INTRODUCTION
o the choice and efficient use of the correct types and size of
plant to meet the particular requirements of the site.
Related codes/standards
• BS 6031 : 1982 Code of practice for earthwork (BS 6032:2009)
• MS 1754 : 2004 earthworks – code of practice
• JKR Standard Specification for road works
• IEM Guideline for engineering practice (Earthwork)
• Uniforms Building By-Laws 1984 (Malaysia)
• Streets, Drainage & Building Act.
• Urban storm water management manual for Malaysia
• Others… BS 5930, Code of practice for SI, BS1377 – Soil testing,
ADTM… etc.
SCOPE OF EARTHWORKS
1. Site clearing (Pembersihan tapak)
4. Compaction (Pemadatan)
5. Sloping (Pencerunan)
1. Site clearing
• The sides of the excavations are required to remain stable during their
design life, can be achieved by:
• Lab tests are required to fully determine a soil’s physical and chemical
properties which control those characteristics.
Transport and moving
4. Compaction
• Increased compressibility
• Reduce permeability