Project Management MBA 2020
Project Management MBA 2020
N Siva Prasad
Project
Type
Type
of
of
Projec
Projec
tt
Types of Project ( wrt
resources)
Pure Project( team is full time limited and
committed to that project)
Functional Project: In this the team
members are assigned from the functional
units of the organisation. The members
continue to be part of functional units while
spending effort in this project.
Matrix Project: Uses people from different
functional areas. The tasks are assigned to
functional units and functional unit
manager uses resources to fulfill the task.
Project Structure
Pure Project
Functional Project
Matrix Project
Project Milestone
Specific events in the life of the project
Activities
Pieces of work that consume time
Work Breakdown Structure Example
Overview
Details
Work Breakdown Structure – Large
Optical Scanner Design
Overview
Details
Network-Planning Models
A project is made up of a sequence of activities
that form a network representing a project.
2 7
C(1) J(5)
A(3) H(0)
1 4 8
D(2)
B(3) F(5)
K(7)
3 6
G(1)
AON E(3
)
B(2 G(7
) )
C(4 F(8
) )
Example – Identify Activities and
Construct Network
C(7)
C(7) F(8)
F(8)
A(21
A(21
))
G(2)
G(2)
B(5)
B(5) D(2)
D(2) E(5)
E(5)
Finding Float Time
Find early start time of each event during forward pass
starting from start node.
Consider the maximum of all possible times at that
event/node
Find the latest finish time starting from destination node.
Check the times in reverse pass and consider the least
of all possible finish times.
Float is difference between these two at each node.
The nodes where both are equal are on critical path
Critical path is the path where the activities do not have
any float
Activity float is LF(end node)-Activity duration-ES(start
node)
Determine Early Start/Early Finish and Late
Start/Late Finish Schedule
ES D EF
LS S/ LF
F
Critical 21 28 28 36
Path 1:
ACFG C(7)
C(7) F(8)
F(8)
2 2 2 3
0 21 1 8 8 6 36 38
A(21
A(21
)) G(2)
G(2)
0 2 3 3
1 21 26 26 28 28 33
6 8
Critical B(5)
B(5) D(2)
D(2) E(5)
E(5)
Path 2:
ABDFG 2 2 2 2 3 3
1 6 6 8 1 6
Activity data
Activity To be Duratio
precede n in
d by wks
A -- 1
B A 4
C A 3
D A 7
E B 6
F C,D 2
G E,F 7
H D 8
I G,H 4
ES D EF
LS S/ LF
F E(6
)
B(4 G(7
) )
A( I(4
1) C(3 )
)
F(2
)
H(8
D(7 )
)
ES D EF
ES D EF
S/ LS S/ LF
LS LF F
F ES EF
E(6
D ES D EF
)
LS S/ LF S/
F
LS LF
F
B(4 G(7
) )
ES D EF ES D EF
LS S/ LF ES EF
D LS S/ LF
F F
LS S/ LF
A( F I(4
1) C(3 ES D EF )
)
LS S/ LF
F
ES D EF
ES D EF F(2
LS S/ LF
) F
LS S/ LF
F
H(8
D(7 )
)
Use forward pass( ES and EF)
Use reverse/backward pass( LF and LS)
Find slack or float for each activity either by
LS-ES or LF-EF
The path from start to end through “zero”
slack is the critical path.
It is possible to have more than one critical
path
Note: For ES and EF use forward pass
For LF and LS use reverse pass.
CPM with Activity Time Estimates
When activity times vary, a single time
estimate may not be reliable.
Instead, estimate three values
Minimum
Maximum
Most likely
Example - Three Time Estimates
Time-Cost Models and
Project Crashing
A time-cost model extends the CPM model
to consider the trade-off between time
required to complete an activity and total
project cost.
Considers direct activity costs, indirect costs
of project, and activity completion times
Example – Project Crashing
Project has
reached minimum
duration
Activity D cannot
be reduced any
further at this
point
Activity A cannot
be reduced any
further at this
point
Earned Value
Management(EVM)
Project tracking without EVM
Project tracking with EVM
Budget cost of work performed vs actual
cost incurred
Earned Value Management
Calculate Budgeted cost of work scheduled(BCWS)
Calculate Budgeted Cost of Work Performed(BCWP)
Calculate actual cost incurred( from finance
department wrt that particular project) say 45000
Actual cost of
$45K
obtained
from
For performance indices: accounting
PI < 1 means costs are higher than records
planned
PI = 1 means costs are exactly as
planned
Project Management Information
Systems(PMIS)
MS Project
SAP PM modules
I-Planner
PMP certification from PMI ( US based)
( Project Management Professional)
PRINCE certification (UK based)
Project Report Samples
Thanks a Lot and Best of
Luck!!!