Presentation On Loktak Downstream DT 20.01.2020
Presentation On Loktak Downstream DT 20.01.2020
to 50th meeting of
BOARD OF DIRECTORS
(LOKTAK DOWNSTREAM HYDROELECTRIC CORPORATOIN LIMITED)
1
LOKTAK DOWNSTREAM CORPORATION LIMITED.
2
BUSINESS OF THE COMPANY
To Plan, Promote and organise an integrated and efficient
development of power in all its aspects through Hydroelectric
in the State of Manipur.
Include Planning, Investigation, Consultancy services,
Research, design and preparation of feasibility and DPRs
Construction, generation, operation & maintenance of
Power Stations/ Projects and transmission lines.
Distribution, trading and sale of power etc.
3
PROJECTS LOOKED AFTER BY LDHC LTD
4
STATUS OF OTHER PROJECTS
LOKCHAO Small HEP (5 MW)
– 5 MW project in Chandel Dist. on Lokchao River
– Final DPR submitted to MANIREDA on 30.03.2019
– Proj Cost 77.92 Cr.
– FY tariff 5.73, LT 4.63 (before MNRE grant)
IRANG Small HEP(3 MW)
– 3 MW project in Senapati Dist. on Irang River
– Final DPR submitted to MANIREDA on 30.03.2019
– Proj Cost 26.56 Cr.
– FY tariff Rs. 2.49, LT Rs. 2.35 (before MNRE grant)
5
STATUS - cont…..
THOUBAL HE SCHEME (3x2.5 MW)
• Multipurpose Project on Thoubal river for Irrigation, Water
supply and Hydroelectricity
- Located 35 Kms from Imphal in Phayang Village, Ukhrul dist.
- Initial execution by Manipur Govt.
- Earthen Dam is complete and other Civil works partially
complete
• Implementation Agreement signed with LDHCL on 10th Nov.
2014 for execution of Electrical & Hydromechnical components
of the Project.
• Considering expertise of NHPC, BoD LDHCL on 27.07.2017 to
get the work done through NHPC Ltd.
6
STATUS OF OTHER PROJECTS
9
STATUS OF CLEARANCES OF LDHE PROJECT
Environment Clearance: Letter No. J-21011/17/2007-IA-I dated 16.01.2013
1
10
STATUS OF PROJECT
Chief Secretary (Power), Govt. of Manipur vide letter No.3/9/2011-Power dated
30th May, 2017 requested NHPC to explore all possible options to bring down the
tariff of Loktak D/d HE Project considering support extended by Govt of Manipur
to make the project viable.
NHPC worked out on tariff and again wrote on 16.02.2018 to Chief Secretary,
Govt. of Manipur with a copy to Sh. S. S. Rawat, Under Secretary to GOI, MOP to
expedite the finalization & signing of PPA.
Draft PIB submitted to MoP dt 06.09.2018
Meanwhile, a meeting was convened by Secretary (Power) Govt. Of India on dated
17.07.2019, wherein the issue was further discussed and NHPC was requested to
explore available option to lower the tariff.
The revised tariff was again worked out and the same was conveyed to Chief
Secretary, Government of Manipur, vide letter NH/LDHC/C/FBD/2019/11/20
dated 30.07.2019
Meeting held with Power Minister(GoM) on 6th Nov. wherein tariff model
proposed by LDHCL was agreed in principal and assurance was given for early
Cabinet clearance by Manipur Govt.
11
OPTIMISATION OF TARIFF
In order to optimize the tariff various options have been explored
considering following recent policy initiative from Government and
possible relaxation in CERC norms :-
Equity has been considered as upfront to reduce IDC
Interest rate of 9.5% on Domestic Loan
Return of Equity 14%(as per MoU) against 15.5%(permitted as per
CERC).
O&M charges 3% against 5% allowed as per CERC.
Life of the Project as 40 years as per CERC norms(2019-24).
90% depreciation considered in following manner.
3.5% for first 20 years and balance equally distributed in the
remaining 20 years.
12
ABSTRACT OF PROJECT COST (Sept 19 PL)
OPTION-II(BASE + OPTION-III(BASE +
S.N
Description OPTION-II(BASE) WAIVER OF 50% WAIVER OF 100% SGST)
o.
SGST)
13
Support from State Govt.
Support/Exemptions from State Government
Grant of Rs 400 crore
Foregoing 12% free power entiteled to the home
state
Contribution Rs 214.77 Cr. towards cost of land, R-
Communication, Security and etc.
a further 50% exemption in SGST (as recently agreed
by some states)
NOC for revalidation of TEC
14
Finance - Status
Particulars Amount
Authorised Share Capital 230 Crore
NHPC’s Share Capital Money Pending Allotment Nil
Manipur Govt.’S Share Capital Money Pending
Nil
Allotment
Date Of Issue Of Share Certificates During the Nil
Quarter
Opening Equity Capital (Paid-up) for the Quarter Rs.123.39 Crore
No. of Shares for the Quarter 12,33,92,309 Nos.
Additions during the Quarter Nil
Adjustments/Deletions during the Quarter Nil
Closing Equity Capital (Paid-up) Rs.123.39 Crore
Other Equity (Surplus) Rs.19.86 Crore
TOTAL Equity Rs 143.25 Crores
15
Finance - Status
Promoters Equity Subscription Share %
Amount
NHPC 90.29 Cr. 73.17%
GOVT. OF MANIPUR 33.10 Cr. 26.83%
LIABILITY
PAYABLE TO NHPC CONSULTANCY Rs 2.20
INTER UNIT TRANSECTION Rs 0.70
RENT Rs 0.53
TOTAL Rs 3.43
OTHER LIAILITY Rs 0.37
G TOTAL Rs 3.80 16
BREAK UP EXPENDITURE (in Crores)
EMPLOYEES EXP Rs 78
OTHER ADMN Rs 31
SURVEY & INVESTIGATION Rs 15
COMPENSATORY AFFORESTATION(FOREST CLEARANCE Stage-II) Rs 16
OTHER CAPITAL EXP Rs 4.50
Grand Total Rs 144.50
17
STAFF POSITION
18
THANK YOU
19
THANK YOU
20
ABSTRACT OF PROJECT COST
Amount
Amount
(Rs. in crore)
S.No. Description (Rs. in crore)
Sept 2019 PL
Feb 2015PL
* Total project cost at Sept 2019 PL considering life of project 40 years, 90% depreciation, O&M charges @ 3 %21
,escalation on O&M 3.0%, equity upfront, debt: equity::70:30, 400 cr grant from GoM