GUIDELINES AND
IMPLEMENTING RULES ON
EARTHQUAKE RECORDING
INSTRUMENTATION FOR
BUILDINGS
GOVERNMENT BUILDINGS:
(A)
HOSPITALS, SCHOOLS AND 3 ACCELEROGRAPH INSTALLED
OTHER BUILDINGS 50METERS AT THE GROUND FLOOR,
HIGH AND ABOVE MIDDLE FLOOR AND FLOOR
BELOW ROOF
EARTHQUAKE RECORDING
INSTRUMENTATION REQUIREMENTS:
GOVERNMENT BUILDINGS:
(B)
HOSPITALS, SCHOOLS
HOSPITALS WITHAND OTHER
50-BED3 1ACCELEROGRAPH INSTALLED
ACCELEROGRAPH AT
INSTALLED
BUILDINGS 50METERS
CAPACITY OR MOREHIGH AND
AND THE GROUND
AT THE FLOOR,
GROUND FLOORMIDDL
OR THE
ABOVE
SCHOOLS WITH 20 CLASSROOM FLOOR ANDBASEMENT
LOWEST FLOOR BELOW ROOF
OR MORE BUT NOT LESS THAN
3 STOREY HIGH
EARTHQUAKE RECORDING
INSTRUMENTATION REQUIREMENTS:
GOVERNMENT BUILDINGS:
(C)
PROVINCIAL/CITY/MUNICIPAL 1 ACCELEROGRAPH INSTALLED
HALLS AND BUILDINGS AT THE GROUND FLOOR OR
THE LOWEST BASEMENT
EARTHQUAKE RECORDING
INSTRUMENTATION REQUIREMENTS:
PRIVATE BUILDINGS:
(A)
BUILDINGS 50METERS HIGH 3 ACCELEROGRAPH INSTALLED
AND ABOVE AT THE GROUND FLOOR,
MIDDLE FLOOR AND FLOOR
BELOW ROOF
EARTHQUAKE RECORDING
INSTRUMENTATION REQUIREMENTS:
PRIVATE BUILDINGS:
(B)
HOSPITALS WITH 50-BED 1 ACCELEROGRAPH INSTALLED
CAPACITY OR MORE AND AT THE GROUND FLOOR OR
SCHOOLS WITH 20 CLASSROOM THE LOWEST BASEMENT
OR MORE BUT NOT LESS THAN
3 STOREY HIGH
EARTHQUAKE RECORDING
INSTRUMENTATION REQUIREMENTS:
PRIVATE BUILDINGS:
(C) INDUSTRIAL AND COMMERCIAL
BUILDIUNGS 1 ACCELEROGRAPH INSTALLED
AT THE GROUND FLOOR OR
THE LOWEST BASEMENT
STANDARD SPECIFICATIONS /
REQUIREMENTS FOR
EARTHQUAKE RECORDING
INSTRUMENTS
STANDARD SPECIFICATIONS /
REQUIREMENTS FOR EARTHQUAKE
RECORDING INSTRUMENTS :
Accelerograph must have:
• Sensitivity - 40 μg to 2g
(B)Service period
• Maximum service interval is one(1) year