PSM Audit Sept 2019
PSM Audit Sept 2019
september 2019
WINA Gresik PSM Organization chart
Oleochemicals GRESIK
Oleochemicals PSM Audit WINA Gresik
ME FAL
(Hendra)
TF BD Biodiesel
(Taufan) (Edi)
Finishing
TF Oleo
Plant
(Supriyo)
(Anton)
OLEO
DIVISION
ETP FA GLY
(Anton) (Farouq)
Consists of:
Equipment - Electrical Integrity
Consists of: Integrity - Mechanical
- Hot work Integrity
High Risk
- Confined Entry Work
- Working At
Heights
- Energy Isolation
PSM AUDIT WINA GRESIK Start Audit = 71.4
Avg. Aug = 78.3
PSM_14_Emergency_Management_Plan Avg. Sept = 80.5
PSM_13_Process_Readiness
PSM_12_Employee_Participation
PSM_11_Intellectual_Property
PSM_10_Metrics_And_Compliance_Auditing
PSM_09_Incident_Investigation
PSM_08_Management_Of_Change
PSM_07_High_Risk_Work
PSM_06_02_Asset_Integrity_Mechanical
PSM_06_01_Asset_Integrity_Electrical
PSM_05_Contractors
PSM_04_Training
PSM_03_Operating_Procedure
PSM_02_Process_Hazard_Analysis
PSM_01_Process_Safety_Information
0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0
Gap Assessment Wina Gresik 1 Aug 19 WINA Gresik 12 Sep 19
General PSM TIME LINE
Internal Cross Audit Schedule WINA Gresik
Section June July Aug Sept Oct Nov Dec 2020 Jan 2020 Feb
MES 28-Jun X
Finishing 12-Jul X
Biodiesel X X Proposed
Volac 24-Jul Internal X Internal External
ME FAL X Evaluation X Evaluation Evaluation
FA Gly X (1) X (2) (Target average
ETP 7-Aug X 80%)
TF Oleo X
TF BD X
*Note : TF Oleo & TF BD start internal audit in phase 2
Auditor : Pak Edi Toni, Pak Hendra B, Pak Farouq, Pak Vipassi, Sukron & Johan
before after
Electrical connection need to tidy up. Unsafe
condition
PSM_06_01_ASSET_INTEGRITY_ELECTRICAL
Gas SO2 detector need to
repair due to offline while
checking on site
before after
PSM_06_02_ASSET_INTEGRITY_MECHANICAL
Rotating equipment must be
installed cover
PSM_06_02_ASSET_INTEGRITY_MECHANICAL