The document summarizes Sanyam Shukla's training projects at PWD, including the Shastri Park and Seelampur Flyover project worth Rs. 303 crores consisting of two flyovers, the ITO Tunnel project worth Rs. 777 crores connecting India Gate to central Delhi, and operations at a concrete batching plant. Key activities included excavation, casting precast concrete boxes for the tunnel, and hydraulically pushing the boxes using jacks. The trainee learned about labor management, safety practices, new box pushing technology, flyover components, and batching plant operations.
Download as PPTX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
900 views
Internship Report On PWD
The document summarizes Sanyam Shukla's training projects at PWD, including the Shastri Park and Seelampur Flyover project worth Rs. 303 crores consisting of two flyovers, the ITO Tunnel project worth Rs. 777 crores connecting India Gate to central Delhi, and operations at a concrete batching plant. Key activities included excavation, casting precast concrete boxes for the tunnel, and hydraulically pushing the boxes using jacks. The trainee learned about labor management, safety practices, new box pushing technology, flyover components, and batching plant operations.
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 17
Dr.
Akhilesh Das Gupta Institute of Technology and Management
Shastri Park, Flyover Project in Delhi 110053 PARK and SHASTRI SEELAMPUR and Integrated Transit Corridor Development in and around PRAGATI MAIDAAN
Submitted By Submitted To Sanyam Shukla Mr. Ankur Tayal INTRODUCTION
Worked at 4 projects of PWD during the training period
• Shastri Park and Seelampur Flyover • ITO Tunnel • Box Pushing in Pragati Maidan • Batching Plant
There were 2 contractors
• Gawar Construction • L&T Construction SEELAMPUR AND SHASTRI PARK FLYOVER •2 Km project worth 303 Crores. •The 1st project is a 700m long six lane flyover with a double carriageway at Shastri Park junction. •The width of each carriageway is 10.5m. •The flyover will have two loops; one coming from Khajuri Chowk and turning towards Kashmiri Gate and the second one coming from Gandhi Nagar and turning towards Shahdara. •The 2nd project is a 1.2 km long two-lane, one-way flyover. •The width of each carriageway on the Seelampur flyover is 7.5m. SEELAMPUR AND SHASTRI PARK FLYOVER Components of Flyover: •Foundation •Piers •Abutments •Deck •Backfill •RE Walls •Reinforcing Strips SEELAMPUR AND SHASTRI PARK FLYOVER •Grade : M45 •Foundation: Pile foundation •Diameter of pile: 1000mm •Depth of pile: 28m •Diameter of pier:2000mm •Reinforcement: 6% of cross sectional area •Bars: Fe500D of 32mm diameter SEELAMPUR AND SHASTRI PARK FLYOVER •Deck width: 8500mm •Deck height: 2204mm •Carriageway width: 7500mm •Gradient: 1 in 30 •Compaction: By smooth drum vibratory rollers •Fine uniform sand is used for backfilling •Moisture content: 1 to 2% more than OMC during compaction •Parawebs are used as reinforcing strips •Geotextiles are also used for drainage of water ITO TUNNEL PROJECT •777 crore project •1.8 Km tunnel connecting India Gate to other central parts of Delhi •The tunnel road would go beneath the revamped Pragati Maidan •It will start near the National Sports Complex of India(NSCI) •It will end at Ring road near Pragati Power Station. ITO TUNNEL PROJECT •Length:1.8 Kms •Width:27600mm •Height:5740mm •Grade: M45 for columns •Grade: M20 for raft foundation •Depth: 8000mm ITO TUNNEL PROJECT •Piers: 1000mm*1000mm •Foundation: 2000mm*2200mm •Pedestal: 2000mm*2200mm •Depth of foundation:1100mm •Roof slab: 1275mm •Benzonite is used to prevent collapse of soil •Polyeurathene is used for waterproofing BOX PUSHING •Part of the ITO tunnel Project •777 crore project •1.8 Km tunnel connecting India Gate to other central parts of Delhi •The tunnel road would go beneath the revamped Pragati Maidan •It will start near the National Sports Complex of India(NSCI) •It will end at Ring road near Pragati Power Station. BOX PUSHING 3 main operations •Excavation •Casting of Box •Pushing of Box Materials •Thrust bed •Precast box •Pin Pockets •Hydraulic jacks BOX PUSHING Box dimensions •Outer: 7945mm*14600mm •Inner: 5545mm*12200mm •Length: 10000mm •Slab height:1200mm •Hunch:300mm BOX PUSHING Jacking operation •For pushing the box unit, the jacking will be placed behind the RCC box along the axis of the pockets and the jacking pins will be inserted in pockets of thrust bed. •While the pushing of first segment is in progress, second segment of the box will be cast on adjacent area of the thrust bed. After complete casting and curing of second box unit, the same will be shifted on the line of alignment of the pushing on thrust bed •Pins and jacks will now be shifted on main thrust bed behind second box unit and the second unit will be pushed near shield of the first box unit by hydraulic jacks •Rate of pushing is 10mm in 40 sec with maximum of 800mm in a day. BATCHING PLANT • A Concrete Batching Plant is a machine to manufacture Concrete from its ingredients viz Cement, Crushed Stone, Sand, Water and Admixture Chemicals. • For large and important projects, it is better to have a concrete batching plant for high efficiency, high speed, and accuracy and quality concrete. BATCHING PLANT Raw Materials •Aggregates •Cement •Water •Admixtures Two types of concrete batching plants •Wet type concrete batching plant •Dry type concrete batching plant BATCHING PLANT Components of batching plant •Aggregate batching system •Mixing system •Cement silos •Control systems CONCLUSION •Learned about managing the labors. •Learned about the various saftey practices. •Learned about new technology known as the box pushing. •Learned about the flyovers. •Learned about the working of batching platnts.