DSWD FO-CAR Accomplishment Report On Disaster Response 2019

The document outlines the objectives and activities of disaster response agencies in the Cordillera Administrative Region of the Philippines. The objectives are to minimize casualties, provide timely assistance, and ensure coordination between partner agencies during emergencies. The document summarizes disaster response activities conducted from 2019-2020, including search and rescue operations, forced evacuations, security deployments, and distribution of relief goods to affected areas by response agencies like the Office of Civil Defense, Police Regional Office, and Bureau of Fire Protection.

Uploaded by

RJay Jacaban
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
124 views57 pages

DSWD FO-CAR Accomplishment Report On Disaster Response 2019

The document outlines the objectives and activities of disaster response agencies in the Cordillera Administrative Region of the Philippines. The objectives are to minimize casualties, provide timely assistance, and ensure coordination between partner agencies during emergencies. The document summarizes disaster response activities conducted from 2019-2020, including search and rescue operations, forced evacuations, security deployments, and distribution of relief goods to affected areas by response agencies like the Office of Civil Defense, Police Regional Office, and Bureau of Fire Protection.

Uploaded by

RJay Jacaban
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 57

DISASTER RESPONSE

To preserve life and


property by providing
timely, effective, well
coordinated response to
emergencies,
disasters/calamities.
OBJECTIVES
1. Implement the principle of zero casualty and prevent further
damage to properties, life lines and the environment.
2. To provide timely effective and gender-sensitive assistance to
individuals, families, and communities in affected areas.
3. To ensure coordination with partner agencies in times of
emergencies, disasters and calamities.
4. To organize a systematic and strategic approach in disaster
response.

DISASTER RESPONSE
OUTCOME 1: Principle of zero-casualty
implemented
LEAD AGENCIES

OCD-CAR CORDILLERA RDRRMC PROCor


Office of Civil Defense
Cordillera Administrative Region

40 Disaster Management Operations


303 Days of Alert Activation
SUCCESSFULLY MANAGED

97 Cordillera RDRRMC Memo


8 Cordillera RDRRMC Resolutions
48 Public Advisories
DISSEMINATED
Office of Civil Defense
Cordillera Administrative Region

40 PDRA and Emergency Meetings


CONDUCTED

23 Public Advisories
602 Weather Advisories
186 Severe Weather Bulletin
DISSEMINATED
Office of Civil Defense
Cordillera Administrative Region

TIMELY and EFFECTIVE


Provision of Logistical Support to
Cordillera RDRRMC Member Agencies
and Volunteers
Police Regional Office
Cordillera Administrative Region

UNIT SAR FORCED SECURITY WCPD DISTRIBUTION REPACKING LOADING/ PNP


OPERATIONS EVACUATION DEPLOYMENT DEPLOYMENT OF RELIEF OF RELIEF UNLOADING PERSONNEL
CONDUCTED GOODS GOODS OF RELIEF DEPLOYED AT
GOODS EOC

ABRA 8 65 8 7 21 28 2,446 59

APAYAO 21 713 59 12 70 69 4,631 31


BCPO 5 0 7 9 0 0 0 0

BENGUET 10 28 18 6 1 0 293 23
IFUGAO 18 89 0 0 2 13 94 17

KALINGA 17 48 62 9 4 39 1,097 64
MT 3 0 29 4 7 0 66 27
PROVINCE
RMFB15 0 0 0 0 3 40 3,560 0

TOTAL  82  943  183 47  108   189  12,187 221 


Police Regional Office
Cordillera Administrative Region

DOCUMENTATION OF ACTIVITIES

Rescue Operations conducted in the Province of Abra


Police Regional Office
Cordillera Administrative Region

DOCUMENTATION OF ACTIVITIES

Pre-emptive Evacuation conducted in the Province of


Apayao
Police Regional Office
Cordillera Administrative Region

DOCUMENTATION OF ACTIVITIES

Road Clearing Operations conducted in the Province of


Benguet
Police Regional Office
Cordillera Administrative Region

DOCUMENTATION OF ACTIVITIES

Relief Distribution and Rescue Operation conducted in the


Province of Ifugao
Police Regional Office
Cordillera Administrative Region

DOCUMENTATION OF ACTIVITIES

Relief Distribution conducted in the Province of Kalinga


Bureau of Fire Protection
Cordillera Administrative Region

Monitoring of Fire Incidents


KINDS OCCUPANCY January to December 2019
Residential 142
Industrial/Factory 2
Commercial/Mercantile 17
STRUCTURAL FIRE

Storage 15
Mixed 3
Business/Gov’t Offices 3
Educational 8
Institutional 0
Health Care 0
Place of Assembly 0
Miscellaneous 12
SUB-TOTAL 202
Bureau of Fire Protection
Cordillera Administrative Region

Monitoring of Fire Incidents


Grass, Rubbish and Forest Fire 258
Motor Vehicle 9
Ship/Water Vessel 0
NON STRUCTURAL FIRE

Aircraft 0
Locomotive 0

SUB-TOTAL 7
Bureau of Fire Protection
Cordillera Administrative Region

Monitoring of Fire Incidents


DESCRIPTION January to December 2019
Intentional 0
Accidental Fire 244
CLASSIFICATION OF FIRE CASES

Undetermined 15
Fire Cases under Investigation 214

TOTAL 473
Bureau of Fire Protection
Cordillera Administrative Region

Monitored Forest Fires


Province Agricultural Forest Grass Rubbish
Abra 0 1 2 0
Apayao 0 0 0 1
Benguet 0 99 66 4
Ifugao 2 3 6 0
Kalinga 2 0 22 2
Mountain Province 0 34 16 0

TOTAL 4 132 106 8


Bureau of Fire Protection
Cordillera Administrative Region

Emergency Medical Services


ACTIVITIES July to Sept 2019
FIRE INCIDENTS 27

VEHICULAR ACCIDENTS 68
EMERGENCY
RESPONSES MEDICAL CASES 80

RESCUE OPERATIONS/
58
DISASTERS
Bureau of Fire Protection
Cordillera Administrative Region

Emergency Medical Services


DENTAL SERVICES 318
MEDICAL STANDBY 56
BLOOD LETTING 0
CONSULTATION 320
NON
EMERGENCY BP MONITORING 356
RESPONSES DRILLS CONDUCTED 135
OTHERS 216

TOTAL 1,634
Bureau of Fire Protection
Cordillera Administrative Region

OUTPUT INDICATORS
Physical Accomplishment

1st QTR 2nd QTR 3rd QTR TOTAL


1. Percentage of buildings and establishments
98.38% or 37,088 92.07% or 14,648 92.07% or 7,410 96.79% or 59,146
inspected covered by Fire Code: BPLO registered,
inspected out of 37,700 inspected out of 15,909 inspected out of 4,500 inspected out of 58,109
Government owned bldg./structures, establishment
building and establishment building and establishment building and establishment building and
under PEZA, and all other privately owned
covered by Fire Code covered by Fire Code covered by Fire Code esteblishments covered by
bldgs./structures not requiring FSIC against total no.
regionwide regionwide regionwide Fire Code regionwide
of buildings and establishments ragionwide.
2. Percentage of Fire Safety Inspection Certificate
100% or 37,625 FSIC 100% or 14,029 FSIC 100% or 6,753 FSIC rated 100% or 58,407 FSIC
(FSIC) rated buildings and structure that has not
rated buildings out of rated buildings out of buildings out of 6,753 has rated buildings out of
been the cause of fire incident (origin of fire) against
37,625 has not been the 14,029 has not been the not been the cause of fire 58,407 has not the cause
total number of FSIC rated buildings/establishments
cause of fire incident cause of fire incident incident of fire incident
ragionwide.
100% or 59,146 inspected
3. Percentage (%) of buildings and establishments 100% or 37,088 inspected 100% or 14,648 inspected 100% or 7,410 inspected
within the time frame out
inspected within the prescribed time frame (i.e. 3½ within the prescribed time within the prescribed time within the prescribed time
of 59,146
days from the receipt of Inspection Order (IO) of the frame out of 37,088 frame out of 14,648 frame out of 7,410
buildings/establishment
Fire safety Inspector) against total number of buildings/establishment buildings/establishment buildings/establishment
inspected conducted
buildings/establishments inspected regionwide inspected regionwide inspected regionwide inspected regionwide
regionwide
4. Number of Oplan Ligtas na Pamayanan Activities:
Community Fire Protection Plan (CFPP) Formulated;
112 Oplan Ligtas na 17,588 Oplan Ligtas na 781 Oplan Ligtas na 18,481 Oplan Ligtas na
Community Fire Auxiliary Group (CFAG) Organized;
Pamayanan activities Pamayanan activities Pamayanan activities Pamayanan activities
House-to-house Fire Safety Survey, Lectures and
conducted conducted conducted conducted
Campaigns Conducted; and Simulated Drills
Conducted
Bureau of Fire Protection
Cordillera Administrative Region

OUTPUT INDICATORS Physical Accomplishment


1st QTR 2nd QTR 3rd QTR TOTAL
88.28% or 241 calls 87.78% or 79 calls 93.94% or 62 calls 89.04% or 382 calls
1.Percentage (%) of fire, emergency and rescue
responded out of 273 fire, responded out of 90 fire, responded out of 66 fire, responded out of 429 fire,
calls responded nationwide (fire related) against
emergency and rescue emergency and rescue emergency and rescue emergency and rescue
total number of fire, EMS and rescue calls
calls calls calls calls

38.87% or 96 fire calls not 30.86% or 25 fire calls not 71.79% or 28 fire calls not 40.60% or 149 fire calls
2. Percentage (%) of fire calls not exceeding
exceeding 300,000 exceeding 300,000 exceeding 300,000 not exceeding 300,000
300,000 estimated property damage out of the total
estimated property estimated property estimated property estimated property
number of fire calls ragionwide.
damage out of 247 damage out of 81 damage out of 39 damage out of 367

36.82% or 88 responded 45.79% or 174 responded


3. Percentage (%) of fire calls and related 49.37% or 39 responded 75.81% or 47 responded
within 7 min. out of 239 within 7 min. out of 380
emergencies responded within seven (7) minutes within 7 min. out of 79 fire within 7 min. out of 62 fire
fire and related fire and related
(from receipt of call until arrival on the fire scene) and related emergencies and related emergencies
emergencies (215 fire; 24 emergencies (321 fire; 59
against total fire and emergency calls responded. (70 fire; 9 EMS) (70 fire; 9 EMS)
EMS) EMS)

REMARKS:
OUTPUT INDICATOR 1: 321 out of 367 fire calls, 59 out of 60 EMS, and 2 out of 2 rescue calls
OUTPUT INDICATOR 3: Fire stations are not strategically located to facilitate fast and timely response. Cordillera is a
mountainous area thus the terrain consumes time during response
Bureau of Fire Protection
Cordillera Administrative Region

OUTPUT INDICATORS Physical Accomplishment

1st QTR 2nd QTR 3rd QTR TOTAL

1. Percentage (%) of households in


disaster/calamity-affected barangays rendered with 0.00% or 0 rendered with 0.00% or 0 rendered with 0.00% or 0 rendered with 0.00% or 0 rendered with
assistance against total households in assistance assistance assistance assistance
disaster/calamity-affected barangays

98 individuals rendered 207 individuals rendered 78 individuals rendered 383 individuals rendered
2.Number of individuals rendered with technical
with technical rescue with technical rescue with technical rescue with technical rescue
rescue assistance/intervention
assistance/intervention assistance/intervention assistance/intervention assistance/intervention

128 Non-emergency 116 Non-emergency cases 56 Non-emergency cases 300 Non-emergency


3.Number of Non-emergency cases rendered with
cases rendered with rendered with assistance rendered with assistance cases rendered with
assistance by BFP
assistance by BFP by BFP by BFP assistance by BFP

24 Local, National and 25 Local, National and 319 Local, National and 368 Local, National and
4.Number of Local, National and International events International events International events International events International events
deployed with BFP contingents deployed with BFP deployed with BFP deployed with BFP deployed with BFP
contingents contingents contingents contingents

5. Number of LGUs extended with technical trainings 3 LGUs extended with 52 LGUs extended with 113 LGUs extended with 168 LGUs extended with
by BFP technical trainings by BFP technical trainings by BFP technical trainings by BFP technical trainings by BFP
Bureau of Fire Protection
Cordillera Administrative Region

OUTPUT INDICATORS Physical Accomplishment


1st QTR 2nd QTR 3rd QTR TOTAL
103.24% or 287 fire 115.71% or 81 fire 108.33% or 39 fire 105.99% or 407 fire
1.Percentage (%) fire incidents investigated against incidents investigated out incidents investigated out incidents investigated out incidents investigated out
total no. of fire incidents responded. of 278 fire incident of 70 fire incident of 36 fire incident of 384 fire incident
responded responded responded responded
0.00% or 0 arson cases 33.33% or 1 arson cases 12.50% or 1 arson cases
2.Percentage (%) of arson fire cases filed in court 0% or 0 arson cases filed
filed in court out of 5 arson filed in court out of 3 arson filed in court out of 8 arson
against total no. of arson fires. in court out of 0 arson fires
fires fires fires

103.24% or 287 fire 115.71% or 81 fire 108.33% or 39 fire 105.99% or 407 fire
3.Percentage (%) of fire incidents investigated with
incidents investigated with incidents investigated with incidents investigated with incidents investigated with
SIR submitted against total number of fire incident
SIR submitted out of 278 SIR submitted out of 70 SIR submitted out of 36 SIR submitted out of 384
responded regionwide.
fire incident responded fire incident responded fire incident responded fire incident responded
OUTCOME 2: Timely, effective and gender-
sensitive support assistance to individuals,
families and communities in affected areas
provided
LEAD AGENCIES

OCD-CAR CORDILLERA RDRRMC PROCor

DOH-CAR DSWD-CAR
Office of Civil Defense
Cordillera Administrative Region

1 RDANA Field Mission

ACCOMPLISHED
23 774 Family Food Packs and
₱7,872,862.41 worth of Non Food Items
DISTRIBUTED to 25,232 Affected
Families in 46 municipalities within the
region
450 Sets of Family Tents and 3,400
Family Food Packs HAULED as an
augmentation to the Disaster Operations
of Regions IVB,VIII, X, XI and XII.
1,912 households were
9,933 households were PROVIDED under the
PROVIDED Early Core Shelter Assistance
Shelter Assistance Program (CSAP)
(ESA)

8,539 households were 254 households were


PAID under the Cash GIVEN FAMILY FOOD
for Work Projects PACKS under the Food
for Work Projects
170 DSWD 7,681 families were
Personnel were PROVIDED full assistance
TRAINED on while staying inside
DRRM evacuation centers

77 33,333 beneficiaries
municipalities BENEFITED under the
have ACCESS Risk Resiliency Program
to prepositioned of Climate Change
goods Adaptation and
Mitigation- Cash for
Work
44 TY “Ompong” As issued by the
survivors were Sustainable Livelihood
PROVIDED with Program of DSWD,
educational Memorandum Circular
assistance by the 15 s. 2018 allowed the
Crisis Intervention 3,083 displaced
Unit of DSWD families during the
onslaught of TY
“Ompong” to RECEIVE
the Seed Capital Fund
as their livelihood
grants
Department of Agriculture
Cordillera Administrative Region

99,789 farmer beneficiaries were PROVIDED with:


- 26,000 bags rice seeds and fertilizers
- 33,437 bags corn seeds and fertilizers
- 303,757 kg. of high value seeds, fertilizers, plastic sheets
and fruit planting materials
- 189,215 heads livestock and poultry, feeds and biologics-
Department of Agriculture
Cordillera Administrative Region

TYPHOON OMPONG
Intervention Physical Target Target Beneficiaries Province Total Fund

CORN SEEDS 20,000 Bags 20,000 Apayao, Kalinga, 110,043,500.00


Ifugao
VARIOUS VEGETABLE 16,379 Kls. 22,281 All Province 10,941,790.00
SEEDS

LIVESTOCK AND 56,395 Hds. 1,460 All Province 6,850,500.00


POULTRY STOCKS

ANIMAL FEEDS 1,443 Bags 1,443 All Province 2,639,500.00


Department of Agriculture
Cordillera Administrative Region

TYPHOON OMPONG

Intervention Physical Target Target Beneficiaries Province Total Fund

POTATO SEEDS 11,567 Kls. 547 Benguet 2,000,000.00


Department of Agriculture
Cordillera Administrative Region

TYPHOON OMPONG
Intervention Physical Target Target Beneficiaries Province Total Fund

RICE SEEDS AND 26,000 Bags 44,008 All Province 40,723,340.00


FERTILIZERS
CORN SEEDS 13,010 Bags 12,829 Ifugao and Mt. 60,648,000.00
Province
ASSORTED 29,107.70 Kl.s 20,246,659.00
VEGETABLE SEEDS
PLANTING 245,013 13,378,001.00
MATERIALS seedlings 22,281 All Province
PLASTIC SHEETS 436 Rolls 12,320,000.00

HVC FERTILIZERS 1,255 Bags 1,757,000.00


Department of Agriculture
Cordillera Administrative Region

TYPHOON ROSITA

Initial assistance of 504.18 kls. assorted


vegetable seeds amounting to 2,016,720.00
and 3,000 bags OPV corn seeds worth of 6M
pesos.
Department of Agriculture
Cordillera Administrative Region

EL NINO/ DROUGHT
18,370 individuals with 84 groups were
PROVIDED with:
- 2,203 bags rice
- 26,873 bags corn
- 6,000 kg. forage seeds
- 800 units plastic drums
- 40 units water tank
- 8 units silage making machine
- 38 unit forage chopper
- Trainings on silage making for livestock
production
Department of Agriculture
Cordillera Administrative Region

EL NINO/ DROUGHT
Intervention Physical Target Target Beneficiaries Province Total Fund

CORN SEEDS 26,873 Bags 15,291 Mt. Province, Kalinga, Ifugao 121,463,300.00
RICE SEEDS 2,203 Bags 2,203 Apayao, Kalinga, Abra 3,413,440.00

Intervention Physical Target Beneficiaries Province Total Fund


Target
FORAGE SEEDS 6,000 Kls. 60 120,000.00
PLASTIC DRUMS 800 Units 636 Ind. 560,000.00
3 Farmer Group
WATER TANK 40 Units 37 FG 10,000,000.00
All Province
SILAGE MAKING MACHINE 8 Units 8 FG 3,500,000.00
FORAGE CHOPPER 38 Units 36 FG 3,040,000.00
TRAINING ON SILAGE 6 180 1,395,000.00
MAKING
Bureau of Fisheries and
Aquatic Resources
Cordillera Administrative Region

2 Fisheries Vulnerability Assessment of Aquaculture


and Inland Capture Fisheries Sectors
4 Damage Loss Assessment Report and Impact
Assessments

COMPLETED
Bureau of Fisheries and
Aquatic Resources
Cordillera Administrative Region

Distribution of livelihood assistance to disaster-affected


fisherfolk
PROVINCE FINGERLINGS NO. FINGERLINGS REMARKS
DISTRIBUTED
MT. Tilapia Fingerlings 21,000 pieces Conducted replacement of fingerlings in
PROVINCE Bauko and Tadian.
104,000 pieces To be distributed on January 2020 in
Natonin, Paracelis and Sagada.
APAYAO Tilapia Fingerlings 556,330 pieces To be distributed on January 2020 in the 7
municipalities of Apayao.
Department of Education
Cordillera Administrative Region

Class suspensions were DECLARED


due to the weather disturbances

Brigada Eskwela were


CONDUCTED to ensure safety of
the students within school
premises
Temporary Learning Spaces were
FUNDED in order to ensure the students’
continuity of learning
Department of Education
Cordillera Administrative Region

28 schools ACCOMODATED the


displaced families in the Province of
Apayao
Rapid Assessment of Damages
Report were SUBMITTED to end
users in times of disaster operations

Facilities and utilities were SOURCED


OUT AND REALIGNED from one school
to another
Department of Education
Cordillera Administrative Region

112 teaching and non-teaching staff traumatized


during the onslaught of TY Ompong and laboratory
experiment explosion were PROVIDED with
Psychological First Aid

Victims during the laboratory experiment


explosion were GIVEN financial assistance and
special educational services
Department of Public Works and
Highways
Cordillera Administrative Region

FLOOD CONTROL PROJECTS


Financial
Number of Name of Physical Accomplishment
IMPLEMENTING OFFICE Allocation Accomplishment Remarks
Projects Typhoon
Figure Percentage Figure Percentage
1 - Post-qualification. Awaiting for the approval
MT. PROVINCE 1ST 2.00 20000000 "Rosita" 1,373,994.33 6.87% 744,704.92 3.72%
of change title
1 - Post-qualification. Awaiting for the approval
REGIONAL SUMMARY 2.00 20000000 1,373,994.33 6.87% 744,704.92 3.72%
of change title
Department of Public Works and
Highways
Cordillera Administrative Region

MT. PROVINCE 1ST ENGINEERING OFFICE


Implementation Status (%)
Amount Implementation Actions Taken/
Name of Project/Components Location Total Project Cost Physical Financial
Issues Recommendation
DPWH Fund NDRRM Fund Target Actual Target Actual
Rehabilitation/Reconstruction/Repair of Flood
Lusad,
Control along Chico River, Lusad Section,
1 Sabangan, 9,159,962.17 10,000,000.00 22.22% 8.13% 22.22% 15.00% Project is on going
Sta.0+000 - Sta. 0+850 (IS), Lusad,
Mt. Province
Sabangan, Mt. Province
Under Post-
Rehabilitation/Reconstruction/Repair of Flood
Lagan, qualification. Short of
Control along Chico River, Lagan Section,
2 Sabangan, 10,000,000.00 0.00% 0.00% 0.00% 0.00% Award. Awaiting for
Sta.0+000 - Sta. 0+250 (IS), Lagan,
Mt. Province the approval of the
Sabangan, Mt. Province
change in title
Department of Public Works and
Highways
Cordillera Administrative Region

HIGHWAY [ROAD] PROJECTS


Financial
Number of Name of Physical Accomplishment
IMPLEMENTING OFFICE Allocation Accomplishment Remarks
Projects Typhoon
Figure Percentage Figure Percentage
2 projects on-going
ABRA 3 7,213,000.00 - 0.00% 3,307,467.88 45.85%
1 project completed
APAYAO 2ND 3 13,777,797.06 "Lawin" 13,343,986.68 96.85% 13,343,986.68 96.85% Projects completed
BENGUET 2ND 1 28,145,700.00 "Ompong" 12,230,824.36 43.46% 13,294,374.30 47.23% Project is on-going
Notice to Proceed dated December 20,
IFUGAO 1ST 1 25,363,800.00 - 0.00% - 0.00% 2019.
Project on-going
MT. PROVINCE 2ND 1 3,732,300.00 "Lawin" 3,173,832.81 85.04% 3,526,480.90 94.49% Project completed
5 - Projects completed
REGIONAL SUMMARY 9 78,232,597.06 28,748,643.85 36.75% 33,472,309.77 42.79% 3 - Projects on-going
1 - Projects Not yet started
Department of Public Works and
Highways
Cordillera Administrative Region

ABRA DISTRICT ENGINEERING OFFICE


Implementation Status (%)
Amount Implementation Actions Taken/
Name of Project/Components Location Total Project Cost Physical Financial
Issues Recommendation
DPWH Fund NDRRM Fund Target Actual Target Actual
Repair/Rehabilitation/Improvement of Abra -
Nagaparan,
1 Ilocos Norte Road, Nagaparan, Danglas, Abra, 3,919,844.30 4,225,000.00 41.71% 43.86% 0.00% 0.00% Project is on-going
Danglas
K0427+524 - K0427+559
Repair/Rehabilitation/Improvement of Abra -
Nagaparan,
2 Ilocos Norte Road, Nagaparan, Danglas, Abra, 2,333,829.57 2,497,000.00 41.71% 43.86% 0.00% 0.00% Project is on-going
Danglas
K0429+177 - K0429+269
Department of Public Works and
Highways
Cordillera Administrative Region

BENGUET 2ND DISTRICT ENGINEERING OFFICE

Implementation Status (%)


Amount Implementation Actions Taken/
Name of Project/Components Location Total Project Cost Physical Financial
Issues Recommendation
DPWH Fund NDRRM Fund Target Actual Target Actual
Rehabilitation/Restoration of Roadslip along
Buguias,
1 Baguio - Bontoc Road, K0318+190 - 27,411,081.04 28,145,700.00 51.20% 48.50% 50.00% 44.62% Project is on-going
Benguet
K0318+244, Buguias, Benguet
Department of Public Works and
Highways
Cordillera Administrative Region

IFUGAO 1ST DISTRICT ENGINEERING OFFICE


Implementation Status (%)
Amount Implementation Actions Taken/
Name of Project/Components Location Total Project Cost Physical Financial
Issues Recommendation
DPWH Fund NDRRM Fund Target Actual Target Actual
Rehabilitation/Reconstruction of Roads with Notice to Proceed
Slips, Soil Cilapse and Landslide along Kiangan - dated December 20,
1 Tinoc, Ifugao 23,654,877.18 25,363,800.00 0.00% 0.00% 0.00% 0.00%
Tinoc - Buguias Road, K0357+197 - 2019.
K0357+471.71 Project on-going
Department of Public Works and
Highways
Cordillera Administrative Region

EVACUATION CENTERS
STATUS OF REGIONAL EVACUATION CENTERS

ACCOMPLISHMENT
YEAR FUNDED LOCATION PROJECT COST
PHYSICAL FINANCIAL
San Gregorio, La Paz Php 32,903,997.05 100.00% 0.00%
2017 Wangal, La Trinidad, Benguet Php 34,739,998.43 100.00% 100.00%
Caggon, Boliwong, Lagawe, Ifugao Php 34,739,945.27 100.00% 77.17%
Agbannawag, Tabuk City Php 33,889,000.00 96.00% 60.16%
2018
Poblacion, Bauko, Mt. Province Php 34,222,837.61 100.00% 85.00%
Cubet, Malama, Conner, Apayao Php 34,319,565.63 23.86% 15.00%
Sta. Maria, Alfonso Lista, Ifugao Php 34,740,000.00 30.68% 15.00%
2019
Cagaluan, Pasil, Kalinga Php 34,402,467.13 0.64% 15.00%
Butigue, Paracelis Php 34,740,000.00 23.15% 15.00%
OUTCOME 3: Coordination with partner agencies
in times of emergencies, disasters established
LEAD AGENCIES

OCD-CAR PIA- CAR DILG- CAR DSWD-CAR


Office of Civil Defense
Cordillera Administrative Region

24 Cordillera RDRRMC Alert Activations


SUCCESSFULLY MANAGED

FULL FORCE
INTER-AGENCY
INFORMATION DISSEMINATION &
EARLY WARNING SIGNALS
OUTCOME 4: Organized, systematic and
strategic approach
LEAD AGENCIES

OCD-CAR CORDILLERA RDRRMC


Office of Civil Defense
Cordillera Administrative Region

EFFECTIVE and ORGANIZED


FULL FORCE
INTER-AGENCY
CLUSTER OPERATIONS
TOWARDS A DISASTER RESILIENT
CORDILLERA!

THANK YOU!

You might also like