This document provides details for calculating the IBS score for a construction drawing of an IBS building. It includes the construction area, structural system components, wall system, and other simplified construction solutions. The IBS score is then calculated based on these details in three parts: Part 1 scores the structural system and achieves 42.8 points, Part 2 scores the wall system and achieves 20 points, and Part 3 scores other simplified solutions and achieves 22 points. The total IBS content score for the project is 84.8 points.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
249 views7 pages

IBS SCORING BCT504 - Sharifah - Ainie - Aidil - Zamirul

This document provides details for calculating the IBS score for a construction drawing of an IBS building. It includes the construction area, structural system components, wall system, and other simplified construction solutions. The IBS score is then calculated based on these details in three parts: Part 1 scores the structural system and achieves 42.8 points, Part 2 scores the wall system and achieves 20 points, and Part 3 scores other simplified solutions and achieves 22 points. The total IBS content score for the project is 84.8 points.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 7

Demonstrate teamwork skills in performing the IBS scoring system related to the construction drawing of the IBS building

BCT 504 – IBS SCORE ASSIGMENT

PREPARED BY:

1) Mohd Zamirul Bin Mohd Zuki (2020982985)


2) Aidil Hakeem Bin Azizan (2020995227)
3) Sharifah Nur Atiqah Binti Syed Muzzafar Shah (2020963365)
4) Nur Ainie Izatie Binti Nonazahar (2020963403)
PREPARATION OF MATERIALS
1. Construction Area
i. Construction Area 1st Floor : 264.6
ii. Construction Water Tank Area : 264.6
Total Construction Area : 529.2
2. Structural System
i. Beams : Precast concrete beam
ii. Column : Precast concrete column and concrete in-situ column
iii. Floor Slab Formwork : Precast half-slab and concrete in-situ slab
iv. Roof Trusses : Using prefab metal roof truss
3. Wall System
i. Internal Wall : Precast Concrete Panel
ii. External Wall : Precast Concrete Panel
4. Other Simplified Construction Solutions
i. Beams : 100% comply with MS 1064 Part 10:2001
ii. Columns : 86.67% comply with MS 1064 Part 10:2001
iii. Wall and Slab : 100% comply with MS 1064 Part 4:2001
iv. Doors : 80% comply with MS 1064 Part 4:2001
v. Windows : 80% comply with MS 1064 Part 5:2001
vi. Horizontal Repetition of Structure : 50%
   1st Floor, Area of Precast columns & beams + precast half slab
= 264.6m2 = = 264.6/869.18 = 0.3
Total Construction Area, Qst = 869.18m 2
Water Tank, Area of Precast columns & in-situ beams + no slab
= 230.76m2 = = 230.76/869.18 = 0.27
Water Tank, Area of Precast columns & in-situ beams + in-situ conc reusable fwk
= 24.82m2 = = 24.82/869.18= 0.03
Lower Roof Area, Prefabricated metal roof trusses
= 227m2 = = 227/869.18= 0.26

IBS SCORE – Upper Roof Area, Precast Columns & Beams + No Slabs

PART 1:
= 71m2 = = 71/869.18 = 0.08
Upper Roof Area, Precast Beam & In-Situ Column with Reusable Fwk + No Slabs

STRUCTURAL
= 50m2 = = 50/869.18 = 0.06

SYSTEM 50
NO ELEMENTS AREA/LENGTH IBS COVERAGE IBS SCORE
FACTOR
  PART 1: STRUCTURE        
ELEMENT
  1ST FLOOR        
  Precast columns & beams + 264.6m2 1.0 0.3 50 x 1.0 x 0.3 = 15
precast half slab
  WATER TANK AREA        
  Precast columns & in-situ 230.76m2 0.6 0.27 50 x 0.6 x 0.27 = 8.1
beams + no slab
  Precast columns & in-situ 24.82m2 0.6 0.03 50 x 0.6 x 0.03 = 0.9
beams + in-situ concrete
reusable formwork
  LOWER ROOF AREA        
  Prefabricated metal roof 227m2 1.0 0.26 50 x 1.0 x 0.26 = 13
trusses
  UPPER ROOF AREA        
  Precast Columns & Beams + 71m2 1.0 0.08 50 x 1.0 x 0.08 = 4
No Slabs
  Precast Beam & In-Situ 50m2 0.6 0.06 50 x 0.6 x 0.06 = 1.8
Column with Reusable Fwk +
No Slabs
  TOTAL PART 1 869.18m2   1.00 42.8
 
 1st Floor, Area of External wall using precast concrete panel
Total Construction Area, Qst = 552m = 72m = = 72/552 = 0.13
1st Floor, Area of Internal wall using precast concrete panel
= 284m = = 284/552 = 0.51
Water Tank, Area of External wall using precast concrete panel
= 72m = = 72/552 = 0.13
Water Tank, Area of Internal wall using precast concrete panel
= 24m2 = = 24/552 = 0.04

IBS SCORE –
Lower Roof Area, Area of External wall using precast concrete panel
= 36m2 = = 36/552 = 0.07

PART 2: WALL Upper Roof Area, Area of External wall using precast concrete panel
= 64m2 = = 64/552 = 0.12

SYSTEM 20
NO ELEMENTS AREA/LENGTH IBS COVERAGE IBS SCORE
FACTOR
  PART 2: WALL SYSTEM        
  1ST FLOOR        
  External wall using precast 72m 1.0 0.13 20 x 1.0 x 0.13 = 2.6
concrete panel
  Internal wall using precast 284m 1.0 0.51 20 x 1.0 x 0.51 = 10.2
concrete panel
  WATER TANK AREA        
  External wall using precast 72m 1.0 0.13 20 x 1.0 x 0.13 = 2.6
concrete panel
  Internal wall using precast 24m2 1.0 0.04 20 x 1.0 x 0.04 = 0.8
concrete panel
  LOWER ROOF AREA        
  External wall using precast 36m2 1.0 0.07 20 x 1.0 x 0.07 = 1.4
concrete panel
  UPPER ROOF AREA        
  External wall using precast 64m2 1.0 0.12 20 x 1.0 x 0.12 = 2.4
concrete panel
  TOTAL PART 2 867m2   1.00 20
NO ELEMENTS AREA/LENGTH IBS FACTOR COVERAGE IBS SCORE
  PART 3: OTHET SIMPLIFIED        
CONSTRUCTION SOLUTION
  100% of beam sizes follow MS 1064     100% 4
Part 10:2001
  86.67% of column sizes follow     86.67% 4
MS:1064 Part 10:2001
  100% wall and slab sizes follow MS     100% 4
1064 Part 4:2001
  80% door sizes follow MS 1064 Part     80% 4
4:2001
  80% window sizes follow MS 1064 Part     80% 4
4:2001
  Horizontal Repetition of     50% 2
Structure=50%
  TOTAL PART 3       22
IBS CONTENTS SCORE OF PROJECT (PART 1 + PART 2 + PART 3) 84.8