer Slide 9 of 25


The Small Manufacturing System with
Transporters (cont’d.)
• Create Transporter in Transporter data module
(Advanced transfer panel)
 Name = Cart, Number of Units = 2, Velocity = 50
 Default the Distance Set (later), Units = Per Minute, Initial
Positions
– Mind the units – consistency here, in Distance Set (later)
• Animation picture for Cart Transporter
 Transporter button , Animate Transfer toolbar
 Identifier = Cart, pictures for Idle, Busy, Inactive states
 Draw or copy from .plb picture libraries
 Ride point (details in book)
 Drop it anywhere in flowchart view (hidden during run)
Simulation with Arena, 4th ed. Chapter 8 – Entity Transfer Slide 10 of 25
The Small Manufacturing System with
Transporters (cont’d.)
• Request a Cart – modify existing Leave modules
 Delay = 0.25 Minute for load time
 Transfer Out = Request Transporter
 Transporter Name = Cart
 Selection Rule = Smallest Distance
– Applies when > 1 transporter is available
– Others: Cyclic, Random, Preferred Order, Largest Distance (???)
 Save Attribute = Cart # (remember which cart … for later)
 Connect Type = Transport
– Move Time disappears … determined by Velocity, Distances (later)
 Station Type = By Sequence
• Instead of Leave: Request-Delay-Transport
 More complex, more flexible – details, examples in text
Simulation with Arena, 4th ed. Chapter 8 – Entity Transfer Slide 11 of 25
The Small Manufacturing System with
Transporters (cont’d.)
• Free the Cart – modify existing Enter modules
 Delay = 0.25 Minute for unload time
 Transfer In = Free Transporter
 Transporter Name = Cart
 Unit Number = Cart # attribute of part entity
• Instead of Enter: Station-Delay-Free
 More complex, more flexible – book has details, examples

Simulation with Arena, 4th ed. Chapter 8 – Entity Transfer Slide 12 of 25


Distances for Transporters
• Define contents of Distance Set Cart.Distance
• Distances (in feet) moved by parts:

Units!!

 Blank cells: part movements that don’t occur


• Enter these data in Distance data module
(Advanced Transfer panel)
 Name = Cart.Distance
 Stations button, add 11 rows with Beginning Station, Ending
Station, Distance for above data Units!!

 Direction is implied; could be asymmetric Why are there 25 rows?


Simulation with Arena, 4th ed. Chapter 8 – Entity Transfer Slide 13 of 25
Animating Transporter Movement
• Add distances to animation
• Delete all the old Route Path animation objects
 But leave the Station animations
• Add animated transporter distances with
Distance button , Animate Transfer toolbar
 Dialog, placement similar to Route Paths
 Identifier = Cart.Distance
 Select “From” Station, “To” Station
 Options for Rotate, Flip
 Single-click to create “From” Station marker, then clicks for
corners, then double-click to create “To” Station marker
 Snap to Grid to help place animated transporter distances
Simulation with Arena, 4th ed. Chapter 8 – Entity Transfer Slide 14 of 25
Parking Areas for Transporters
• Animate transporters when they’re free
• Parking button , Animate Transfer toolbar
 Like a Queue animation – Point vs. Line, Shift, Rotate
 Cursor becomes cross hairs, click near lower left of Station
marker to start, click for first Point or head of Line
 More clicks for more Points (double-click to end), or second
click to end Line
 Want enough points/space for all transporters (2 here)
 Repeat for all Stations where Transporters could be freed

Simulation with Arena, 4th ed. Chapter 8 – Entity Transfer Slide 15 of 25


More Distances — Empty Transporters
• Above Distances incomplete — only for part
movements along their sequences
• Transporters must also move when empty
(deadheading)
 In general, n(n - 1) distances need definition for network
with n nodes
 Some not possible — Order Release to Exit System
• 14 more distances to define in Distances data
module (not grayed):

Simulation with Arena, 4th ed. Chapter 8 – Entity Transfer Slide 16 of 25


Model 8-3: Refining the Animation for
Transporters
• Part Entities disappear from animation when
waiting to be picked up by a Cart Transporter
after Transporter has been allocated
 Model logic OK … get right answers … animation is flawed
 Actually, animation is OK when part’s waiting before
Transporter is allocated
• Solution – Storage for entity to reside in, be
animated, while it waits for something (here, a
Cart Transporter)
 Can get statistics on numbers in Storages
• But Storages not available with modules from
Advanced Transfer panel
 Use lower-level SIMAN modules from Blocks panel … see
book for specific details
Simulation with Arena, 4th ed. Chapter 8 – Entity Transfer Slide 17 of 25
Conveyors
• Replace Transporters with a conveyor
• Loop conveyor to follow main path, clockwise
• Six entrance/exit points
 Load, Unload takes 0.25 minute
 Each part is 4 feet per side, but want 6 feet of conveyor
space for clearance on corners
• Speed = 20 feet/minute Units!!

• Distances:

Simulation with Arena, 4th ed. Chapter 8 – Entity Transfer Slide 18 of 25


Conveyor Concepts
• Entity to be conveyed must wait for space
• Conveyor consists of cells
 Equal size, constantly moving – think of a narrow escalator
• Entities might require multiple contiguous cells
• Must define cell size; tradeoff involved:
 Small cells: accurate model but slow execution
 Large cells: just the opposite!
• Entities Access space, Convey, and Exit
• Conveyor = series of linear Segments
 Each segment starts and ends at a Station
 Link to form loops, diverge points, converge points

Simulation with Arena, 4th ed. Chapter 8 – Entity Transfer Slide 19 of 25


Types of Conveyors
• Both travel in a single, irreversible direction
• Nonaccumulating: belt, bucket line, escalator
 Spacing between entities on it doesn’t change
 Entire conveyor stops for entity Access/Exit if Load/Unload
time is > 0
• Accumulating: rollers, freeway
 Conveyor never stops moving
 If entity on it stops to Exit, other entities behind it are
blocked and bunch up (entities ahead of it keep moving)
 When blockage ends, blocked entities go on but maybe not
all at once (spacing requirements)

Simulation with Arena, 4th ed. Chapter 8 – Entity Transfer Slide 20 of 25


Model 8-4: Small Manufacturing System
with Nonaccumulating Conveyors
• Modify Model 8-1 (resource-constrained transfer)
• Define new Variables Load Time and Unload
Time, each with initial value 0.25
• Delete all the Route Paths
• Define Conveyor via Conveyor data module,
Advanced Transfer panel
 Conveyer = Loop Conveyor
 Segment Name = Loop Conveyor.Segment
 Type = Non-Accumulating
 Velocity = 20 (feet), Units = Per Minute Units!!
 Cell Size = 3 (feet) Units!!
 Max Cells Occupied = 2 (cells per entity)

Simulation with Arena, 4th ed. Chapter 8 – Entity Transfer Slide 21 of 25


Leave, Enter Modules for Conveyor
• Change each Leave module
 Delay = Load Time, Units = Minutes
 Transfer Out = Access Conveyor
 Conveyor Name = Loop Conveyor
 # of Cells = 2
 Connect Type = Convey
• Change each Enter module
 Delay = Unload Time, Units = Minutes
 Transfer In = Exit Conveyor
 Conveyor Name = Loop Conveyor

Simulation with Arena, 4th ed. Chapter 8 – Entity Transfer Slide 22 of 25


Conveyor Segments
• Define one-way lengths (in feet) of segments
• Segment data module, Advanced Transfer panel
 Name = Loop Conveyor.Segment
 Beginning Station = Order Release
 Next Stations button
– Name Next Stations in correct sequence
– Give distance in correct units (feet, here) to this next station
• Segment animation
 Put Station markers in front of each Resource picture
 Segment button , Animate Transfer toolbar
 Dialog, crosshairs, clicking just like Distances for
Transporters
– Except here, have to place only 6 Segment animations
Simulation with Arena, 4th ed. Chapter 8 – Entity Transfer Slide 23 of 25
Conveyor Statistics
• Run > Setup > Project Parameters to check
Conveyor Statistics
• Get percent of time blocked (stopped)
• Utilization statistic is average percent of space
occupied on conveyor (not percent of time that a
part was on the conveyor)
• To see conveyor stop (it’s nonaccumulating)
more clearly, change Load Time and Unload
Time to much greater values than 0.25
 Could do this during run with VBA (Chapter 10), or Run
Controller – see text for details – but makes output statistics
nearly impossible to interpret
Simulation with Arena, 4th ed. Chapter 8 – Entity Transfer Slide 24 of 25
Model 8-5: Change Conveyors to
Accumulating
• Conveyor module
 Change Conveyor Type to Accumulating
 Accumulation Length = 4 (in feet), amount of space the
accumulated parts need on the conveyor
• Running, see very little accumulation in
animation
 To see more, increase Load Time and Unload Time

Simulation with Arena, 4th ed. Chapter 8 – Entity Transfer Slide 25 of 25