This document provides instructions for creating daily reports in the OpenWells software. It describes how to fill out various tabs in the report, including the general, time summary, activity details, and cost tabs. It emphasizes filling all required fields and provides examples of how to track costs for helicopter flights between wells. The document stresses the importance of accurately copying information from daily reports and whiteboards to capture all testing activities from the previous day.

Uploaded by

Oleg Malkov
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
345 views16 pages

Openwells Guid

This document provides instructions for creating daily reports in the OpenWells software. It describes how to fill out various tabs in the report, including the general, time summary, activity details, and cost tabs. It emphasizes filling all required fields and provides examples of how to track costs for helicopter flights between wells. The document stresses the importance of accurately copying information from daily reports and whiteboards to capture all testing activities from the previous day.

Uploaded by

Oleg Malkov
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 16

Login to OpenWells

User: SE48615D Expand well tree and In well


Password: pabl2116 tree we are working in CPO,
WELL TESTING event

OpenWells main tab


Create Daily report
1. Press Create
Daily Report
2. In the appeared
tab press Next
Create Daily report
1. Type report
description in the
appeared tab
2. Press Next
Repsol Daily Completion Tab
1. Areas in red
required to work
with
General tab data
1. Weather to be taken from black console. While looking to lap top turn your head on 35 deg
to the left side and 25 deg upward. On the wall you will see black box with all weather data

2. Usually report creates on the day before submition. Latest data is not available. Latest data
comes next day at 07:30 in the morning. Report will no be saved with blank green areas. Put
any words to be able to save report.
Time summary tab data
Time summary tab required to fill areas in red. 24hr summary box is automatically copy the
data from general tab.
Activity details data

Is offline operation? – No (Offline operations apply if in simops not the main activity performs)
Main or Aux Derric? – MWC (AUX derric for dual activity rigs)
From – 00:00
To – 00:00
Duration is calculating automaticaly
MD from – 0
MD to – (3208m-10R), (2423m-32P), (2280m-31P), (1189m-Gabi3)
Time class – P – planned (Usual time class. If any operation on site, time class will be changed)
Phase – 33 Production test
Activity – 24 Production test
Operation code – 16A FlOW WELL (for Gabi3 - 23WI FLOWCHECK, SHUT IN AND MONITORING)
Operation description you can copy from 24hr summary
Cost tab
Cost tab requires high attention. Do not touch inside until you will have any ongoing
operations or helicopter flights.
Cost tab
In case of Helicopter flight do following actions (example 14.07.2018):
1. Obtain from Logistics flight fee. For 14.07.2018 the price is 126619.50 RUR.
2. USD to be entered into the system
3. 126619.50/63 = 2009.83 USD.
4. 2009.83 USD must be sheared between 31P-40%, 32P-40% and 10R – 20%
5. 31-P = 803.93 USD
6. 32-P = 803.93 USD
7. 10R = 401.97 USD
8. Change items cost to 402 USD (10R Report case)
9. Change Qty from 0 to 1
10. Check total daily rate. It must change
11. IN THE NEXT DAY REPORT DO NOT FORGET TO CHANGE Qty FROM 1 to 0.

Before After

Save Report
Fill up all information from SLB daily report for 31-P, 32-P, 10-R, Gabi-3

All daily reports Current: All is what required


automatically drops Information at 06:00 to be entered in
to individual folders of present day Word file
in the outlook. 24 summary:
Gabi-3 information Information from
reflects on the white 01:00 to 00:00 of the
board previous day
Fill up all information from SLB daily report for 31-P, 32-P, 10-R, Gabi-3 to general tab

Word file what was prepared


by you before from SLB
reports

OPENWELL GENERAL TAB


Time summary tab
Copy 24 hr summary to operation description
Keep in mind in case of additional operations on the well site, you will have to split timeframe
from the time, when operation started, and time, when operation complete. Depending on
operation activity details will be changed accordantly. In this case 24hr Summary will be built
from Operation description
NPT
If NPT happened you will have to add time when it has happened and describe in NPT fail
properties and Lessons Learned
NPT
To describe NPT click on:

All subtabs MUST be filled out as if you will rise the LL half information will be pulled from
NPT/Equipment fail properties.
NPT associated to LL
To describe LL click on:

All subtabs MUST be filled out.


Mostly, LL is not relevant to NPT. In this case select NO in NPT related box.
Close OPENWELLS and synchronize

Go to EDM AutoSync Client. User: AutoSync Password: Landmark1. When section complete go out
from EDM