The document outlines a SWAT team project to improve fill rates for NKA lines by reviewing and standardizing processes for forecasting, supply planning, order taking, and delivery to increase stock availability and meet customer commitments. Key areas of focus include improving forecast accuracy, establishing minimum batch sizes, separating supply networks for single source SKUs, providing early promo visibility, and standardizing policies around manufacturing and order changes. The expected outcomes are improved case and line fill rates, additional sales volume, and an estimated 140MM rupees in new revenue opportunities for NKA products.

Uploaded by

Sreedevi Gannae
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
305 views5 pages

BBD

The document outlines a SWAT team project to improve fill rates for NKA lines by reviewing and standardizing processes for forecasting, supply planning, order taking, and delivery to increase stock availability and meet customer commitments. Key areas of focus include improving forecast accuracy, establishing minimum batch sizes, separating supply networks for single source SKUs, providing early promo visibility, and standardizing policies around manufacturing and order changes. The expected outcomes are improved case and line fill rates, additional sales volume, and an estimated 140MM rupees in new revenue opportunities for NKA products.

Uploaded by

Sreedevi Gannae
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Project Charter - NKA Line Fill Rate

Opportunity SWAT Tasks


High
Review the following existing process and firm up the revisions to the
decision panel

Impact
Manufacturing
Forecasting / Demand planning
Supply planning
Low Order taking
Delivery
Difficult Ease of Implementation Easy
Sponsor & Proposed Team
Project definition SWAT Team for ALL 3 days :

• Improvise NKA forecasting with improved stock availability • Planning team


and finalised NKA catalogue. • NKA team including ZKAM
• Drive Fill Rate case & line basis • Logistic team including cluster logistic
• zone wise volume contribution • Shared service team
• Fill rate loss contributing SKU’s • Transformation team
• Servicing of ARS PO’s, CO2 cylinders
Members needed for Day 3 – (summing up of decisions + way fwd)
Project Team members

Timeline Alignment with BU


• Pre SWAT – 29 Jan 2019
• Swat Kick off meet – 3 days : 05, 06, 07 Feb 2019 Support Team: Anand HL, Chiranjeevi, Jainender, Md Iqubal Khurshid, Charubala
Support team will finish the Pre-work & send a pre-read a day before
• Decision day : 14 Feb 2019 the meeting + be available through the week for further help, if required.
Getting Ready for DSSA (Disrupt, Simplify, Standardize, Accelerate)

Pre work for workshop - hyper collaboration with SWAT team members:
• Capturing voice of business stakeholders across touch points
• Value chain analysis emphasizing critical deliverables across the chain
• Mapping of all business process impacting NKA fill rate
• Data analytics of 2018 data set and prioritizing critical areas

Team members:

Planning Alok Sharma, Anand H L, Kishore KhannaL, Vikas Kumar


Key Account Abhishek Gupta, Rohit Guleria, Pallavi Agarwal, Nanduri Srinivas, Venkat Raman
Ojha, Sunil Devarasetty
Logistic Umesh Madhyan, A Senthil, Tarun Sawhney, Rajeev Singh, BN Sarkar, Chiranjeevi
Conrad Malhiers, Mahesh Bailur, Faimid Sattar Kazi
Transformation Sathish Narayanan, Jainender Jain
SWAT – NKA Fill Rate
Disrupt Standardize Simplify Accelerate

• For common pack Fresh


• Minimum Batch Size agreement
production of SKU should not
at line level for season / off-
be put on hold if freshness
season to be reinforced for
<70% with defined liquidation
Manufacturing MSBF
policy

• Mid month (before 2nd week


• Forecast accuracy against PO at Thursday) forecast tweaking • Promotion plan early visibility 6
channel level with split of NKA, shall be done based on weeks before KO Qtr end for
LKA & premium requirement from ZKAM next Qtr plan for B2C
Forecasting keeping monthly number same

• For common pack Fresh


production of SKU should not • NKAM/ ZKAM empowerment
be put on hold if freshness for liquidation
<70% with defined liquidation
Supply planning policy

• Frequent change in MOP. Policy


• Consistency of promotion &
• Separate PO & multiple GRNs to to be designed to minimize MOP
Volume commitment to
be pursued with customers for changes
customer for promo budget and
Single Source SKU (MT) • Instead of 7 days, 14 days PO lead
volume commitment
Order Taking time for Single Source SKU’s (MT)

• Separate Supply Network • Stock Reservation on Forecast


• Schedule phasing to be given by
(Deployment Plan) for Single with delivery schedule (MT)
customer for bulk PO for
Source SKU (MT) • Dispatch on NKA customer
configuring appointment
• CO2 Refill outsourcing through based on 70% freshness as per
Delivery central procurement for NKA
through SAP
Label
Outcome expected – NKA Fill Rate

Improved Fill rate & additional sales opportunity


Improved Forecasting

Flexibility in Supply Chain Case Fill Rate Line Fill rate Volume
Improved 96% 90% 0.38MM pc
Stock reservation Stock
availability
Estimated 140MM on NR opportunity (30MM OI impact)
Separate Supply Network
NKA Catalogue Finalization & MSBF
Fresh stock production
NKA Catalogue NKA MSBF
Finalization Finalization
Promo consistency

Improved promo visibility Improved


consistency
Policy on MOP change in Front  Reduced inefficiency
End 20MM INR cost
Bulk PO phasing from customer
saving opportunity

Single source SKU’s Lead time  Wave 2 to be initiated

You might also like