0% found this document useful (0 votes)
77 views3 pages

PTK 033 Pis. Revisi

This document provides guidelines for Project Control, Performance & Risk Management as part of Pertamina's Upstream Project Development procedures. It outlines Pertamina's Project Control, Performance & Risk Management guidelines for placing projects into service as part of their overall Upstream Development Way methodology. The guidelines were last updated in October 2014 and are contained in Appendix A of Pertamina's Upstream Project Development manual.

Uploaded by

mohammad basuki
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
77 views3 pages

PTK 033 Pis. Revisi

This document provides guidelines for Project Control, Performance & Risk Management as part of Pertamina's Upstream Project Development procedures. It outlines Pertamina's Project Control, Performance & Risk Management guidelines for placing projects into service as part of their overall Upstream Development Way methodology. The guidelines were last updated in October 2014 and are contained in Appendix A of Pertamina's Upstream Project Development manual.

Uploaded by

mohammad basuki
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 3

PT PERTAMINA PERSERO

KANTOR PUSAT
Jalan Medan Merdeka Timur 1A
Fax : (62-21) 363 3685, 384 3882
Telp. : (62-21) 381 5111, 381 6111
Buku Pedoman 1
Upstream Project Development (UPD)

BUKU LAMPIRAN A
Project Control, Performance & Risk Management

Versi 1.0
Oktober 2014

Pedoman Tata Kerja Place Into Services


(PIS)
Pedoman Tata Kerja Place Into Services (PIS)

Versi 1.0
Pertamina Upstream Development Way (PUDW)

Oktober 2014

You might also like