Aero Engine Services: Pt. Nusantara Turbin Dan Propulsi
Aero Engine Services: Pt. Nusantara Turbin Dan Propulsi
Aircraft Type
Fokker100
NTP Capabilities for RR Tay 650-15 PT. Nusantara Turbin dan Propulsi
Approved Overhaul Facility
• Fully supported by
Rolls Royce Plc, Under contract : DEG 5814 as
Technical Assistance Agreement
• Authorities Approved
1. DGCA - Indonesia, 145/9900
2. FAA - United Stated, NZQ006J
3. EASA – Europe, EASA.145.0401
NTP Capabilities for RR Tay 650-15 PT. Nusantara Turbin dan Propulsi
Approved Overhaul Facility
Flight Plan
C&D B A A B C&D
(Limiting Module)
Planned Removal
Effective Limiter
Engine performance 22,000 20,000 18,000
(cycles)
Consider each Module separately when planning the work-scope for the Engine.
The TAY 650 EMP now defines five basic work package levels
• Level 3 - Refurbishment
Level 3 Refurbishment applies to Modules 04 and 06
Do a Level 3 work package if the Module has reached its Level 3 soft time. This
work package is to restore performance and make sure that the Module can
achieve the target build life of the engine. The Module will require disassembly
to carry out all the tasks described in the Level 03 work package.
•
Engine Testing PT. Nusantara Turbin dan Propulsi
Approved Overhaul Facility
• On The Wing
On Site
Supporting Facilities PT. Nusantara Turbin dan Propulsi
Approved Overhaul Facility
• ENGINEERING
• CLEANING PROCESSES
• INSPECTION
• SURFACE TREATMENT
• BALANCING
• LABORATORY
• MANAGEMENT
INFORMATION SYSTEM
• SKILLED LABOR
• FIELD SERVICE
Special Services PT. Nusantara Turbin dan Propulsi
Approved Overhaul Facility
• Welding
• Electrical Run Out
• Electroplating
• Machining
• Plasma Spray
• Non Destructive Test
• Shot Peening
• Sermetal
• Heat Treatment
• Calibration
SUMARRY PT. Nusantara Turbin dan Propulsi
Approved Overhaul Facility