Ohsas 18001
Ohsas 18001
POWER DIVISION
PLAN Clause 4.1, 4.2, and 4.3 expect
you
to plan the establishment of your
OHSMS.
DO Clause 4.4 expects you to
implement your OHSMS.
CHECK Clause 4.5 and 4.6 expect
you to monitor, measure, and report on
the performance of your OHSMS.
ACT Clause 4.5 and 4.6 expect you to
improve your OHSMS
Develop, Document, Implement , Maintain
4.1 GENERAL
& Improve OHSMS in accordance with
REQUIREMENTS OHSAS 18001.
SAF/PPT/OSHAS AW01 VERSION 1.1
4.2 OH&S POLICY
Clearly states overall OH&S objectives
Authorised by top management
Appropriate to nature & scale of OH&S risks
Documented, implemented, and maintained
Communicated to all employees
Available to interested parties
Reviewed periodically
OH&S POLICY COMMITMENTS
Improve health & safety performance
Continual improvement
Comply with OH&S legal and other requirements
4.3.1 HAZARD IDENTIFICATION, RISK ASSESSMENT AND
DETERMINING CONTROLS
Identification of hazards
Evaluation of risks under current
controls
Evaluation of the tolerability of
residual risk
Identification of needed additional
controls
Significant risks must be controlled
Individual behaviour is a significant
factor.
SAF/PPT/OSHAS AW01 VERSION 1.1
To be referred before start of any
HIRA
Ensure there is a system for keeping upto
date with legal changes
Legatrix is being used for monitoring of
legal compliance at sites.
4.3.3 OBJECTIVES AND PROGRAMME(S)
Near miss closure.
Lost time injury frequency of 0.25 or less.
Zero Fatality
Training of 3.5 Man days per person to
Thermax employees.
Management program formulation and
execution to mitigate the hazards identified
at sites.
SAF/PPT/OSHAS AW01 VERSION 1.1
4.4 IMPLEMENTATION AND OPERATION
4.4.1 RESOURCES, ROLES, RESPONSIBILITY,
ACCOUNTABILITY AND AUTHORITY
Responsibility and authority for achieving
the objectives has been given in the
procedure P04.
Organisation Chart has to be displayed at
site.
4.4.2 COMPETENCE, TRAINING AND
AWARENESS Evaluate the competency required
to complete the job safely.
Identify the gap.
Plan training as per the calendar
every month.
Include the persons with identified
gap in training.
Measure the competency level after
the training. (written test)
Safety Induction of new joiners
SAF/PPT/OSHAS AW01 VERSION 1.1
4.4.3 COMMUNICATION, PARTICIPATION & CONSULTATION
Tool box talks before start of activity to
communicate the hazards identify the hazards
identified in HIRA before the activity.
Safety Committee meetings.
Mass tool box talks every fortnight.
To reward the performers.
Get feed back from labours
Communicate about the safety &health
requirements.
4.4.4 DOCUMENTATION &
4.4.5 CONTROL OF DOCUMENTS
Documents Management in their latest format.
Plan to control operations and
activities associated with identified
risks
Linked to HIRA for significant hazards.
Procedures to used for training on
activity and displayed at work place for
awareness.
4.4.7 EMERGENCY PREPAREDNESS AND
Common manual is available for all
RESPONSE
the sites.
Manual to be customised as per
applicable emergencies.
Identifying the Emergency Response
Team.
Displaying emergency contacts.
Practicing emergencies through
mock drills periodically and
corrections of flaws.
Responding to incidents and
SAF/PPT/OSHAS AW01
emergencies when they occur as
VERSION 1.1
4.5 CHECKING
4.5.1 PERFORMANCE MEASUREMENT & MONITORING
Monitoring the achievement of
objectives
Quantitative and Qualitative measures
MIS report.
SSIR.
BSS.
Legal Compliance.
Effectiveness of OCP and document
control.
4.5.2 EVALUATION OF COMPLIANCE
Each Legal requirement is converted into a
task in Legatrix.
Each task is to be complied within the planned
dates.
4.5.4 CONTROL OF RECORDS
Records are to be maintained at site.
Internal audit determines ,
Every Six months.
If it has been implemented and
maintained properly
Conducted by trained internal auditors.
Plan is to be prepared based on the
calendar.
? ? ?
5T 5T Whew! 5T Ouch!
• Fatality – 0 ( Zero)
Clean, hygienic rooms and surroundings.
Secured and Weather proof hutments.
Lavatory arrangement.
Drinking water availability.
Electricity with safe connections.
Protection from insects and snakes.
Area lighting.
Medical and first aid facilities.
1. Heavy lift After sunset not allowed & management directive in this
regard already circulated.