Lecture-3 Pakistan Power Sector: Back-Ground, Present Situation & Future Plans
Lecture-3 Pakistan Power Sector: Back-Ground, Present Situation & Future Plans
3
POWER SECTOR - BACKGROUND
4
POWER SECTOR - BACKGROUND
1. The GoP approved Pakistan Power Sector Strategic Plan for
restructuring and reform in 1992.
2. PEPCO was established in 1998 as an independent entity with mandate
to split Power wing of WAPDA into various entities and then corporatize
& commercialize the restructured entities.
3. PEPCO initiated the restructuring and reform process in 1998. The
reform process was considerably slowed down beyond 2001 when
PEPCO was reduced to a Division in WAPDA.
4. The GoP reactivated the mandate of PEPCO in October 2007 to bridge
the increasing demand supply gap and to reduce the resulting load
shedding in the country
5. By the end of 2011, everybody was fed up with PEPCO, and now the
restructured entities are being managed by the Ministry of Water &
Power directly.
5
PEPCO SYSTEM
6
Consumers vs Consumption Pattern
No. of Consumers Consumption
Consumers (As on 30th Jun 2013) (Jul 2012 - Jun 2013)
Category Billion
Nos. % age % age
units
Domestic 18,713,537 85.55% 33.258 51.18
Commercial 2,550,808 11.66% 4.657 7.17
Industrial 296,849 1.36% 19.172 29.5
Agricultural 301,115 1.38% 7.548 11.61
Others 13,291 0.06% 0.351 0.54
Total 21,875,600 100.00% 64.986 100.00%
7
Consumption Pattern Jul-2012 - Jun 2013
Others
Agricultural 0.54%
11.61%
Industrial Domestic
29.50% 51.18%
Commercial
7.17%
8
GENERATION SOURCES
June 2013
1. HYDRO
• WAPDA 6733
• IPPS 195
• Sub Total 6928
2. THERMAL
• EX. WAPDA GENCOs 4785
• IPPs 8359
• NUCLEAR 650
• Sub-Total 13794
• GRAND TOTAL 20,722
9
Generation Sources (MW) June 2013
Thermal Nuclear,
650, 3.14%
Hydro WAPDA,
6733, 32.49%
Thermal IPPs,
8359, 40.34%
Thermal
Ex.WAPDA
GENCOs, 4785,
23.09%
Hydro IPPs, 195,
0.94%
10
EXISTING GENERATING CAPABILITY (June, 2013)
Availability (MW)
Nameplate/
Dependable
Type of Installed
Capacity
Generation Capacity
(MW) Summer Winter
(MW)
2000- 01 30 % 70 %
2006- 07 36 % 64 %
12
Reasons For Price Hike Of Cost Of Electricity
25000
20000
Capability
Forecast
Capability (MW)
15000
10000
5000
0
1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10
Years 15
Country wide Load Forecast of XWAPDA DISCOs’ & KESC (MW)
19
Comprehensiveness Of Transmission
Expansion Plan
20
Finances Required
21
Situation after June, 2013
• The Nawaz government had some aggressive
plans to install coal fired plants at
– Gadani Power Park and
– Bin Qasim Karachi
• to bridge the gap in supply and demand by the
year 2017.
• The success (…?...) in implementation of the
plans, however depends on how much
conducive environment is created for foreign
investment. 22