• Contributes around 22% of the world electricity supply generated.
• Maximum benefits in minimum time.
• Offers the most fastest economical means to enhance power supply, improve
living standards, stimulate industrial growth and enhance agriculture with the least
environmental impact and without heavy transmission losses .
• less transmission losses
• The first hydroelectric power dam in the world was built in Appleton, Wisconsin
in 1882.
3/11/2019 2
Adigrat University
Electrical and Computer Engineering
3/11/2019
Flow chart for Hydropower Development
By Kibrom
Gebregergs
Hydropower plant (HPP) Development
Gebregergs
By Kibrom
• Identification of potential site(s)
• Funding of project development
• Development of rough technical concept
• Negative impact on the natural resource
3/11/2019 4
Hydropower Development
2. PRE-FEASIBILITY STUDY
• Assessment of different technical options
Electrical and Computer Engineering
• Approximate cost/benefits
• Permitting needs
Adigrat University
Gebregergs
By Kibrom
• Market assessment
3. FEASIBILITY STUDY
• Technical and financial evaluation of preferred option
• Assessment of financing options
• Initiation of permitting process
3/11/2019 5
Hydropower Development
4. FINANCING/CONTRACTS
• Permitting and Contracting strategy
• Supplier selection and contract negotiation
Electrical and Computer Engineering
• Financing of project
5. DETAILED DESIGN
Adigrat University
Gebregergs
By Kibrom
• Preparation of detailed design for all relevant lots
• Preparation of project implementation schedule
• Finalization of permitting process
6. CONSTRUCTION
• Construction supervision
7. COMMISSIONING
• Performance testing and Preparation of as build design (if required)
3/11/2019 6
Hydropower Development Challenges
1. Enhancing the level of energy consumption,
particularly in less developed and developing countries, is a global challenge.
Electrical and Computer Engineering
Gebregergs
By Kibrom
• wide disparities between the standard of living and quality of life of
high energy consuming countries on the one hand and those who
Result
do not have the opportunities of adequate access to energy on the
other.
•.
Decision • development of different sources of energy and increase in its
Should be consumption has become a priority agenda of all the
taken developing countries.
3/11/2019 7
Hydropower Development Challenges
2. Various countries have adopted their own strategies to provide energy
to their people during last 30 years .
Electrical and Computer Engineering
Gebregergs
♪ Coal based generation increased from 38% to 39%
By Kibrom
♪ Gas increased substantially from 12% to 17.4%
♪ Nuclear rise from 3.3% to 16.9
NB. there fore Special efforts are required to develop Hydroelectric capacities
3/11/2019 8
Hydropower Development Challenges
3. Low Exploitation of Hydro Potential
Inspite of hydroelectric power requiring a clean energy generation process,
Electrical and Computer Engineering
Gebregergs
By Kibrom
COUNTRY POTENTIAL INSTALLED PERCENTAGE
3/11/2019 9
Hydropower Development Challenges
4. Declining proportion of Hydro Capacity
In the last 30 years, the proportion of hydroelectric capacity in the world power system has
Electrical and Computer Engineering
considerably reduced.
Reasons:-power supply industry has always experienced the situation of shortages both in energy
and peaking requirements.
Adigrat University
Gebregergs
By Kibrom
To tide (flow) over the shortage in shortest possible time, more dependence was placed on sources
of power generation with shorter gestation period
5. Thrust on Hydro Power
The thrust on hydroelectric development is based on the following considerations:
a) Hydroelectric involves a clean process of power generation.
b) Since it does not suffer from the limitation of inflation on account of fuel consumption, in the long
run, it is the most cost-effective option for power supply.
3/11/2019 10
Socio-economic and
Electrical and Computer Engineering
Gebregergs
By Kibrom
Hydropower Development
3/11/2019 11
Socio-economic and Environmental analysis with
Hydropower Development
1)Technical issues:
To expedite early execution of hydro projects, bankable Detailed Project Report
Electrical and Computer Engineering
Gebregergs
By Kibrom
Survey & investigation and analysis of geological, geomorphological, geo-
electrical, hydrological data etc. should be done at the time of preparation of a
DPR itself in order to minimize the impact of risks.
The quality of DPRs should be of high standard
At the same time, contract monitoring as distinct from project monitoring should
be emphasized and land acquisition and infrastructure development be settled and
completed before the start of the project.
3/11/2019 12
Socio-economic and Environmental analysis with
Hydropower Development
2) Infrastructural issues
Electrical and Computer Engineering
There is a need to setup single space clearance for hydro projects so that a project is
cleared without many hassles (difficulties).
Various authorities such as the Ministry of Finance, Ministry of Environment and
Adigrat University
Gebregergs
By Kibrom
Forests, etc. are involved in the appraisal of a hydro power project before it is
certified for development. So it will be desirable to have a single window
dispensation/authority .
The hydro projects which involve lesser risk element and entail lesser capital
investment can be considered for development in the Private Sector.
Public Sector can take up
(a) Multi purpose Projects
(b) Projects involving cooperation with neighboring countries
3/11/2019 13
Socio-economic and Environmental analysis with
Hydropower Development
3) Financial issues
• There is also a need to off-load indirect cost components on hydro project.
Electrical and Computer Engineering
• Many hydro projects are located in troubled areas and infested by militancy and
terrorist activities.
Adigrat University
Gebregergs
By Kibrom
• There is an urgent need to amend the present policy of the Government in regard
to charging the entire security expenditure from concept and until commissioning
on the project cost.
• The cost of access roads should not be included in the project cost, as
development of hydro projects triggers economic and commercial activities
around the project site and results in economic benefit to the State.
3/11/2019 14
Selection of Site for Hydro-Electric Power Plant
(Efficiency of hydropower)
• Availability of water. Since the primary requirement of a hydro-electric power
station is the availability of huge quantity of water, such plants should be built at a
Electrical and Computer Engineering
place (e.g., river, canal) where adequate water is available at a good head.
• Hilly Area Required:
Adigrat University
Gebregergs
By Kibrom
For storage of ample quantity of water, both side of dam hilly area or strong
mountains required for storage of water.
• Civil Work:
It should have strong foundation or the cost of foundation should be as low
as possible
• Large Catchment Area:
Large catchment area required, so that the water in it should never fall below
the minimum level
3/11/2019 15
Selection of Site for Hydro-Electric Power Plant
(Efficiency of hydropower)
• Transportation Facility:
For Workers & Civil Material required better transportation facility.
Electrical and Computer Engineering
Gebregergs
By Kibrom
near to load center.
• Availability of Material:
At the time of erecting the dam & power house a huge amount of civil
material is easily available without any shortage.
• Area free from earthquake:
Ample quantity of water storage in dam of hydro-electric power plant
because of earth quake chances to flood occurs; to avoid this area should be
free from earthquake
3/11/2019 16
Selection of Site for Hydro-Electric Power Plant
(Efficiency of hydropower)
• Accommodation Facility:
For operational & maintenance staff better facility of accommodation is
Electrical and Computer Engineering
Gebregergs
By Kibrom
available at a reasonable price. Further, the bearing capacity of the ground should
be adequate to withstand the weight of heavy equipment to be installed.
• Future Expansion:
For increasing per MW Capacity of plant the space is available for future
expansion.
3/11/2019 17
Typical negative environmental and social impact of Hydropower
Regardless of project size, the project owner is ultimately responsible for ensuring that all
environmental and social impacts are taken into account following best practices, domestic
regulatory requirements, and financing institution expectations.
Electrical and Computer Engineering
Gebregergs
By Kibrom
Major downriver hydrological changes can Managed water releases can mitigate these
destroy riparian ecosystems dependent on adverse impacts.
periodic natural flooding
Water-related Diseases
Some infectious diseases can spread Public health strategies should include
around hydroelectric reservoirs, preventive measures such as investing in
particularly in warm climates and densely public awareness campaigns and window
populated areas .Some diseases (such as screens, monitoring disease vectors and
malaria and schistosomiasis) outbreaks, controlling disease vectors, and
3/11/2019 treating cases. 18
Cont…
Fish and Other Aquatic Life
Hydroelectric projects often have major effects on fish Managed water releases may be needed for the survival of
Electrical and Computer Engineering
and other aquatic life .Reservoirs positively affect certain certain fish species in and below the reservoir .Fish passage
fish species (and fisheries) by increasing the area of facilities (fish ladders, elevators, or trap-and-truck
available aquatic habitat operations) aim to help migratory fish move upriver past a
Adigrat University
Gebregergs
By Kibrom
dam but are usually of limited effectiveness due to the
difficulty of ensuring safe downriver passage for many
adult fish and fry .
3/11/2019 19
Cont…
Loss of Cultural Property
Cultural property, including archaeological, Structures and objects of cultural interest
historical, paleontological, and religious sites should be salvaged wherever feasible through
Electrical and Computer Engineering
and objects, can be inundated by reservoirs scientific inventory, careful physical relocation,
or destroyed by associated quarries, borrow documentation and preservation in museums
Adigrat University
Gebregergs
pits, roads, or other works or other facilities .However, unique or sacred
By Kibrom
sites with religious or ceremonial significance
to indigenous or local people usually cannot be
replaced
Reservoir Sedimentation
Over time, reservoir sedimentation reduces Effectively implemented watershed
live storage and power generation to a degree management can minimize sedimentation and
that could also lower the projects’ long-term extend the reservoir’s useful physical life by
prospects for renewable energy over the long controlling road construction, mining,
term agriculture, and other land use in the upper
catchment area
3/11/2019 20
Cont…
Greenhouse Gases
Greenhouse gases (carbon dioxide and Greenhouse gas releases from reservoirs can be
Electrical and Computer Engineering
methane) are released into the atmosphere reduced with a thorough salvage of commercial
from reservoirs that flood forests and other timber and fuel wood .However, this rarely
Adigrat University
biomass, either slowly as flooded organic happens due to (a) high cost of extraction and
Gebregergs
By Kibrom
matter decomposes, or rapidly if the forest is transportation, (b) marketing constraints, or (c)
cut and burned before reservoir filling Political and economic pressures to avoid delays
.Greenhouse gases are widely considered to be in filling the reservoir.
the main cause of human-induced global
climate change.
Access Roads
New access roads to hydroelectric dams can Forests and other environmentally sensitive
induce major land use changes areas along the selected road corridor should
receive legal and physical protection .
3/11/2019 21
Cont….
Power Transmission Lines
Power transmission line right-of-ways can reduce Power lines should be sited to minimize concerns and
Electrical and Computer Engineering
and fragment forests; indirectly, they can increase built using good environmental practices .Where
deforestation by improving physical access .Power concentrations of vulnerable bird species exist, the top
lines are responsible for deaths of large birds; power (grounding) wire should be made more visible with
Adigrat University
Gebregergs
By Kibrom
lines are considered an aesthetic blight . plastic devices .Electrocution (mainly of large birds of
prey) can be avoided through bird-friendly tower
design and proper spacing of conducting wires .(Refer
to WBG EHS
Guidelines for Electric Power Transmission and
Distribution .)
3/11/2019 22
Advantages & Disadvantages of Hydro-Electric Power Plant
Power generation can be controlled quickly & rapidly without any difficult.
This plant is suitable for supplying power to variable load
Adigrat University
Gebregergs
By Kibrom
By controlling discharge of water precisely, constant speed & frequency can
be maintained.
The life of plant is longest.
Generation cost per unit (KWH) is lowest.
In addition to generation of electric energy H.P.P. is also useful for supply of
drinking water, supply of water for irrigation and control the flood
It does not require a long starting time like a steam power station
3/11/2019 23
Advantages & Disadvantages of Hydro-Electric Power Plant
Disadvantages:
High capital cost due to construction of dam.
Electrical and Computer Engineering
Gebregergs
By Kibrom
Firm power (Output) is totally depends on monsoon.
It takes long time for complete erecting of power plant.
It requires large area (catchment) area for storage of water.
As sites are away from load center, so cost of transmission and losses in it
are more.
There is limitation to select the site of HPP because of their requirements.
3/11/2019 24
The Significance of Hydropower in the Socio-Economic
Development of Ethiopia
• There is a strong connection between the energy sector and a national economy.
On the one hand, energy demand, supply and pricing have significant impact on
Electrical and Computer Engineering
Gebregergs
By Kibrom
between economic growth and energy demand of life of the population.
• An average world GDP for the period 1971-1980 was estimated to be 20 Trillion
USD while the value increased and doubled to 40 Trillion by 1991-2000.
• Ethiopia has considerable energy resources that need to be exploited to accelerate
its socio-economic development.
• developing countries’ average figure for Electric Power (kW installed capacity per
1000 persons) is 272, Ethiopia achieved only 8 kW.
3/11/2019 25
Adigrat University
Electrical and Computer Engineering
3/11/2019
26
By Kibrom
Gebregergs
Cont….
• A study by Ethio Resource Group with Partners (2007) shows that with only 6%
of house holds connected and 15% of the population having access to electricity
Electrical and Computer Engineering
Gebregergs
By Kibrom
• What has been developed so far amounts is about 4000MW or only 12 to 24% of
the total potential
• Energy consumption in Ethiopia is low in per capita terms, and its structure is
underdeveloped
3/11/2019 27
Adigrat University
Electrical and Computer Engineering
3/11/2019
Thank you
28
By Kibrom
Gebregergs