To accomplish this, advances were necessary in rig design, equipment, bits, materials and
drilling techniques.
Varco continues to extend the threshold of Top drive technology with the introduction of a
complete line of AC top drive systems.
A new threshold in AC technology
For years the backbone of oil industry power has been the 1000 hp DC traction motor adapted
from locomotives.
DC
TDS-1
New
TDS-1
TDS-3
TDS-7
TDS-9
TDS-4
TDS-2 1981
ThetoIDS
AC
High
Integrated
–1
uses
TDS-3
becomes
Two Speed - 7.95 & 5.08:1 TDS-4 1983
Torque
Swivel
Upgrades
the
becomes
Single Speed - 6.67:1 TDS-5
are
First
NEW
Motors
a Locomotive
TDS-3H
ReducesAC
Industry
Varco’s
are
Dual
TDS-4H
Offered
Motor
Top
First
Industry
Single Speed - 5.33:1 TDS-3S
System
1988
Standard
ACDrive
Single Speed - 5.33:1 TDS-4S
Motor
Introduced
1989
Height
Two Speed DC - 5.33:1 @ 2,200hp
Portable
TDS-6S
Standard
1990
TDS-6SB
TopDrive
1991
Drive
Single Speed Planetary - 6:1 @ 1,150hp IDS-1
Top Drive Development
9,000
10,000
11,000
Depth Drilled (ft)
12,000
13,000
14,000
No Top Drive
Top Drive Installed
15,000
0 2 4 6 8 10 12 14 16 18 20
Drilling Days
Deviated Wells
Typical Horizontal Comparisons ~ 16,500’ Wells
11,000
12,000
13,000
Depth Drilled (ft)
14,000
15,000
16,000
No Top Drive
Top Drive Installed
17,000
0 2 4 6 8 10 12 14 16 18 20 22 24
Drilling Days
General Information
TDS- 9/11S Top Drive
PH-50 Pipehandler
50,000 ft.lbs Torque
15,000 psi Rated Dual IBOPs
Compact Link Tilt
Mousehole Kick-Out
Self-Locking Guide Beam
Ex and UL Electrical Models
25,250 lbs Unit Weight
Torque/Speed Curves
55,000
Torque (ft.lbs)
50,000
45,000 800hp
Version
40,000
35,000
30,000
25,000
20,000
700hp
15,000 Version
10,000
5,000
0
0 50 100 150 200 250
Rotating Speed (rpm)
TDS- 9/11S Power Train
Cooling Fan System Bail
Motor (2)
Hydraulic
Brake (2) Bonnet
10.5 : 1
Transmission
Drive Stem
Alternating Current Motor
Air Inlet
Rotor Assembly (550 CFM)
(Laminated)
End Coil
Stator Assembly
(Laminated)
Motor Frame
(Laminated)
End Coil
Motor Shaft
Air Exhaust
Guide
Pinion Gear Roller Bearing
PH-50 Pipe Handler
Back-Up Clamp
350T - 108”
Elevator Links
Adjustable
Stabbing Guide
350 or 500T
Elevators
PH-50 - Link-Tilt Positions
PH-50 – Kick-Out Option
Spreader
Beam
Optional
Mousehole
Kick-Out
Assembly
Center
Well
57.7” Max.
116” Ref.
Drill Stem Assembly
Lower IBOP
(Manual)
Saver Sub
Electrical Interface
DC Top Drive
Generator
Encoder
Drilling Motors
Mast
Saddle
or Generator Set
AC Highline
Variable Frequency
Inverter and Varco
Control Panel
Electrical
Panel
Service Solenoids
Loop
Sensors
Junction
Box
Varco
Skid
Driller’s
Console
Service Loop Configurations
Service
Cables J-Boxes
Connections
Land/ Quick 1 set (3) 444 MCM
Portable Disconnects + 1 x Composite N/A
UL
700hp
600 VAC
3-phase, 42-62Hz Resultant DC Pulse 810 VDC 20Hz = 600rpm
IGB Transistors
600 VAC
3-Phase, 0-80Hz
AC Power
Capacitors
Source
Rectifier
TDS-11S
40Hz = 1,200rpm
Inverter Controller
75’
Rotary Hose
Sectional Rathole
Guide
Beam
Mousehole
Universal
Spreader
Beam
Driller’s TDS-11S
Console
Unit Identification
Encoder Instruction Label
Located on the side
of the brake housing
Warning Labels
Located on the side
of each AC motor
Warning Label
Located on the
side of the bonnet
TDS-11S - Envelope
33.7” (856mm)
Rear
33.8” (859mm)
Standard Setback
32.0” (762mm)
22.8” (579mm)
21.1” (536mm)
22.1” (660mm)
31.0” (787mm)
32.6” (828mm)
88” Bail
214.0”
5.43m
5.82m
233”
2.85m
112”
28” 37”
0.71m 0.94m
56”
72”
1.42m
1.83m
62”
1.58m
Typical Mast Interface
Existing Travelling Equipment Crown
500 ton Hook/Block Combo Type 13.5’
Block Top 4.1m
TDS-11S
Varco Portable Top Drive System 13.5’
4.1m
Bail Rest
Service Loop
93.0’ (28.3m)
Portable Torque Reaction Beam
U-Bolted to Spanners
To CL of Beam
10.0’ (3m) min.
Power Supply
AC Power &
Cables Control Cables
TDS-11S - Consumables
Hydraulic Wash Pipe
Oil Filter
Stabilizers
Tong Dies
Stabbing Guide
Installation
Installation
Installation
Shackle
Lifting Points
For Lifting the Skid with
the Top Drive Attached
Bail Lock
Must be installed before
lowering/hoisting the
Top Drive to/from the skid
Lifting Points
For Lifting the Skid with
the Top Drive Attached
!Locking Pins
Must be in place prior to
moving the skid with the
Locking Pins Top Drive attached
Must be in place prior to
moving the skid with the
Top Drive attached
Installation TDS
Pre-installation
Checklist
The following assumes that all pre-installation planning and
rig-up is complete prior to installation of the guide beam
assembly and TDS-11SA. This includes:
. Make sure the derrick/mast is vertical, with the block over
the center of the rotary table.
. Derrick/mast modifications are completed (if required) and
the guide bean support bracket and torque reaction beam
are installed and inspected to conform to Varco
specifications as detailed in FIP00003.
. The service loop bracket is installed in the derrick/mast.
. The control panel and frequency drive are installed.
. Rigging of tong lines, etc. is inspected to ensure that
they will not foul with the TDS-11SA.
. The hook or adaptor becket is installed. The hook should
open toward the drawworks.
Installation TDS
Floor Clearance
Using the drawwork, hoist the top guide beam
to the hang-off link
Ensure that the shackle is pinned and it’s
cotter pin is in place
Pin the guide beam to the hang-off link in the
appropriate position
Check for 7 ft clearance from bottom of guide
beam to the drill floor
Secure the pin to the hang-off link with the nut
and safety pin
Guide Beams & Tie back
Check for Top Drive mainshaft alignment over
well center
Install the main spreader beam at the
Guide Beam
appropriate distance from well center Bottom Section
Install the tieback plate and tieback link
Check for Top Drive mainshaft alignment over
well center
Torque and lock wire all bolts
Tie-Back Plate
Main
Spreader Beam
Bolted Connections
Tie-Back Link
Auxiliary
Spreader Beam
Mast Leg
Guide Beams & Tie back
Rotating Head
Counterbalance
Cylinders
Shot-Pin
Rotating Cylinder Rotating Link
Head Motor Adaptor Lift
Counterbalance
Manifold Lube Oil
Distribution
Accumulator
Motor
System
M Sump
IBOP
10hp AC Reservoir
Motor
Hydraulic System Maintenance
Daily Inspections
Description
Check Condition of the Hydraulic Filter Indicator
Description Frequency
Replace Hydraulic System Filter Once Every 3 Months
Viscosity Index 32 46
Hydraulic System Maintenance
Adding & Draining
Hydraulic Oil Filter Sight Glass
Pop-Up
Dirt Alarm
Cork Ball
Hydraulic Pump
Dust Plug
Female
Quick-Connect Pump Inlet
Drain Adaptor
Hydraulic
Lubrication Kit
Hydraulic System Maintenance
Heat Exchanger
Blower &
Brake Covers
Oil Heat
Oil Heat Exchanger Exchanger
Monthly
Inspect
Counterbalance
Accumulator
Upper BOP
Time Delay
Accumulator
System
Accumulator
Unloading Valve not working Test & adjust UV1 (or replace)
Hydraulic System
Overheating
Pressure has bled down due to counter-
Check System Pressure
balance mode valve in shut-down too long
Reservoir Reservoir
Breather Cover
Reservoir
Bladder
Gasket
Reservoir Bladder
Annually
Inspect
Hydraulic Oil
Reservoir
Hydraulics Troubleshooting
Gearbox Lubrication System (contd)
Restricted Oil
Foreign particles blocking orifice/ nozzle Clean orifice/nozzle
Flow
Hydraulics Troubleshooting
Gearbox Lubrication System
Problem Probable Causes Remedy
Oil Leaking From
Worn oil seals Replace seals
Lower Seal
Broken lube pump adaptor plate spline Replace adaptor plate spline
Hydraulic System Maintenance
1. Jog-start the electric motor to make sure the direction of rotation is correct (clockwise when
looking into pump shaft/ electric motor fan). Correct as required.
2. Start the electric motor and allow both hydraulic pumps to circulate oil. Listen for unusual noises that would
indicate cavitation; check for leaks.
3. Locate the tube connecting manifold port PF to the lubrication motor. Disconnect the tube at the manifold end,
cap the tube and plug the PF port using steel fittings. 8
4. Set the relief valve RV1 for the variable displacement pump to a minimum setting, fully counterclockwise,
which allows the hydraulic system to operate without building up pressure.
5. Set the relief valve RV2 to minimum pressure, fully counterclockwise.
i Make sure the variable displacement pump case is filled with clean hydraulic oil.
6. Connect a gauge to test point PF. Increase the pressure by adjusting relief valve RV2 clockwise until the
pressure increases to 400 psi at test point PF. Set the jam nut on RV2.
A steel cap is installed over the adjustment screw to discourage unauthorized adjustment.
i While adjusting valves, verify a linear relationship between turning the adjustment screw and observing the
pressure change.
7. Turn off the electric motor. Reconnect the tube between manifold port PF and the lubrication motor.
8. Connect an ammeter to the electric motor. Note the full-load amps on the motor nameplate.
9. Restart the hydraulic system electric motor.
Pressure Switch
Set @ 18 psi
Spay Nozzles
Lube Pump
Lube Filter
Heat Exchanger
Hydraulic Motor
Test port PF
Manifold
Side View
B1
Manifold
Bottom View
Hydraulic System Maintenance
Setting up the Circuits
Pump/Motor
Guide Beam
Pump Pressure
Compensator
Manifold
Side View
Manifold
Bottom View
PF
Hydraulics Troubleshooting
Pumps
Hydraulic System Maintenance
Setting up the Variable Pump
Hydraulic System Maintenance
Setting up the Circuits
3000 Reading @ PV
Reading @ SA
2000
Pressure (psi)
1700
1000
800
150
0 10 20 30 40 50 60
2000PSI 2000PSI
2000PSI
20 Seconds
20 Seconds
100 PSI
0 PSI 100 PSI
Hydraulic System Maintenance
2000
Pressure (psi)
1700
20 Seconds 20 Seconds
1000
800
150
0 10 20 30 40 50 60
Manifold
Side View
CB
Manifold Manifold
Bottom View End View
Counterbalance System
CV3
.055 ORIFICE
TEST PORT
PCC
COUNTERBALANCE
CYLINDERS
ACCUMULATOR
PRECHARGE 900 PSI
CV3
MODE VALVE
PCC
Hydraulic System Maintenance
Setting up the
Counterbalance
CV3
.055 ORIFICE
TEST PORT
PCC
Hydraulics Troubleshooting
Counterbalance & Stand-Jump
Problem Probable Causes Remedy
B5
C5
A5
Link Adaptor
Rotation Gear
Shot Pin
Hydraulics Troubleshooting
Shot-Pin & Clamp Cylinder
Hydraulic System Maintenance
Setting up the Circuits
Hydraulic
Motor
SV5
C5
Link Adaptor
Rotation Gear
Shot Pin
Hydraulics Troubleshooting
Link Tilt Cylinders
Problem Probable Causes Remedy
Elevator Does Not
Reach Mousehole Link clamp incorrectly adjusted Check & readjust
or Derrickman
Load holding relief valves are stuck open, Replace or adjust the load
contaminated or need adjustment holding relief valve
Link Tilt Does Solenoid Valve is not shifting Check electrical continuity
Not Tilt
Links Do Not
Load holding valves need adjustment Adjust all (4) valves to 1,500psi
Move Together
Hydraulics Troubleshooting
Link Tilt Cylinders
Hydraulics Troubleshooting
Rotating Link Adaptor
Problem Probable Causes Remedy
Direct control valve or relief valve is Inspect, repair or replace the
sticking valve
Directional valve does not shift Test pressure left and right
Replace valve if necessary
Valve sticking or relief valve needs Test pressures & inspect valves
adjustment Adjust relief valves as required
Tool Does Not
Broken sensor Replace sensor
Return to Home
Faulty control system Check control system
Links Not
Counterbalance valves need adjustment Adjust valves
Syncronized
Hydraulics Troubleshooting
Rotating Link Adaptor
Hydraulics Troubleshooting
IBOP Actuator
Hydraulic System Maintenance
IBOP and Oil Pressure Switch
Hoses
Hoses
Annually
Inspect
Oil Pressure
IBOP Pressure Switch
Switch Configuration
Configuration
Wires
Pressure
Annually
Adjusting Screw
Inspect
Wires
.055”
PC4
500psi
Hydraulics Troubleshooting
IBOP Actuator
Rotating Head
Port B4
.055”
Hydraulics Troubleshooting
IBOP Actuator
Rotating Head
Port A4
.055”
PC4
.010”
500psi
Motor Housing
& Transmission
Motor Housing & Transmission
Internal Lubrication Flow
Pipe Plugs
Gear Drain
Monthly
Inspect
Pipe Plugs
Monthly
Inspect
Spillway
Monthly
Inspect
Motor Housing & Transmission
Adjusting the Encoder(s)
Sled Hold-Down
Screws (4)
Belt Tension
Spring
Electrical
Connector
Sled
Gear Housing
Body Seal
Gear Set
Roller
Bearings (4)
Pump
Adaptor Plate
CapScrew (10)
Main Body
Hydraulic Motor
O-Ring
Motor Housing & Transmission
Inspecting Gear Backlash
Gear Backlash
6 Monthly
Inspect
Solid
Wire Solder
A B
Bail
Annually
Inspect
Bushings (2)
Annually
Component Minimum Dimension
Inspect
Bushing ID < 4.45”
Bail Pin ID < 4.125”
Main Body Cover
5 Yearly
MPI
Main Body
5 Yearly
MPI
Bail Pin
Annually
Inspect
Motor Housing & Transmission
Inspecting S-Pipe Wing Nut
Seal Ring
Plug
S-Pipe
Monthly
Inspect
S-Pipe
Monthly
Pressure Test
Clamp
Bolts
Seal Ring
Wing Nut
Motor Housing & Transmission
Inspecting Main Shaft Liner
Wash Pipe
Assembly
Polypack Seal
Main Shaft
Motor Housing & Transmission
Inspecting Wash Pipe Assembly LEFT HAND THREADS!
Packing Box
Dowel Pin
3” Bore
Wash Pipe Wrench
Motor Housing & Transmission
Inspecting Wash Pipe Assembly
Wash Pipe
O-Ring Daily
Snap Ring Inspect
Holding Ring
Middle Spacer
O-Ring
Socket Head Screw
Motor Housing & Transmission
Inspecting Upper Bonnet Seals Cap Screw (6)
Bearing Shield
Retainer O-Ring
Annually
Inspect
Bearing Isolator
Annually
Lube
Tube Inspect
Oil Seal
Annually
Inspect
Shims
Motor Housing & Transmission
Inspecting Main Shaft
Radial Grooves
Stem
5 Yearly
MPI
<0.65”
Radial Grooves
<0.62”
Annually
Inspect
Retainer Ring
Motor Housing & Transmission
Inspecting Main Shaft End-Play
Main Shaft
Annually Dial Indicator
Inspect
Cap
Screws (6)
Bolts (4)
Motor Fan
Bolts (6)
Caliper
Mounting Bolts (2)
Steel Plate
Brake Pads
Caliper
Mounting Bracket
Motor Housing & Transmission
Inspecting Drilling Motors
Motor Cables
Weekly
Inspect
Louvers
Weekly
Inspect
Screens
Weekly
Inspect
Motor Housing & Transmission
Transmission Assembly/Disassembly
Stem Sleeve
Main Body Cover
Cap Screw Taper Roller Bearing
Upper Spray Nozzles
Dowel Pin
Upper Compound Roller Bearing Lock Washer
Internal Retaining Ring Bull Gear
Main Body
Tapered Roller
Thrust Bearing
Action Frequency
Replace Gearbox Oil Following Initial Break-In Following 1st Month of Operation
Cork Ball
YEARLY
Action Frequency
Perform Hydraulic System Analysis Every 6 Months
Cork Ball
Hydraulic Oil Fill
Male
Quick-Connect
Dust Plug
Hydraulic
Female Oil Drain
Quick-Connect
Hydraulic
Lubrication Kit
Lubrication Schedule
Motors
Grease
Fitting (1/8”)
Pipe Plug
(1/8”)
Grease
Fittings
Lubrication Schedule
General Lubrication
Stabilizer Bushing
Clamp Cylinder Gate
Rollers
Lubrication Schedule
General Lubrication
Wireline Adaptor
Guide Beams
& Carriage
Guide Beams & Carriage
Inspecting the Crown Padeye & Hang-Off Link Shackle
Crown Padeye
Annually
MPI
Crown Padeye
Monthly 2.0”
(50mm) min
Visual
Cotter Pin
Monthly Hang-Off Link Bores
Visual
1.5”
Shackle (15mm) min
Monthly
Inspect
Bolt Assembly
1.5”
(15mm) min
Safety Pin
Monthly
Inspect
Guide Beams & Carriage
Inspecting the Guide Beam Joints
Lynch Pin
Lynch Pin
Daily
Inspect
Beam Joints
Weekly
Inspect
Beam Joints
Annually
MPI
Retainer Pin
Daily
Beam Joints
Inspect
Monthly
Inspect
Guide Beams & Carriage
Inspecting the Main Tie-Back Guide Beam
All Welds All Welds Bottom Section
Annually Weekly
Alignment
MPI Inspect
Daily
Inspect
Tie-Back Plate
Main
Spreader Beam
All Bolts
Weekly
Inspect
Tie-Back Link
Bolted Connections
Auxiliary
Spreader Beam
Mast Leg
Guide Beams & Carriage
Inspecting the Intermediate Restraints
Alignment
Daily
Inspect
Studs/Nuts
Weekly
Inspect
Pin/Cotter Pin
Weekly
Inspect
Guide Beam
Guide Beams & Carriage
Inspecting the Carriage
Rollers
Weekly
Inspect
Detent Pins
Daily
Inspect
PH-50 Pipehandler
PH-50 Pipe Handler
Inspecting Elevator Links Recess in
Motor Guard
Rear
LIFT &
2 REMOVE
Link Tilt
Upper
Catch Link
Front
Catch Link Pin Link
26” (635mm)
Typical
Clevis
Pin
1
ROTATE
Link Clamps
Weekly
Inspect
Link Eyes
Varco
Monthly
Driller’s Console Inspect
PH-50 Pipe Handler
Inspecting Elevator Links
C
Upper Eye Lower Eye Capacity C Upper Eye
(Hook)
Dimension (C) Dimension (A) per Set (Tons)
B = 3½” (350 Ton)
5” 2 3 /4 ” 350
4 13/
16” 2 9/16” 300
4 5 /8 ” 2 3 /8 ” 225
5 1 /2 ” 3” 325
5 1 /4 ” 2 3 /4 ” 250
A
B = 6¼” (750 Ton)
7 1 /2 ” ? ?
7 1 /4 ” ? ?
7” ? ? Lower Eye
(Elevator)
6 3 /4 ” ? ? A
PH-50 Pipe Handler
Inspecting Link-Tilt
Cylinders
Monthly
Inspect
Pins
Bushings
Monthly
Monthly
Inspect
Inspect
Bushings
Monthly
Inspect
PH-50 Pipe Handler
Inspecting Link-Tilt
Hydraulic
Manifold
Rig-Up/Run/
Shutdown Valve
Torque
Arrestor
Spring
Spring
Spacer
Spring
Shims
End Cap
Clamp
Cylinder Body
PH-50 Pipe Handler
Torque Wrench Assembly
Manifold
Rear
Stabilizer Front
Stabilizer
Tong Dies
Wear Bushing
Rear/Front
Stabbing Guides
Stabilizer
Tugger Liner
Stabilizers (F/R)
Weekly
Inspect
Stabbing Guide
Weekly
Tong Dies Inspect
Daily
Inspect
Flippers
Clamp
Cylinder Gate Weekly
(shown open)
Swing Clear
Inspect
PH-50 Pipe Handler
Inspecting the Torque Wrench Assembly
Stabilizer Springs
Monthly
Inspect
Stabilizer
Springs
Cotter Pin
PH-50 Pipe Handler
Inspecting the IBOP Actuator
Actuator Cylinder
Weekly
Inspect
Hoses
Daily
Inspect
1.4”
1.4”
1”
1”
Inspect
1.4”
PH-50 Pipe Handler
Inspecting the IBOP Valves & Saver Sub Part Replace When
Threads have been
Saver Sub recut to minimum
Upper & Lower IBOPs shoulder-to-shoulder
5 Yearly length of 5”
MPI
IBOP Crank
Weekly
Inspect
Dowel Pin
Dual Port
Rod Seal Manifold
Assembly
Shot Pin
Rod Seal
Assembly
Shot Pin
Sleeve
Hydraulic
O-Ring Motor
Shot Pin
Bushing
Shot Pin
Cap Pinion
Gear
Part Replace When
Shot Pin OD < 1.375” Shot Pin
Cover
Shot Pin Sleeve ID > 1.510”
Shot Pin Bushing ID > 1.475”
PH-50 Pipe Handler
Rotating Link Adaptor
Rotary GLYD Ring
Annually
Rotary Link Replace
Adaptor
O-Ring
Annually
Replace
Retainer Thrust Ring
Ring
Annually
O-Ring Replace
Rotating Link
Piston Ring
Adaptor Gear Annually
Inspect
Stem O-Ring
Annually
Index Mark
Replace
LEVEL WORKING SURFACE
PH-50 Pipe Handler
Wireline Adaptor
Sheaves
Each Use
Inspect
Drawings
Hydraulic Manifold
Hydraulic Manifold
Hydraulic Manifold
Hydraulic Manifold
Hydraulic Manifold
Counterbalance Rig-Up
Counterbalance Run
Counterbalance Shut-Down
Brakes On
Rotate Left
Rotate Right
Shot-Pin
IBOP Open
IBOP Closed
Torque Wrench On
Torque Wrench Off
Lube Oil System
Pump System
Pump Rig-Up
Stand-Jump Position
Float Position
Mousehole
Drill-Down
The Bail Lock Assembly
must be installed
Tube (P/N 113498)
U-Bolt (P/N 113497)
2x 3/4" nuts
1 2
Safety Wiring
3 4 5
Hydraulics Troubleshooting
IBOP Actuator
.055”
Rotating Head
Port A4
.055”
PC4
500psi
Hydraulics Troubleshooting
Gearbox Lubrication System