Highway Project
Highway Project
1
2
Survey Locations at Kaiwara
3
H N
C
O
Highway Project Includes
4
State Highways(SH)
Village Roads(VR)
Classification of Urban Roads
8
Sub-arterial Roads
Local Streets
Highway Alignment
9
Vertical Alignment
Easy
Safe and
Economic
Highway Alignment
10
Traffic
Geometric design
Economics
Other Considerations
Reconnaissance
Selection of good alignment for the highway
Alignment can be
Collection of data
FIELD STUDIES
SOIL STUDIES
Construction of embankments/cuts
Office Work
14
PREPARATION OF DRAWINGS
Index Map
B
Preparation of plan of alignment
18
Tracing of Hill Alignment
19
Cross sections
20
Block levels for CD work
21
22
A
Cross section in hill road
23
Cross Section in Cutting
24
Cross Section in Embankment
25
Highway Design
26
Fixingdesign gradients
Design of vertical curves (summit & valley)
Design of CD works
Office work at the camp
29
(one set for the entire batch)
Centre line plan of the alignment using Total
Station Data
v2
Ruling minimum radius, R
( emax 0.07 and f max 0.15 ) e f g
v2
Super-elevation, e f
2 gR
Extra –width = nl 2 V
we
2 R 9.5 R
Design Calculations
35
ii) Ls eN (W We ) or eN (W We )
Ls
2
Set-back distance = m R ( R d ) cos
2
S L
or m R ( R d ) cos c
sin
2 2 2
Sight distance:
v2
SSD= vt
2 gf
NS 2 9.6
L (if L>S); L 2S if (L<S)
9.6 N
Vertical alignment Design
40
i) L 2 Nv
( for comfort condition)
3 2
C
NS 2
ii) L (for Head light sight
1.5 0.035S
distance, if L>HLSD)
1.5 0.035S
iii) L 2S N
(for L<HLSD)
Pavement Design
41
Traffic volume
assumed as per IRC guidelines
Velocity of flow,
2 1
1
v R S 3 2
n
where, n = constant
R = hydraulic mean radius
S = longitudinal slope of drain
47
Drawings to be prepared at survey
48
camp
Alignment plan of the road-both preliminary and
final.
Longitudinal Section of the road along the final
alignment to scale of 1:1000 Horizontal and 1:100
vertical.
Cross sections of the road to the natural scale of
1:100 with proposed road profiles.
Drawing of proposed cross drainage work and
details with relevant calculations
Drawings to be prepared at survey
49
camp
The final alignment and the gradients should be fixed
keeping the following points in view and the same got
approved by the staff member:
Avoiding abnormal cuttings and embankments.
Any Questions ?
51
Thank you