Class 4 To 10
Class 4 To 10
Construction Project
planning Tools
3/3/2020 1
Objectives of the session
After the session, you will be able to apply
project implementation tools like WBS,
Gantt chart, network techniques, CPM,
and PERT in a specific projects; and
analyses the project cost-time
relationships.
You will also be highlighted on the
resources, cost, quality issues, change, risk,
performance and communication plans.
3/3/2020 2
Roadmap to Project Success
Statement Work Responsibility Network Gantt Resource Budget
of Work Breakdown Matrix Plan
Form Purpose Structure
Project Project Background R A
A
Team Project Deliverables
S
S
R
TIME
Perform
Tasks
Conduct
Close-Out
LEADERSHIP
Meeting
COMMUNICATION Track
Progress
3/3/2020 3
Activity Scheduling
Activities Schedule is the backbone of every
project and is essential for a successful
outcome.
It gives all personnel involved in the project
common understanding of what is required,
how this will be achieved, when it will be
achieved and who will be responsible for the
successful outcome of each activity.
3/3/2020 4
Activity Scheduling Involves:
Application of Work Breakdown
Structure in order to subdivide the major
project deliverables into smaller, more
manageable component based on the
project scope.
Identification of the activities needed in
order to produce the project deliverables
and if necessary breaking down the
activities into more manageable tasks which
can then be assigned to individuals
3/3/2020 5
Determination of activities’ sequence (i.e.
in what order should related activities be
undertaken?) and dependencies (i.e. is the
activity dependent on the start up or
completion of any other activity?)-
Network
Estimation of activities/ tasks duration
Scheduling of activities by defining the start
up and completion dates of each
activity/task.
3/3/2020 6
Work Breakdown Structure (WBS)
It represents a systematic and logical
breakdown of the project into its component
parts.
It is constructed by dividing the project in to
its major parts, with each of these being
further divided in to sub parts.
This is continued till a breakdown is done in
terms of manageable units of work for
which responsibility can be defined.
3/3/2020 7
Thus, the work breakdown structure helps in:
Effective planning by dividing the work
in to manageable elements which can be
planned, budgeted and controlled.
Assignment of responsibility for work
elements to project personnel and
outside agencies.
Development of control and
information system.
3/3/2020 8
Ways of doing WBS
Hardware orientation [identification of
basic work packages]
Agency orientation [based on
assignment of responsibility to different
agencies]
Functional oriented [e.g. deign,
procurement, construction and
commissioning]
3/3/2020 9
Illustrative WBS for Construction Projects
3/3/2020 10
Tools of Implementation
Planning
Gantt or bar chart showing when
activities take place
Project network showing
activities, their dependencies and
their relation to the whole.
3/3/2020 11
Bar or Gantt Chart
An illus trativ e Bar Chart
Activities
Time in weeks from project start
10 20 30 40
Design
Purchase of
parts
Fabrication
Assembly
3/3/2020 12
A Gantt chart(tasks vs time) is a
graphical representation of the duration of
tasks against the progression of time.
A Gantt chart is a useful tool for planning,
scheduling and monitoring projects.
The advantages of the bar chart are:
It is simple to understand
It can be used to show progress
It can be used for manpower planning
3/3/2020 13
The disadvantages of the bar chart
are:
It cannot show interrelationship
among activities on large , complex
projects;
There may be a physical limit to the
size of the bar chart, which may limit
the size of the project; and
It cannot easily cope with frequent
changes or updating.
3/3/2020 14
Network Techniques
In this technique, the
activities,
events, and
their relationships are presented by a
network diagram, also called an arrow
diagram.
3/3/2020 15
Why Project Network?
It is a convenient way to show activities and
precedence in relation to the whole project.
It is a basis of project planning:
◦ Responsibility allocation
◦ Definition of subcontracting units
◦ Role of different players
It is the base for scheduling and establishment
of work time tables
3/3/2020 16
• Facilitate critical path determination for
management control
– deterministic Vs probabilistic activity times
• Facilitates resource planning for projects
– Project crashing with time cost trade offs
– Resource aggregation
– Resource leveling
– Limited resource allocation
• It can handle very large and complex projects
and it can be easily computerized and updated
3/3/2020 17
Uses for project implementation
Time table for implementation
Monitoring and reporting progress
updating of schedules and resources
Coordination of work with different agencies
3/3/2020 18
Drawbacks of network technique
Being more complicated than the
traditional bar chart it is not easily
understood by the project personnel,
and
It does not define an operational
schedule(working schedule) which
tells who does what and when.
3/3/2020 19
Summary of advantage and disadvantage of cpm
Benefits of the Critical Path Method
The following are a few benefits of the critical path method:
It shows the graphical view of the project.
It discovers and makes dependencies visible.
It helps in project planning, scheduling, and controlling.
It helps in contingency planning.
It shows the critical path, and identifies critical activities requiring special attention.
It helps you assign the float to activities and flexibility to float activities.
It shows you where you need to take action to bring project back on track.
Although the critical path is very useful tool in project planning, it also has some limitations and
drawbacks.
Limitations and drawbacks of the Critical Path Method
Because the critical path method is an optimal planning tool, it always assumes that all resources are
available for the project at all times.
It does not consider resource dependencies.
There are chances of misusing float or slack.
Less attention on non-critical activities, though sometimes they may also become critical activities.
Projects based on the critical path often fail to be completed within the approved time duration.
To overcome these shortcomings of the critical path, the critical chain method was developed. In the
critical chain method resource constraints are also taken into consideration while developing the
network diagram.
Visit: Critical Chain Method in Project Management
3/3/2020 20
CLASS 5
3/3/2020 21
Basic Network terminologies
An activity is a task or a job that
takes time and resources
It is represented in a network by an
arrow.
The arrow doesn’t have any relationship
with a scale.
Example: Excavate the land, Dig foundations,
Lay foundations, Build a wall, etc.
3/3/2020 22
In a network analysis, it is important
to establish:
The activities involved in the project,
Their logical relationship, ex.
Building a wall comes after laying the
foundation.
An estimate of the time that an
activity is going to take
3/3/2020 23
An event is a point in time and
indicates the start or finish of an activity
or activities, e.g. wall built, foundations
dug, etc.
An event is represented in a network by
a circle.
3/3/2020 25
Network: this is the combination of activities,
dummy activities and events in logical sequence
according to the rules of drawing networks.
Example:
3/3/2020 26
Rules for drawing networks:
A complete network should have one point of
entry – a start event, and one point of exit – a finish
event.
Each activity must have one preceding (tail) event
and one succeeding or head event. Many activities
may have the same tail event and many may have
the same head event.
No activity can start until its tail event is reached.
Activities should not cross each other.
Activity should not be in parallel i..e. Two activities
should have one common start and end event.
3/3/2020 27
An event is not complete until all
activities leading in to it are complete.
A series of activities which lead back to
the same event are not allowed.
All activities must be tied in to the
network; all must contribute to the
progress of the project, danglers are
not allowed.
3/3/2020 28
Activity Identification
Short description: example, Lay foundation,
erect frame, etc.
Alphabetic or numeric code: example, A, B,
C, etc., or 100, 101, 108 etc.
Using tail and head event numbers:
example, 1-2, 2-3, 3-4, 3-6, etc
3/3/2020 29
Example 1: Organizing a one day seminar
Generate the list of jobs to be done:
a) Decide date, budget , venue for seminar
b) Identify speakers, participants
c) Contact and finalize speakers
d) Print seminar brochure
e) Mail brochures to tentative participants
f) Estimate number of participants
g) Decide menu for lunch, tea and coffee
h) Arrange for catering
i) Arrange projection facilities at venue
j) Receive guests at registration
k) Conduct seminar as per brochure
l) See off guests
3/3/2020 30
Code Activity Predecessors
A Decide date, budget , venue for seminar -
B Identify speakers, participants -
C Contact and finalize speakers B
D Print seminar brochure A, C
E Mail brochures to tentative participants D
F Estimate number of participants E
G Decide menu for lunch, tea and coffee F
H Arrange for catering G
I Arrange projection facilities at venue F
J Receive guests at registration E
K Conduct seminar as per brochure H, I, J
L See off guests K
3/3/2020 31
Network of the one day
seminar on PM
10
L
9
K
J 8
A D E
1 5
3 4
I H
B F 6
2 C 7
G
3/3/2020 32
Example 2: Complex Construction
Project
A = Lay foundation
B = Erect framework
C = install millwork
D = install wiring
E = install plumbing
F = plaster walls
G = install siding
H = decorate the interior
I = finish the exterior
3/3/2020 33
The interrelationship among these
activities is as follows:
A should precede B
B should precede C, D, E, F, and G
C, D, E and F should precede H
G should precede I
3/3/2020 34
Network diagram of the project:
4
C
H
1 2 3
D
7 9
A B
E
F 5
I
G 6
8
3/3/2020 35
Activity Duration
Deterministic [as in CPM]
◦ When previous experience yields fairly
accurate estimates of activity duration, [e.g.,
construction activity, market surveys]
Probabilistic [as in PERT]
◦ when there is uncertainty in times, as for
instance in R & D activities, new activities being
carried out for the first time.
3/3/2020 36
Deterministic time estimate:
◦ A single time estimate is used for each activity.
This is taken from experts who have prior
knowledge and experience of the activity.
Probabilistic time estimate:
◦ Multiple time estimates -Three time
estimates [Optimistic, Most Likely and
Pessimistic] are commonly used for each
activity based on the consensus of the group.
O 4ML P
ExpectedTime
6
3/3/2020 37
Critical path
Is the longest path in the network
Lower bound on the project duration [the
shortest time in which the whole project
can be completed]
Selective control for management of the
project
Can be determined by:
◦ Enumeration of all paths in the network
◦ Event based computations [forward pass and
backward pass]
3/3/2020 38
There may be two critical paths and
the critical path can pass through a
dummy.
The Critical path is determined by
selecting the chain of activities
where their ESTs are equal to
their LSTs.
The other activities with differences in
their ESTs and LSTs are non-critical
activities.
3/3/2020 39
Earliest start time (EST): the earliest
possible time at which a succeeding activity start.
Calculating the EST is called the forward pass.
Start from event 0 and add the duration to get the earliest start time
of the subsequent activity
Where two activities arrive at an event, the largest route must be taken.
The EST of the exit event is the shortest time to finish a project.
Latest start times (LST): is the latest possible
time at which a preceding activity can finish
without increasing the project duration. Notes on
calculating LST (termed the backward pass)
Start at the finish (exit) event and insert the LST (the total project
duration) and work backward through the network deducting each
activity duration from the previously calculated LST.For this end event
EST is the LST.
The lowest number is taken as LST if the tails of two activities share
the same event. 3/3/2020 40
103
Example 1
3 3
B D
2 4
1 1 1 3 4 6 1 7 7 2 9 9
3/3/2020 42
Answer 3
M (3)
7
E (3) 8
N (4)
A (9) H (1)
1
L (2)
C (8)
G (6)
4 6
D (2)
B (3) F (2)
2
K (1)
J (4)
5
3/3/2020 43
Event EST (MAX) LST (MIN)
0 0 (START) 0 MIN(9-9=0; 18-3=15)
1 9 (0+9) 9 MIN(17-8=9; 22-3=19; 18-2=16)
2 11 max[(0+3);(9+2)] 18(22-4)
3 18 MAX(9+3=12 AND 17+1=18) 22 MIN(25-3=22; 23-0=23)
4 17(9+8) 17 MIN(22-1=20; 23-6=17; 22-2=20)
5 19 MAX(3+4=7AND 17+2=19) 22(23-1)
6 23 MAX(19+1=20, 17+6=23; 23(25-2)
18+1=19
7 25MAX(18+3=21; 23+2=25) 25(29-4)
8 29(25+4) 29(EST); Start from here i.e. the last or
end or exit event where LST =EST
A - 2
B - 3
C A 1
D A, B 4
E D 5
F D 8
G C, E 6
H C, E 4
I F, G, H 3
3/3/2020 45
Float: Float or spare time is associated with
non- critical activities. There are three types
of floats: total floats, free float and
independent float.
Total float is the amount of time a path of
activities could be delayed with out affecting the
overall project durations.
Total Float = Latest finish time – Earliest
Start time – Activity duration
or
=LST – EST =LFT - EFT
For example total float for activity C and E is 7-1-
4 = 2 days.
3/3/2020 46
Total Float or Float
Total float is the amount of time an
activity can be delayed without delaying
the project completion date. On a critical
path, the total float is zero.
Total float is often known as the slack.
You can calculate the total float by
subtracting the Early Start date of an
activity from its Late Start date (Late
Start date – Early Start date), or Early
Finish date from its Late Finish date (Late
Finish date – Early Finish date).
3/3/2020 47
FREE FLOAT
Free float is the amount of time an
activity can be delayed without delaying
the Early Start of its successor activity.
You can calculate the free float by
subtracting the Early Finish date of the
activity from the Early Start date of next
activity (ES of next Activity – EF of
current Activity).
Keep in mind that if two activities are
converging to a single activity, only one of
these two activities may have free float.
3/3/2020 48
Free float is the amount of time an
activity can be delayed without affecting
the commencement of a subsequent
activity at its earliest start time, but may
affect float of a previous activity.
Free float = (Latest finish time but without
affecting succeeding activity)-Earliest Start
Time – Activity Duration
For example free float for activity E is 7-
4-1 = 2 days
3/3/2020 49
Independent Float is the amount of time an
activity can be delayed when all preceding
activities are completed as late as possible and all
succeeding activities started as early as possible.
Independent float therefore does not affect the
float of either preceding or subsequent activities.
Independent Float= (Latest finish time
but without affecting succeeding activity)
- latest Start Time-activity Duration
=LFT -LST
Example, Independent float for activity E is 7-6-1
= 0 days.
3/3/2020 50
Activity Duration E S T L S T E F T L F T T F F F I F
A 1 0 0 1 1 - - -
B 2 1 1 3 3 - - -
C 3 1 3 4 6 2 - -
D 4 3 3 7 7 - - -
E 1 4 6 5 7 2 2 -
F 2 7 7 9 9 - - -
3/3/2020 51
Uncertain activity duration
[PERT]
Foreach activity in the project three
time estimates are obtained:
◦ Optimistic times, a
◦ Most likely time, m
◦ Pessimistic time, b
3/3/2020 52
PERT time estimates
• Mean of activity duration:
= (a + 4m + b)/6
• Variance of activity duration:
=( (b-a) /6 )2
• Standard deviation of activity
duration:
= sq. roots of variance = (b-a )/6
3/3/2020 53
Basic PERT Procedure
Compute mean and variance of all jobs
Conduct forward and backward pass on the
project network with expected times of all
activities
Identify the critical path
Obtain variance of critical path by adding
variance of activities.
Obtain the distribution of the project duration
3/3/2020 54
Make probability statements about the
project
◦ Chances of meeting the target date
◦ Probability of exceeding a given ceiling date
◦ Probability that the project duration is
confined to an interval of time.
◦ Z (standard normal deviate) = [X-
Q]/SD
◦ SD= Standard Deviation of Critical Path
◦ Q= critical path duration
◦ X= time by which the project is to be finished
3/3/2020 55
Multiple time estimate
1
3
C
A D F
0.5, 1, 1.5
2, 3.5, 4 5.6, 7, 15 3, 4.5, 5.4
2
0 4
E
B
5,6,8
4,5,6
3/3/2020 56
Activity Expected duration
a 4m b
ED
6
A 3.33
B 5.00
C 1.00
D 8.10
E 6.17
F 4.40
3/3/2020 57
To calculate the probability that the project
can be completed within 19 days:
Calculate the SD of each activity on the
critical path using the formula:
b a
6
64
– Activity B = 0.33
6
15 5.6
– Activity D = 6
1.57
3/3/2020 58
Find the combined standard deviation
of all activities on the critical path.
19 17.5
0.91
1.65
3/3/2020 59
Lookup this value in a table of areas
under the normal curve to find the
probability.
In
this case the probability of achieving
the scheduled date of week 19 is 82%.
3/3/2020 60
Exercise 2
Activity Predecessors Time estimates
a m b
A - 2 4 8
B - 4 6 10
C A 6 6 6
D A 2 8 14
E A 6 8 12
F B,C 9 3 15
G D,F 8 16 20
H D,F 4 4 4
I E, H 4 8 10
3/3/2020 62
Multiple Objectives
Project cost and time are undoubtedly the two
major objectives that project managers strive
to minimize and control
Project performance ( in terms of both
quantum and quality of work done)needs to be
monitored and controlled
There could be a number of attributes that
reflect project performance, time and cost.
3/3/2020 63
Conflicting objectives:
Meeting a certain contracted date
Minimizing the total project cost
◦ Direct activity cost
◦ Indirect activity cost
◦ Penalties for project delays
Ensuring that certain activities are not
crashed for quality reasons
Confining the expenses to a fixed budget
3/3/2020 64
With expenditure of additional resources it
is generally possible to accomplish the
activity in a shorter duration
The minimum possible duration of the
activity is its crash duration, when its cost
is the highest.
For technological reasons it is not possible
to shorten duration below the crash limit
even by spending more money or
resources.
3/3/2020 65
• project schedules influence both the direct
costs of activities and indirect costs associated
with the project.
• Activity direct costs:
– Costs associated with the performance of the
specific activity, such as:
• cost of planning and design
• raw materials procurement
• Labor costs
• Manufacturing or processing costs
• Travel, communication and transportation
• Consultation fees, etc
3/3/2020 66
Project indirect costs
Overhead costs such as:
◦ managerial services
◦ Indirect supplies
◦ Equipment rentals
◦ Allocation of fixed expenses
◦ Site office maintenance
Indirect costs increase with the duration of
the project
3/3/2020 67
Project cost comprises direct costs and
indirect project costs.
As we shorten project duration, direct
costs increase whereas indirect
costs decrease.
Therefore, there is optimal project
duration where the total project cost
becomes the minimum.
3/3/2020 68
Project direct cost- time relationship
3/3/2020 69
Cost slope: this is the average cost of
shortening an activity by one time unit.
CrashCost NormalCost
CostSlope
NormalTime CrashTime
3/3/2020 70
Heuristic solution procedure:
Start with the normal project duration
Obtain the critical paths
Choose that activity on the critical path
which is cheapest to crash
Crash that activity till either another path
becomes critical or the activity is fully
crashed
3/3/2020 71
Determine the most economical set of
activities to be crashed or relaxed to reduce
the durations all critical paths
No further crashing is possible when at least
one critical path can not be reduced
When two or more activities on any path are
simultaneously crashed, some previously
crashed activity on the path may be relaxed.
3/3/2020 72
Example: Given the information below, find the maximum length of the
schedule and the minimum cost schedule when the indirect cost is
Birr70 per day.
3/3/2020 73
2
4 13
C (2)
A (4) 4
F(3)
0 5
13 15
18 18
0 0 E (3)
B (8) 3 D (10)
8 8
3/3/2020 74
Step 1: The first is to determine the
normal costs and normal durations of the
project.
The critical paths are B and D
Normal project duration is 18 days
Direct Cost = Birr580
Indirect cost = 70X18= 1260
Total project cost = Birr1840
3/3/2020 75
Step 2: Reduce the least cost slope critical
activity B by two days
The critical paths B and D (Not
changed)
Project duration 16 days
Direct cost = normal cost + crush cost(50x2)
= 580+100 = 680
Indirect Cost = 70X16 = 1120
Total project cost = 1120 + 680 = 1800
3/3/2020 76
Step 3: Since we have fully used the crash time
for B, now we can crash activity D by two days
Two Critical paths: the first is B and D; and
the second is B, E and F.
Project duration 14 days
Direct cost = Cost of step 2 + crash cost =
680+60*2= 800
Indirect Cost = 70X14 = 980
Total project cost = 980 + 800 = 1780
3/3/2020 77
Step 4: Three crashing days remain from activity D.
We select one either E or F with the least cost
slope to crash it together with activity D. Therefore
we can crash critical activity D and F by two days:
Two Critical paths: the first is B and D; and the second is
B, E and F.
Project duration is 12 days
Direct cost = Cost of step 3 + crash cost (crash cost of
D + Crash cost of F) = 800 + (60+10)*2 days = 940
Indirect Cost = 70X12 = 840
Total project cost = 940 + 840 = 1780
3/3/2020 78
Step 5: We can further crash by one more day
activity D and E but not activity F
Two Critical paths. The first is B and D; and
the second is B, E and F.
Project duration is 11 days
Direct cost = Cost of step 4 + crash cost
(crash cost of D + Crash cost of E) = 940
+ (60+25)*1 days = Birr1025
Indirect Cost = 70X11 = 770
Total project cost = 1025+ 770 = 1795
3/3/2020 79
Conclusion: Note that the total
project cost starts to increase at
step 5 when compared to step 4.
Then the optimal solution for this
project is the values of step 6 as
follows.
Project duration = 12 days;Total
project cost = 1780
3/3/2020 80
The activities and time estimate ( in weeks) for various
activities are illustrated below:
Activity Preceding Time Estimates
Activity Optimistic Most likely Pessimistic
A - 1 2 3
B - 8 10 12
C A 2 4 6
D B 1 2 3
E C,B 6 8 10
F D 4 3 8
Draw the network diagram?
Determine the critical path
Calculate EST, LST, EFT and LFT of the activities on the critical
path?
Determine the average estimated duration of the project?
What is the probability of finishing the project with in 20 weeks?
3/3/2020 81
Given the following list of activities , precedence
relationships, normal and crash time and cost of a project,
when the indirect cost is birr 120 per day,
Activity Preceding Time Cost
activity Normal Crash Normal Crash
A _ 6 4 500 620
B _ 4 2 300 390
C A 7 6 650 680
D A 3 2 400 450
E B,C 5 3 850 1000
3/3/2020 82
Assume the following project data given in Table
below. It is required to crash the project duration
from its original duration to a final duration of 110
days. Assume daily indirect cost of Birr100.
3/3/2020 83
Development of Resource Plan
• The resource plan identifies the physical
resources that are needed to complete the
project successfully.
• Obviously, in order to develop a resource
plan, every activity and task should have
been identified.
• It should be performed in parallel with the
development of the activities schedule, since
the determination of the resource
requirements affects directly the estimation
of the activities/ tasks duration.
3/3/2020 84
In order to develop the Resource Plan, the
following steps should be followed:
3/3/2020 85
For simple projects the development of a
Resource Plan may be limited to entering only
the resource name against the project activity
on the Activities Schedule.
However, for larger and more complex
projects, a detailed resource plan should be
completed to ensure that the resource
allocation is both accurate and appropriate.
3/3/2020 86
Once the Work Breakdown Structure (WBS)
has been applied and the project activities
have been identified, you are ready to identify
the types (labor, equipment, material) and
quantities of the resources needed to
implement the project.
3/3/2020 87
Labor (or Human Resources): It is not
necessary at this stage of the project to be
identified by name, but the professional
qualifications and the type of skills required for
carrying out an activity/ task, the employment
condition[full time, part time, etc] should be
identified.
3/3/2020 88
Equipment: You have to list the equipment that
will be used for the performance of works (e.g.
excavators, cranes), the delivery of services or
supplies (e.g. classrooms for the conduction of
training seminars, lorries for carrying supplies
and warehouses for storing supplies), as well
as for carrying out supportive actions like
project and procurement management (e.g.
computers, software packages, photocopiers).
3/3/2020 89
Material: You have to list the material that
will be used for the production of the
deliverables. For example in case of a
building construction project, materials like
bricks, cement, steel, cables, paints will be
used. Or in case of a training delivery
project, materials like paper for printing the
training material and blank CDs for
distributing the training material to
participants will be used.
3/3/2020 90
Development of Resource Schedule
In order to achieve this you should look at the
starting and finishing dates of the activities and tasks
in which each of the resources will be used, since at
the end of the day the most important thing is to
achieve effective and on time completion of all
planned activities and tasks. For example, in a building
construction project where you will need the
architect for the elaboration of the architectural
study, you have to advise the Activities Schedule for
finding out when and for how long this task will take
place, in order to estimate the corresponding period
that the architect will need to be engaged in the
project. 3/3/2020 91
For the same project the building equipment &
material will mainly be used in the construction
stage, so you have to schedule them according
to when that stage will take place. Undoubtly,
there are resources that will be used in more
than one phases of the project or in more than
one activities/tasks, like for example the Quality
Manager, who is responsible for managing and
assuring quality in all the phases of the project.
In these cases you should estimate the whole
duration for which the resource will be
engaged.
3/3/2020 92
Assignment of resources
3/3/2020 93
• Cost of resources. Apart from being
effective in terms of schedule, the Resource
Plan should also be effective in terms of cost,
since the cost of the resources has usually a
great contribution to the overall cost of the
project.
3/3/2020 94
• Capability of resources. The more familiar you
are with resource capabilities, the more efficiently
and effectively you can assign resources to tasks.
Concerning the human resources you need to
understand their background, experience, skills and
capabilities. Concerning the equipment you have to
be familiar with their operation, performance and
maintenance. As far as materials are concerned you
need to know their quality characteristics, their
suitability for purpose and the rate of
consumption.
3/3/2020 95
Development of Cost Plan
The Cost Plan includes an estimate and a
schedule of the costs that will be incurred in
order to complete the project activities and
tasks.
The Cost Plan is usually prepared after the
development of the Activities Schedule and the
Resource Plan, since it requires input from
both of them.
3/3/2020 96
Based on the information now known about
the project as a result of Project Planning
activities (i.e. more detail and greater accuracy
regarding project activities, tasks and
durations, a more detailed understanding of
the resources required to perform the work
and their associated costs), the Project
Manager can refine the budget required to
complete the project.
3/3/2020 97
This is particularly important when a project
or some of its components are planned to be
performed under contract (i.e. through a
tendering process), since in this case the value
of the contract should be accurately estimated
in order to be included in the relative tender
documents.
3/3/2020 98
In order to develop the Cost Plan, the
following steps should be followed:
3/3/2020 99
For simple projects the development of a cost
plan may be limited to entering only the overall
cost against the project activity on the activities
schedule.
However, for larger and more complex
projects, A detailed cost plan should be
completed to ensure that the overall
expenditure is both accurate and appropriate.
3/3/2020 100
Identification and estimation of costs
• The identification of the various costs is closely
related to the resource requirements of the
project, since the greatest percentage of the
project’s overall cost consists of the costs of the
resources needed to complete the project
activities.
• When developing a cost plan, apart from the
costs of all resources that will be charged to the
project, you should also take into account travel
costs, administrative costs and contingency costs.
3/3/2020 101
• More specifically, the basic types of costs,
which are usually incurred in a project, are the
following:
• Costs of resources: This type of costs
include the following subcategories:
• Labor costs: include salaries, wages or any other kind of
remuneration provided to people who are assigned to
perform one or more activities of the project.
• Equipment costs: associated with the purchasing,
renting or leasing of equipment, as well as with the
operation/ using and maintenance of the equipment
(operating costs).
• Materials costs: costs associated with the purchasing or
usage of materials.
3/3/2020 102
Travel costs: costs associated with any
travelling that may be required in the scope of
the project. They include transportation costs
(e.g. flight tickets, taxi fees, car fuel, parking
fees, etc), accommodation costs (e.g. hotel
rooms, apartments, etc.) and any daily
allowances (e.g. lunch/ dinner, entertainment).
3/3/2020 103
Administrative costs or overheads: costs
associated with the performance of
administration and coordination activities.
Examples of such costs are: office supplies (e.g.
printing paper, envelopes, labels, etc.), postage
or delivery costs, costs for utilities (e.g.
electricity, water, telecommunication), clerical
and administrative salaries and wages, legal and
insurance fees, memberships in technical and
professional organizations.
3/3/2020 104
Contingency costs: costs which are known
to be regularly encountered but difficult or
impossible to estimate at the time the plan is
prepared. These costs may result from
incomplete design, unforeseen and
unpredictable conditions, risks or uncertainties
within the defined project scope. The reason
that they are included in the Cost Plan is to
reduce the risk of budget overrun. Contingency
costs may be either built into the above costs
or listed as a separate category.
3/3/2020 105
Cost Schedule
• After you have estimated all costs, you
have to estimate when these costs are
expected to be incurred during the
project implementation period and
develop the Cost Schedule.
• In order to determine when the resource
costs will be incurred you should look at the
Resource Schedule to find out when each
resource is planned to be used.
3/3/2020 106
Usually, there are three available options for
determining when the costs will accrue.You
can either select a cost to accrue at the start
of a task or at the end of a task or you can
select the prorated method according to
which the cost is distributed over the task’s
duration and the cost accrual is based on the
completion percentage of a task. It should be
noted that per-use costs always accrue at the
start of a task.
3/3/2020 107
The above graph represents the cumulative project costs
in the time. In order to prepare this graph you need to
create an intermediate table that will sum, for each time
period of your schedule (week or month), the planned
costs, and calculate the cumulative cost for each period
(week or month).
3/3/2020 108
Estimation of cost per activity/ task
3/3/2020 109
• If the total cost does not meet your
budget, you may need to examine each
individual task's costs and each resource's task
assignments to see where costs can be
reduced. As a result of this process you may
come up with revised Resource and Cost
Schedules or even with a revised Activities
Schedule, since time, costs and resources are
interrelated. This means that applying changes
to one of them will cause respective changes
to the others.
3/3/2020 110
Development of Quality Plan
The success of a project is typically measured
in terms of the achievement of “time, cost and
quality” targets. As “time and cost” targets are
addressed in the Activities Schedule and Cost
Plans respectively, you need now to develop
the Quality Plan which means to outline the
“quality” targets and identify the methods that
will be used to assure that the quality targets
will be achieved for this project.
3/3/2020 111
To create a Quality Plan the following
steps should be undertaken:
3/3/2020 112
The quality plan is being developed by the
project manager or the quality manager,
depending on whether the quality assurance
and control responsibilities will be delegated
to a third party.
3/3/2020 113
Definition of quality criteria
3/3/2020 114
• Stating the functional requirements of a
product/infrastructure or by defining and if
possible quantifying the characteristics that
the product/ service/ infrastructure should
possess in terms of: Performance, Accuracy,
Practicability, Compatibility, Reliability,
Maintainability, Expandability, Clarity, etc.
3/3/2020 115
Considering and adopting any standards that
are specific to the product/ service or
infrastructure provided by the project.
Industry wide standards exist for many
products and services, e.g. for construction,
for automotive, for health and safety as well as
for aerospace, building code software,
electrical/ electronics, government/ military,
medical, petrochemicals, quality,
telecommunications, welding & metals, etc.
3/3/2020 116
Establishment of quality assurance and
control processes and techniques
3/3/2020 119
Issues that remain unresolved are likely
to become major problems resulting in
the need for initiating a change control
process.
It is therefore, very important to have an
issue escalation and management process
in place, and to execute this process
before change control procedures
become necessary.
3/3/2020 120
During the planning phase, the project
manager has to develop the issue management
plan which will be used from this point till the
end of the project to ensure that every issue
is formally resolved.
The Issue Management Plan describes how project
issues will be: captured, communicated, documented,
prioritized, escalated, reviewed and finally resolved by
defining the issue management process to be
followed, the documentation to be used, as well as
the roles and responsibilities of all human resources
involved in the process.
3/3/2020 121
Development of Change Management Plan
• Project change can be generally defined
as any adjustment or modification to the
formally documented aspects of the
project, such as cost, scope, schedule or
resources.
• Although a change may occur throughout
every project phase, the need for change
is usually discovered during project
execution phase, as actual work on
activities/ tasks is being performed.
3/3/2020 122
It is during execution phase that the
organization may discover that his original
effort estimates were not accurate and will
result in more effort being required to
complete its work.
In order to handle any need for change that
may arise throughout every project phase
without negative effect on the project
outcome, an effective change management
plan should be developed during the
project planning phase.
3/3/2020 123
Development of Risk Plan
• During the planning phase, the project manager
must review the list of risks initially identified
for the project to determine if all these risks
remain applicable.
• In addition he must identify new risk variables
that may have been introduced due to
analytical planning of the project, provide a set
of actions to be taken to both prevent the risk
for occurring and reduce the impact of the risk
in case that it eventuates.
3/3/2020 124
Furthermore, the project manager must define
the risk management process which will be
used from this point until the end of the
project to ensure that every risk is formally
identified, quantified, monitored , avoided,
transferred or mitigated.
3/3/2020 125
• As it has been stated above, the project
manager must review all the risks identified
during the project initiation phase in order to
identify if all of them remain applicable.
• Since project planning phase has already
started and project manager is participating in
activities scheduling, in resource, cost and
quality planning, he/she should be considerably
more knowledgeable about the project and
therefore more able to predict possible risks.
3/3/2020 126
Setting up Performance Indicators
• To be able to monitor a project’s
implementation and judge its performance
against the objectives and targets set, it is
necessary to use a set of indicators, which
might be decided during the planning phase, so
that data on them can be collected. Indicators
are usually quantitative measures but may also
be qualitative observations.
• They define how performance will be
measured along a specific scale, without
specifying a particular level of achievement.
3/3/2020 127
The various levels of indicators are as
follows:
• Financial indicators are used to monitor
progress in terms of the commitment and
payment of the funds available for the
project in relation to its cost.
• Output indicators relate to activity.
They are measured in physical units (e.g.
Length of road constructed)
3/3/2020 128
Result indicators relate to the direct
and immediate effect brought about
by a project. They provide information on
changes to, for example, the behavior,
capacity or performance of direct
beneficiaries.
Such indicators can be of a physical nature
(reduction of journey times, number of
successful trainees, number of road
accidents etc) or of a financial nature (e.g.
decrease in transportation cost)
3/3/2020 129
• Impact indicators refer to the consequences
of the project beyond the immediate effects
on its direct beneficiaries (effects occurring
after a certain lapse of time but which are
nonetheless directly linked to the action
taken).
• Financial and output indicators can be used
to monitor the progress of a project while
the result and impact indicators can be used
to evaluate the project’s outcome at the
post – project period.
3/3/2020 130
Using the indicators defined above, one can
also measure concepts such as effectiveness
and efficiency.
• Effectiveness compares what has been done
with what was originally planned i.e. it
compares actual with expected or estimated
outputs, results and/or impacts
• Efficiency looks at the ratio between the
outputs, results and/or impacts and the
inputs (particularly financial resources) used to
achieve them.
3/3/2020 131
In order to plan the use of performance
indicators both for monitoring the progress of
the project and for evaluating it, the Project
Manager has to follow the following steps:
Establishment of the Performance Indicators
Establishing the process for monitoring the
performance indicators.
3/3/2020 132
Establishing the Performance Indicators
Normally, the indicators selected must have the
following characteristics:
They must be relevant to the basic objectives
of the project
They must be few and meaningful
The data required to compile the indicators
must be easily available and obtained in a
timely way and at a reasonable cost
3/3/2020 133
To the extent possible, performance indicators
should allow the quantitative measurement of
progress, result or impact. However, for some
project objectives (for instance capacity
building) it may be necessary to develop
qualitative indicators to measure success,
which should still allow credible monitoring.
3/3/2020 134
Monitoring the Performance Indicators
3/3/2020 136
Next, the project manager should define how
the data collected should be processed,
initially interpreted and then presented to the
project steering committee, the funding
agency and to other stakeholders.
In case that the impact analysis is too
complicated, assistance from outside experts
should be asked.
3/3/2020 137
Development of Communication Plan
• Project communication is the exchange of
project specific information.
• Effective communication with all stakeholders
is absolutely fundamental to project success
and therefore it is necessary to plan it during
the project planning phase.
• Communication Planning is the process for
the determination of information and
communication needs of the stakeholders
relative to the progress of the project.
3/3/2020 138
It aims to give answers to the following
questions:
◦ Who needs what information?
◦ When do they need the information?
◦ Who delivers the information?
◦ How should the information be delivered?
3/3/2020 139
Steps of developing communication plan
3/3/2020 140
3/3/2020 141
Stakeholders Communication needs
3/3/2020 142
3/3/2020 143
Thank You!!
3/3/2020 144