Cluster Report Preparation Flowchart
Cluster Report Preparation Flowchart
FLOW CHART
Processing/Verificat Drive Test
Pre-check Initial Drive Test Collection of Logs ion Of Logs Analysis
No
Post Drive Verify Patch All KPI
Change Optimization
Analysis
Test Drive Log ok?
Implementation
Yes
Yes
If Any
Issue
persist
No
Preparation of
Report
Submit
Report
Pre check
DT scenarios according to the customer proposal, like Short call, Long call, Data
etc..
Routes
Cluster Boundary
Drive test Analysis
If any above issues found ,patch area logs will send to DT engineer for drive again after
Optimization
Optimization
Azimuth
Neighbors relation & Neighbor
Audit, for DCR & HOSR ,Tuning
the Timers & counter
Electrical/Mechanical tilt
values(differ from each
operator)
Antenna Height
According to the patch area we will first prefer to suggest physical optimization to DT
ENGINEERS.
It is not improved then we will go for parameter optimization
Done by DT engineer(Proper approval need to taken from the site
Change Technician) .
Implementation After reaching the site ,DT engineer will do optimization as
suggested by the RNO’S based on the patch area
If any KPI not met the threshold need to give the proper justification
Post Drive
with Snaps or again go for further optimization
Prepare the report
Preparation of as per the
Submit the Report
Report customer report
format.