Optimal Power Flow Solution For Indian Utility 62 Bus System
Optimal Power Flow Solution For Indian Utility 62 Bus System
by
Yeshitela Shiferaw Maru
1. Introduction
5. Conclusions
2/5/2020 2
1.Introduction
The optimization can be defined as the process of finding the
conditions that provide the minimum or maximum value of a
chosen objective function.
The optimal power flow was at first developed by Carpentier in
1962 to minimize generator cost.
2/5/2020 3
2/5/2020 4
1.Introduction
2/5/2020 5
2.Formulation of optimal power flow
𝑁𝐺
Cost Minimize 𝐹 = 𝑎𝑖 𝑃2 𝑔𝑖 + 𝑏𝑖 𝑃𝑔𝑖 + 𝑐𝑖 $Τℎ + 𝑝𝑒𝑛𝑎𝑙𝑡𝑦
𝑖=1
𝑛𝑔
The voltage 𝑉𝑖
𝐿𝑗 = |1 − 𝐹𝑗𝑖 ∠𝜃𝑖𝑗 + 𝛿𝑖 − 𝛿𝑗 | + 𝑝𝑒𝑛𝑎𝑙𝑡𝑦
stability index (L) 𝑉𝑗
at the load bus 𝑖=1
stated as
2/5/2020 6
2.Formulation of optimal power flow
𝑁𝐿
Voltage Deviation (VD) 𝐹 = |𝑉𝑖 − 1.0| + 𝑝𝑒𝑛𝑎𝑙𝑡𝑦
𝑖=1
2/5/2020 7
2.Formulation of optimal power flow
Equality constraints
𝑛
𝑃𝐺𝑖 − 𝑃𝐷𝑖 − |𝑉𝑖 ||𝑉𝑗 | |𝑌𝑖𝑗 |cos 𝜃𝑖𝑗 − 𝛿𝑖 + 𝛿𝑗 = 0
𝑗=1
𝑛
𝑄𝐺𝑖 − 𝑄𝐷𝑖 + |𝑉𝑖 ||𝑉𝑗 | |𝑌𝑖𝑗 |sin൫𝜃𝑖𝑗 − 𝛿𝑖 +
𝑗=1
Inequality constraint
min max
Real power generation limits 𝑃𝐺𝑖 ≤ 𝑃𝐺𝑖 ≤ 𝑃𝐺𝑖
min max
Voltage limits for generator bus 𝑉𝐺𝑖 ≤ 𝑉𝐺𝑖 ≤ 𝑉𝐺𝑖
min max
Reactive power generation limits 𝑄𝐺𝑖 ≤ 𝑄𝐺𝑖 ≤ 𝑄𝐺𝑖
2/5/2020 8
2.Formulation of optimal power flow
2/5/2020 9
3, PROPOSED LEAGUE CHAMPIONSHIP ALGORITHM
Step 2: . Initializing league size (L), the number of seasons (S) and a
maximum number of seasons, and generate league schedule compete in
pairs for S*(L-1), where S is a number of seasons and week is denoted
by t. Also initializing team formations.
Step 3: determine the winner/loser at the first match.
Step 4:Devise a new formation for the team i for the forthcoming
match ,and evaluate the playing strength of the resulting arrangement
ln(1 − 1 − 𝑝 𝑁 ሻ𝑟
𝑐
𝑞𝑖𝑡 =
2/5/2020 ln(1 − 𝑝𝑐 ሻ 12
3, PROPOSED LEAGUE CHAMPIONSHIP ALGORITHM
Step 5: If the new formation is the fittest one (that is, the new
solution is the best solution achieved so far for the ith member of
the population),
Step 7: Search for the optimal set of the control variables step
2,3,4,5 and 6
2/5/2020 13
3, PROPOSED LEAGUE CHAMPIONSHIP ALGORITHM
Step 9: Compare the objective function values for the previous and
updated solution
Step 10. Stop and report the optimal value if the maximum season
is touched, then display the results otherwise return to step 2.
2/5/2020 14
4. Result and discussion
The proposed Indian utility 62 bus test system has the following
characteristics: 19 generators, 11 transformers with an off-nominal
tap, 2 injected VAR source, 89 number of the transmission line, and
33 PQ buses. The system base is 100MVA, 50Hz and the total load
demand is 2908MW and 1270MVAr.
2/5/2020 15
4. Result and discussion
2/5/2020 16
Optimal setting of control variable IEEE-30 bus using proposed
LCA
Control Mini Maxim Case 1 Case 2 Case 3 Case 4 Case 5
variable mum um
value value
Fuel cost - -
($/hr.) 799.1087 803.2752 800.0185 964.1988 965.3353
Real power - - 8.61 9.8557 8.6701 2.9104 3.1163
loss(MW)
2/5/2020 17
Optimal setting of control variable Indian utility 62 bus using
proposed LCA
Control Mini Maximu Case 1 Case 2 Case 3 Case 4 Case 5
variable mum m value
value
Fuel cost - - 9106.53 9881.88 9017.588 9976.189 10148.28
($/hr.)
2/5/2020 18
Fuel cost variation for case 1
2/5/2020 19
2/5/2020
Variation of fuel cost, and voltage 20
deviation for case 2
Variation of fuel cost , and stability index for case
3
2/5/2020 21
Variation of real power for case 4
2/5/2020 22
Variation of reactive power for case 5
2/5/2020 23
Comparison of LCA and other algorithm reported in the literature
for OPF of IEEE-30 bus system
only in [26], and [27] explain the total fuel cost of minimization
2/5/2020 25
5. Conclusions
2/5/2020 26
5. Conclusions
The proposed algorithm result was compared with those
reported in the literature in terms of the objective function such
as minimization of fuel cost, fuel cost along with voltage
deviation improvement, fuel cost along with voltage stability
enhancement, and minimization of real & reactive power
2/5/2020 27
Thank You !
2/5/2020 28