1) The document provides guidelines for earthquake recording instrumentation in buildings to record structural response during seismic events and improve building codes. 2) It specifies requirements for installing accelerographs in various types of government and private buildings based on their height and occupancy. 3) Standard specifications for accelerographs include sampling frequency, sensitivity, noise levels, time accuracy, and communication capabilities. Proper installation and data interpretation procedures are also outlined.

Uploaded by

Rikky Zulueta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
413 views28 pages

Appendix 1 B

1) The document provides guidelines for earthquake recording instrumentation in buildings to record structural response during seismic events and improve building codes. 2) It specifies requirements for installing accelerographs in various types of government and private buildings based on their height and occupancy. 3) Standard specifications for accelerographs include sampling frequency, sensitivity, noise levels, time accuracy, and communication capabilities. Proper installation and data interpretation procedures are also outlined.

Uploaded by

Rikky Zulueta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 28

APPENDIX 1-B

GUIDELINES AND
IMPLEMENTING RULES ON
EARTHQUAKE RECORDING
INSTRUMENTATION FOR
BUILDINGS

BY: RAMOS, XYRELE JOY


ASUNCION, MAIDELLE
PURPOSE:

• To provide information on the specifications and uses of


earthquake recording instruments.
• To provide earthquake instrumentation schemes for
certain buildings.
To record response during major seismic events
To give adequate analysis of building response during
earthquake
OBJECTIVE:

To improve understanding of the actual dynamic behavior


of buildings under earthquake loading and confirm the
design according to the NSCP.
• The recorded data can be use to improve the structural code
thereby reducing loss of lives and limbs as well as properties
during future damaging earthquakes.
• Earthquake recording instrumentation is also called
accelerograph (I.R.R.).
PURPOSE AND FUNCTION OF
ACCELEROGRAPH:
PURPOSE AND FUNCTION OF ACCELEROGRAPH:

1. Structural health monitoring and recording.


To record the dynamic response of the building during
earthquake

2. Provide intermediate alarm annunciation


To move the building occupancy safety.
THE ACCELEROGRAPH MUST BE CONNECTED TO THE
OTHER BUILDING SYSTEM LIKE:
• PUBLIC ADDRESS SYSTEM
THE ACCELEROGRAPH MUST BE CONNECTED TO THE
OTHER BUILDING SYSTEM LIKE:
• FIRE ALARM SYSTEM
THE ACCELEROGRAPH MUST BE CONNECTED TO THE
OTHER BUILDING SYSTEM LIKE:
• ELEVATORS
THE ACCELEROGRAPH MUST BE CONNECTED TO THE
OTHER BUILDING SYSTEM LIKE:
• GAS LINE AND WATER LINE
PURPOSE AND FUNCTION OF ACCELEROGRAPH:

3. Secondary disaster management system


Other calamities that can happen during an earthquake like
explosion from gas leak that will cause fire.

4. Upgrade building codes and disaster management


To improve the structural code
EARTHQUAKE RECORDING
INSTRUMENTATION
REQUIREMENTS:
EARTHQUAKE RECORDING
INSTRUMENTATION REQUIREMENTS:

GOVERNMENT BUILDINGS:
(A)
HOSPITALS, SCHOOLS AND 3 ACCELEROGRAPH INSTALLED
OTHER BUILDINGS 50METERS AT THE GROUND FLOOR,
HIGH AND ABOVE MIDDLE FLOOR AND FLOOR
BELOW ROOF
EARTHQUAKE RECORDING
INSTRUMENTATION REQUIREMENTS:

GOVERNMENT BUILDINGS:
(B)
HOSPITALS, SCHOOLS
HOSPITALS WITHAND OTHER
50-BED3 1ACCELEROGRAPH INSTALLED
ACCELEROGRAPH AT
INSTALLED
BUILDINGS 50METERS
CAPACITY OR MOREHIGH AND
AND THE GROUND
AT THE FLOOR,
GROUND FLOORMIDDL
OR THE
ABOVE
SCHOOLS WITH 20 CLASSROOM FLOOR ANDBASEMENT
LOWEST FLOOR BELOW ROOF
OR MORE BUT NOT LESS THAN
3 STOREY HIGH
EARTHQUAKE RECORDING
INSTRUMENTATION REQUIREMENTS:

GOVERNMENT BUILDINGS:
(C)
PROVINCIAL/CITY/MUNICIPAL 1 ACCELEROGRAPH INSTALLED
HALLS AND BUILDINGS AT THE GROUND FLOOR OR
THE LOWEST BASEMENT
EARTHQUAKE RECORDING
INSTRUMENTATION REQUIREMENTS:

PRIVATE BUILDINGS:
(A)
BUILDINGS 50METERS HIGH 3 ACCELEROGRAPH INSTALLED
AND ABOVE AT THE GROUND FLOOR,
MIDDLE FLOOR AND FLOOR
BELOW ROOF
EARTHQUAKE RECORDING
INSTRUMENTATION REQUIREMENTS:

PRIVATE BUILDINGS:
(B)
HOSPITALS WITH 50-BED 1 ACCELEROGRAPH INSTALLED
CAPACITY OR MORE AND AT THE GROUND FLOOR OR
SCHOOLS WITH 20 CLASSROOM THE LOWEST BASEMENT
OR MORE BUT NOT LESS THAN
3 STOREY HIGH
EARTHQUAKE RECORDING
INSTRUMENTATION REQUIREMENTS:

PRIVATE BUILDINGS:
(C) INDUSTRIAL AND COMMERCIAL
BUILDIUNGS 1 ACCELEROGRAPH INSTALLED
AT THE GROUND FLOOR OR
THE LOWEST BASEMENT
STANDARD SPECIFICATIONS /
REQUIREMENTS FOR
EARTHQUAKE RECORDING
INSTRUMENTS
STANDARD SPECIFICATIONS /
REQUIREMENTS FOR EARTHQUAKE
RECORDING INSTRUMENTS :
Accelerograph must have:

• Sampling frequency - 100 samples per second

• Sensitivity - 40 μg to 2g

• RMS noise - less than 40 μg

• Time accuracy - ± 0.2 seconds per 100 seconds


Via GPS or NTP server

• Communication - TCP/ IP/FTP/SFTP


Via ethernet
STANDARD SPECIFICATIONS /
REQUIREMENTS FOR EARTHQUAKE
RECORDING INSTRUMENTS :
Accelerograph must:

• Stores seismic activity


capable of continuous recording on built-in media
card at least 1 year capacity

• Equipped with fault detection and real-time alarm information

• Equipped with internal battery back-up and charger to ensure


continuous operation

• Environment must be dust tight and water tight


LOCATION INSTALLATION OF
THE INSTRUMENTS
LOCATION INSTALLATION OF THE
INSTRUMENTS :
(A) GENERAL
• No instruments shall be located in refuge area
• The room should have adequate space to securely mount
the instrument
(B) BUILDING WITH THREE(3) OR MORE INSTRUMENTS
• Accelerograph/accelerometers
 Ground floor/lowest basement, middle floor and the
topmost floor of the building
DATA RETRIEVAL AND
INTERPRETATION
DATA RETRIEVAL AND INTERPRETATION:

(A)Shall be perform by accredited structural engineer

(B)The data and interpretation of the building shall be submitted


by the owner to the dpwh for storage, post-earthquake safety
evaluation of the building and for emergency response.
SUPPORT
AND MAINTENANCE
SUPPORT AND MAINTENANCE:

(A)Maintenance and service must be provided by the owner of


the building

(B)Service period
• Maximum service interval is one(1) year