0% found this document useful (0 votes)
152 views12 pages

Company Profile Power Point

- Administration - Accounting - Purchasing - Safety Officer - Quality Control - Warehouse - Driver - etc Project Staff: - Foreman - Supervisor - Operator - Helper - etc Total Employees: 30 Permanent + 150 Non Permanent Figure 13. Organization Structure 11

Uploaded by

Azzus Bkha
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
152 views12 pages

Company Profile Power Point

- Administration - Accounting - Purchasing - Safety Officer - Quality Control - Warehouse - Driver - etc Project Staff: - Foreman - Supervisor - Operator - Helper - etc Total Employees: 30 Permanent + 150 Non Permanent Figure 13. Organization Structure 11

Uploaded by

Azzus Bkha
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 12

COMPANY PROFILE

PT. CITRA WAHYU DIATAMA


ENGINEERING AND CONSTRUCTION

“ Committed to High Quality


Performance as a Responsive
And Reliable Partner to
Our Clients “

Jl. Raya Kelapa Sawit BD 12 No. 30


Gading Serpong, Tangerang 15810
Phone : 021-5467974
Fax : 021-5467974
Email : [email protected]
1
CONTENT

Company Identity

Our Vision

Our Mission

Company Data

Organization Structure

Scope of Work

Customer Plant

Work Experiences

2
COMPANY IDENTITY

PT. Citra Wahyu Diatama established in 2004 and


started a small engineering contractor company. This
start-up company had only 10 employees with simple
project in our first customer Teijin Fiber Corporation
(TIFICO). While the industrial prosperity keep growing and
many industrial company had policy about outsourcing
program, we decided to take larger scope of work and we
hired a lot of manpower to succeed our project is strictly
following proper recruitment qualification in order to
achieve good workmanship.
We provide complete scope of maintenance and
electrical work. For example piping work from cast iron to
stainless steel, install and assembling of all machineries
and equipment, insulation services for piping, tanks tower
and related equipment based on wide range of
experience and knowledge of hot and cool insulation,
refractory, painting, coating and ducting and we provide
outsourcing employees for daily maintenance or
manpower for production department and other
maintenance works. We provide whole services with
quality satisfaction.
With the previous experience as engineering and
construction company in the Polyester plant, we also
concerned in maintenance service. We provide an
integrated plant maintenance services in the field of
engineering project management and utilizing qualified
manpower and tools.
We have completed many project of Polyester
plants, shoes industry, tyre industry, textile, automotive,
Ceramics and other industries. Among our client are major
company in Indonesia, for example Bridgestone, IRC,
Pratama (NIKE), Teijin Fiber Corporation (Tifico), etc.
Services quality is our primary concern in all
project at our customer. It has been the basic of our
success and the reason that clients continually handling
us their project. And for the safety, we always care about
that, we provide safety program for each project to
minimize site accident.

3
VISION AND MISSION

OUR VISION
” To be a big contractor
company in Indonesia
with good quality result
and on time scheduling
as a measurement of
customer satisfaction ”

OUR MISSION
” Always try continually
improve our services in
order to fulfill the
customer’s requirements
and ensure our client
satisfaction by providing
high quality services at
proportional cost ”

4
COMPANY DATA

COMPANY NAME : PT. CITRA WAHYU DIATAMA

OFFICE : Jl. Raya Kelapa Sawit Blok BD 12 No. 30


Gading Serpong, Tangerang - 15810
Phone : 62-21-5467974 / 70927974
Fax : 62-21-5467974
Email : [email protected]

DATE OF ESTABLISHMENT : 17 SEPTEMBER 2004

BANK : BCA - Cikokol Branch

TAX REGISTRATION / NPWP : 02.423.665.5-411.000

OPERATION LICENSE / SIUP : 503.1/0548/30-03/PK/XI/2004

LINE OF BUSINESS : ENGINEERING AND CONSTRUCTION

EMPLOYEES : 30 Permanent Employees


150 Non Permanent Employees

5
SERVICES
Maintenance
We can provide supplemental maintenance to the customers for existing
program or we can provide the total maintenance program. The following are
some of the services, we are capable providing :
• Preventive, Shutdown and Resident Maintenance Program
• Maintenance Outsourcing or Third Party Maintenance
• Install, assembling and repair of machinery and equipment (Static and
Rotary), There are Gear boxes, Cyclo, Beier, Centrifugal Pump, Non seal
Pump, Trochoid Pump, Mechanical seal etc.

Electric
The following are some of the services, we are capable providing :
• Wiring Cable
• Repair Electric Motor
• Installation Panel
• Etc

Insulation
We provide complete insulation services for piping, tanks, tower and related
equipment
based on the wide range of experience and knowledge of insulation.
The following services are :
• Hot Insulation, the material from Rockwool, Glasswool, Calsium Silicate,
Cement and Asbestos Cloth.
• Cold Insulation, the material from Polyurethane, Polysterene, Foam Glass
• Refractory, the from Castable Fire Brick
• Metal Jacketing, Alumunium Sheet, Galvanized Steel etc

Chemical Cleaning
We provide cleaning system with chemical, the following item are :
• AHU
• Heat Exchanger
• Cooling Tower
• Etc

Engineering Consultation
We can provide the system from conceptual studies to plant start up and
maintenance. The following engineering services are :
• Layout Drawing
• Equipment Drawing
• Installation Drawing
• Start Up and Commissioning
• Production Improvement
• Calibrations and Testing
• Etc 6
PROJECT EXPERIENCES

No Projects Name Customer PO Number Remarks

1 Overhoul Spinning Machine Spinning Dept. - TIFICO M1 - X4125 Sub-Contractor

2 Overhoul SF Line 1 – 4 SF Dept. - TIFICO M1 - Z5421 Sub-Contractor

3 Cleaning Cooling Tower 11 – 19 Polymer Dept. - TIFICO M1 - 16701 Main Contractor

4 Painting Creel Area – Balling DSF Dept. - TIFICO M1 - Z4608 Main Contractor

5 Pembongkaran & Pemasangan dari SF Dept. - TIFICO M1 - X4440 Main Contractor

  W.Y.P 1Fl ke Area BM # 4k      

6 Repair Butterfly Valve SF Dept. - TIFICO M1 - Z4505 Main Contractor

7 Pembuatan Box Penyimpanan Filter CP Dept. - TIFICO M1 - 15501 Main Contractor

8 Pemasangan Concent AC untuk ECR CP Elektrik Dept. – TIFICO EC 331 05 1 Main Contractor

9 Isolasi Pipa DM 2 - 3K Drawing Dept. - TIFICO M1 - Z4471 Main Contractor

10 Construction Recovery Drain Steam SF Dept. - TIFICO M1 - 16701 Main Contractor

Penggantian Roda Creel Stand TX-14 &


11 SDY Dept. - TIFICO M2 - 56728 Main Contractor
15

12 Penggantian Screen QS SM # 37 - 40 SDY Dept. - TIFICO M2 - 66616 Main Contractor

13 Renewal For NaOH Tangki Polymer Dept. - TIFICO M1 - 56103 Main Contractor

14 Honey Comb Pin JTC – 10 SDY Dept. - TIFICO M2 - 86612 Main Contractor

15 Cleaning Mesin Hot Press Press Dept - Pratama 0511-0163 Main Contractor

16 Insulation Piping Chiller Utility – Bridgestone Ind M604B - 0414 Main Contractor

Install Cover Insulation Dowtherm Boiler


17 Polymer Dept. - TIFICO M1 - 66108 Main Contractor
No.1

18 Filter Case Material Unit Double Electric Dept – IRC A0605615 (E) Main Contractor

19 Pekerjaan Ganti Type SF Dept. - TIFICO M1 - 35321 Main Contractor

20 Penyekat Gudang Oil MSF / MFY SF Dept. - TIFICO M1 - 76728 Main Contractor

21 Overhoul SM # 11 – 12 Filament Dept - TIFICO M2 - 96412 Main Contractor

Modifikasi Tray dibawah Mesin Crimper


22 Drawing Dept. - TIFICO M1 - 86437 Main Contractor
Line 3 A/B

23 Cleaning Polymer Filter CP Dept. - TIFICO M1 - 86527 Main Contractor

24 Modifikasi Pipa Finishing Oil SF Dept. - TIFICO M1 - 86739 Main Contractor

25 And Others
EXAMPLE WORKS AT PLANT

Figure 1. Over Haul at Drawing Machine Figure 2. Repair Gear Pump at Spinning Area

Figure 3. Insulation Work at Polimer Area Figure 4. Maintenance Daily at TIFICO

8
OUR ACTIVITIES

Figure 5. Daily Meeting Figure 6. Design Process

Figure 7. Estimating at Plant Figure 8. Welding at Workshop

9
OUR ACTIVITIES

Figure 9. Administration Support Figure 10. Insulation Works

Figure 11. Safety Officer Figure 12. Piping Works

10
ORGANIZATION STRUCTURE

DIRECTOR
( Indra Wahyudi)

MARKETING MANAGER PROJECT MANAGER FIN & ACC MANAGER


( Indra Wahyudi ) ( Ir Edy Rydjantoro ) ( Nurdiah Hendriyanti )

SALES ENGINEER ADMINISTRATION SPV ACCOUNTING SPV

CIVIL SPV
PURCHASING SPV

MECHANICAL SPV

ELECTRICAL SPV

INSULATION SPV

11
12

You might also like