Project Management
Project Management
Ashra 20185006
MANGMENT
MANAGMENT
OUTLINE 10
11
RESOURCE LEVELLING
CREATING FILTER
32
40
12 CREATING INTERACTIVE FILTER 44
13 CUSTOMIZED RIBBION 53
14 EARNED VALUE ANALYSIS 58
OUTLINE 15 CREATING BUTTONS 78
16 CREATING REPORTS 91 2
• BASICS OF MS PROJECT
• MS PROJECT INTERFACE
• CHANGE IN SETTINGS
• DISPLAY CHANGES :
CURRENCY
• RECORDING DATA
3
Basics of MS Project
4
Ms Project interface Tool bar
5
Change in setting File-> Options -> Schedule
Input according to
the requirement
Change to decimal
Files>options>display
7
Recording data
Select all> Auto schedule
8
Recording data
9
ADDING SUBTASK
10
Adding subtask
11
Adding subtask Click the intended
task
12
Adding Subtask
13
ADDING FIELDS :
USING TEXT FUNCTION
14
Adding fields [Text function]
15
Right click > custom field
16
Add names for options
17
List will appear once the
drop down menu is opened
18
Do the same for other text
field.
19
Add location as we add
mangers
20
ADDING RESOURCES
21
Adding resource
22
Add resource name, type
,Max resource able and rate
23
Add the resources from
drop down menu
OR
Double click on the cell
24
After double click,
Resource can be added
Add number of units need
for the task
Click ok
25
Number of units will be seen
here
26
Add column of cost
27
SITUATION :
RATE CHANGE DURING
PRODUCTION PHASE
28
Situation : Rate change during production phase
Click on
View>resource
sheet
Than
Resource>
Information
29
Enter the date from
which new rate Click ok
should be effective
30
Rate are changed in
production phase
31
RESOURCE LEVELLING
32
Resource levelling
Go to
Views>More Views>
Resource allocated
graph
33
Go to
Views>More views>
Task detail forms
34
For all the task it
should be
Efforts driven (tick)
And Task type fixed
duration
35
TICK OPTION “Level
only within available
slack option”
36
Go to resource> Level
recourses Click option “Level
now”
37
As there is no slack available
we see red soldiers and still
resources are not sufficient
38
As resource leveling is not possible,
we will Gradually increase the
Resources.
From 50 to 57
39
CREATING FILTER
40
Creating NEW Filter: Location and Manager
Go to
View> Filter
41
Change the name
42
Apply the filter
43
CREATING
INTERACTIVE FILTER
44
Interactive filters
Value
Write question with
“ write inside this :”?
Change name
45
Apply filter
46
2nd question will be asked
47
Filter applied will reflect
the filter result
48
Macros : Creating clear filter
Click on Macro
49
Name the macro
Click ok
50
Select the clear filter
51
Select the Macro Click Macros > View Macro
52
CUSTOMIZED RIBBION
53
Customized ribbon
54
Click on new tab and click ok
55
Select the option from
here
Click ok
56
Will get a new tab in main
menu
57
EARNED VALUE
ANALYSIS
58
Earned value analysis
59
Go to schedule
Go to file >options
60
Go to Project information
62
Add % work competed.
This is to be entered manually
according to the work
competed
63
Add BCWP
:Budgeted cost of work
Performed
64
Add ACWP Actual cost
65
Add CPI : Cost Performance
Index :
Earned Value/ Actual cost
This is a measure of the
conformance of the actual
work completed to the actual
cost incurred
If CPI Is
Greater than 1 : Over budget
Equal to 1 : on budget
Less than 2 : Under budget
66
Add SPI :schedule performance
index:
Earned Value /Planned Value
is a measure of the
conformance of actual progress
to the planned progress
If CPI Is
Greater than 1 : Over budget
Equal to 1 : on budget
Less than 2 : Under budget
67
Add EAC :
Estimated At completion is the
estimate of the final project
cost given the past
performance of the project
68
Add Duration 1
69
Right click and go to custom
fileds
70
Rename it as “Forecast
Duration”
Click rename
Click ok
71
Click ok
72
Click on formula
73
Select Duration >Duration
Go to Field
74
Select Back slash for divide
Go to Cost> SPI
Go to fields
75
This formula for Forecasted
duration = Duration/SPI
Click ok
76
We see actual duration is 10 Now, we say it has changed to
days 20 days.
77
CREATING BUTTONS
78
Go to macros
Go to Visual Basics
79
Go to insert > Userform
80
This dialog boxes will open
81
Square button will open here
82
Right click on the button
Go to View code
83
This window will appear after
selecting view code
84
Go to Gantt chart Go to macros > View Macros
85
Select the macro for which you
need the code
86
This widow will appear
Copy the code which appears in
black
87
Paste the code here in this
window
88
Go to Run > Runsub /User form
89
Click the button, for applying
the command.
90
CREATING REPORTS
91
Go to Reports
92
Select Chart
( Can select any option )
93
Rename the report
94
Can edit the report : add and
subtract the fields as we do it in
excel
Report is created
95
Different options can be used
to make report interesting and
creative
96
THANK YOU