Conveyor
Conveyor
DEPT. CONVEYOR
Disusun oleh :
Tulus Prasetyo
Departemen Conveyor
Jadwal Training
Departemen Conveyor
Layout Dept. Conveyor
Dept Conveyor
Departemen Conveyor
Product
1. Multi-ply Conveyor Belt (SUNCON)
2. Less-ply Conveyor Belt (SUNLON)
3. Bucket Elevator Belt
4. Rough-Top Conveyor Belt
5. V-Cleat Conveyor Belt
6. Shoot-blast Belt
7. Scaling Belt
8. Mosquito Endless Belt
9. Rubber Sheet (skirt, lagging, screen, packing, etc)
Departemen Conveyor
Flow Proses Dept. Conveyor
CANVAS SLITING ROLLER COMPOUND
HEAD
BUILDING
CALENDER 3 CALENDER 4 MACHINE CURING
ROLL ROLL MACHINE
OR
EY
NV
CO
C
A
N
V
A
S
T
O
CANVAS P
P
IN
G
Departemen Conveyor
Flow Prosess Dept. Conveyor
CURING
ROTOCURE
MACHINE
FINISHNG PACKING
DELIVERY
Departemen Conveyor
Temperature Roll (°C ) Tol. ± 5
Temperatur Roll saat GRADE JENIS COMPOUND
Roll 1 Roll 2 Roll 3 Roll 4
Semua 80 65 65 60 80 55 60 65
Grade
Selain 55 60 50 55 60 55 60 65
HC-
513
HC- 65 65 55 55 55 55 60 70
513
Temperature Roll pendingin ≤ 40°c
Departemen Conveyor
Roller Head mesin
ROLLER HEAD
3. Karakteristik Tebal : Top cover = tebal order + 0,2 mm
Bottom cover = tebal order + 0,9 mm
Tebal : Standar (mm) Toleransi (mm) Lebar : lebar order + 60 mm
0,5 – 2,5 ± 0,5 Panjang : Panjang order + 1
m
≥ 2,51 ± 0,20
Kecepatan (RPM): saat pengisian awal 5 RPM
Tebal (mm) Lebar (mm) Speed (RPM)
1,0 – 3,0 ≤ 1080 5,0 – 8,0
1080 - 1680 3,0 – 5,0
1681 - 2080 2,0 – 3,0
3,1 – 5,0 ≤ 1080 4,0 – 7,0
1080 – 1680 2,5 – 4,0
1681 – 2080 1,5 – 2,5
5,1 – 1,0 ≤ 1280 2,0 – 3,5
1281 – 2080 1,2 – 2,0
SLITTNG
1. Input Canvas
4. Kondisi Lebar dan Panjang sesuai dengan standar dan tidak ada bulu
Normal pinggir
5. Kondisi Jika lebar dibawah standar maka afkir
Abnormal Jika panjang dibawah standar maka pisahkan untuk disambung
Jika ada bulu pinggir maka harus dipotong ulang
Departemen Conveyor
Calender 3 Roll
CALENDER 3 ROLL
1. Input Compound
2. Output Side Gum
3. Karakteristik Tebal side gum = jumlah ply x tebal ply
Panas : Roll 1 Roll 2 Roll 3 Tebal : Standar (mm) Toleransi (mm)
80°c 75°c 80°c 0,50 – 2,50 ± 0,15
≥ 2,51 ± 0,20
Lebar : Standar (mm) Toleransi (mm) Panjang (m) :
40 ±2 Panjang Order + 0,5 – 1,0 m
33 ±2
20 ±2
Contoh pemakaian compound : Grade Jenis Compound
JIS-S GC-07, GC-06, GC-31
OR-220 GN-632
FR-300J GC-87
HC-710 GX-326
Calender 4 Roll
1. Input Canvas
2. Output Topping Canvas (Fabric)
3. Karakteristik
Grade Jenis Temperature Roll (°c)
Compoun Roll 1 Roll 2 Roll 3 Roll 4
d
JIS- GT-159
S,G,SAR,
OR-220 85 ±5
Grade-M, GT-159 /
UIP,IR GT-163
OR-210 GN-625 80 ±5 70 ±5 8O ±5 80 ±5
HC-513 GTK-53 80 ±5 70 ±5 80 ±5 80 ±5
19,1 – 20,5 30 27 25 42
23,6 – 25,0 37 34 32 48
37,1 – 38,5 62 60 59 72
49,1 – 50,0 84 81 77 89
Departemen Conveyor
Pemasangan Label Kode jarak Jarak dan Toleransi (mm)
A 20 ±10
A B C D E F G
Departemen Conveyor
Finishing
Tujuan : untuk mendapatkan hasil produk ( conveyor belt,bucket elevator belt dan
scaling conveyor belt ) conveyor belt sesuai standar.
Spesifikasi Packing
2. Packing type B
Fungsi untuk pengiriman lokal dengan truk untuk semua size panjang 25-50 m
tebal : > 12 mm
lebar : semua kecuali permintaan khusus.
3. Packing type C
Fungsi untuk pengiriman conveyor, V – cleat dan lokal rough top dengan truk
dan kapal panjangnya > 50 - 100 m, kecuali permintaan khusus.
4. Packing type D
Fungsi untuk pengiriman conveyor, V - cleat dan rough top lokal dan ekspor
dengan truk/kapal laut, panjangnya > 100 m, kecuali permintaan khusus
Departemen Conveyor
Packing
5. Packing type E
Fungsi untuk pengiriman conveyor, v – cleat dan rough top lokal dan ekspor
dengan truk / kapal laut panjangnya > 100 mm berat : < 3500 kg kecuali
permintaan khusus
7. Packing type G
Fungsi untuk pengiriman endles belt lokal dengan truk
8. Packing type H
Fungsi untuk pengiriman endles belt ekspor
1 Terima S/O Print S/O Section Pembagian S/O merata P2: On-time Delivery
( 2-rui ) F/G (L&E)
Realese S/O S/O PPC Dari print S/O : P2: On time delivery
Lokal = 2 hari
Ekspor = 3 hari
Goods Receive Belt + KIBJ Packing Belt Sesuai KIBJ P2: On time delivery
Barang yang
Delivery dikirim Customer Barang sesuai P2: On time delivery
permintaan customer
dan surat jalan
Departemen Finish Good
Flow process
2 2 3 3 4