0% found this document useful (0 votes)
89 views

Value Navigator - Reserve Management

This document provides an overview of reserves management in 3 slides. It discusses configuring a database for reserves management, defining key elements like jurisdictions and change categories. It also summarizes balancing an initial estimate, reforecasting, automatic reconciliation, and reporting revised estimates. A resource assessment and management workflow are shown. An example reserve reconciliation waterfall is presented.

Uploaded by

Jorge Romero
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
89 views

Value Navigator - Reserve Management

This document provides an overview of reserves management in 3 slides. It discusses configuring a database for reserves management, defining key elements like jurisdictions and change categories. It also summarizes balancing an initial estimate, reforecasting, automatic reconciliation, and reporting revised estimates. A resource assessment and management workflow are shown. An example reserve reconciliation waterfall is presented.

Uploaded by

Jorge Romero
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 8

Value Navigator - Reserve

Management
Presenter: Kevin Beal

www.aucerna.com
Reserves Management: Topics
• Configure a database for use in Reserves Management
• Define Jurisdictions
• Define Change Record Categories
• Define Sequences
• Balance and Post an Initial Estimate
• Reforecasting and Various other Changes
• Automatic Reconciliation
• Waterfall tab
• Post Revised Estimates
• Reporting

www.aucerna.com
Resource Assessment

Petroleum Resources Management System | Version 1.01 (2018)

www.aucerna.com
Reserves Management
• Production rates decline as the reservoir is depleted. New resources, development
of existing resources to improve recovery, contribute to the maintenance of base
reserves available to the organization.
• Reserves management entails the identification of the causes of revisions to
reserves estimates.
• Inaccurate estimation of reserves  Technical revisions
• Economic factor revisions  Higher than estimated operating costs, capital
costs, royalties, etc.

www.aucerna.com
Resource Management Example

Reserve Reconciliation - Total Proved


Total Company Oil (Mbbl) Gas (MMcf) NGL (Mbbl) Total (MBOE)
Opening Balance (December 31, 2017) 52,800 62,543 450 63,674
Discoveries - 25 - 4
Extensions 250 50 10 268
Infill Drilling 524 26 12 540
Improved Recovery 136 - - 136
Acquisitions 600 - - 600
Dispositions - (100) - (17)
Economic Factors (15) (350) - (73)
Technical Revisions 262 (90) (10) 237
Production (1,320) (1,564) (11) (1,592)
Closing Balance (December 31, 2018) 53,237 60,540 451 63,778

www.aucerna.com
Resource Management Workflow

www.aucerna.com
Resource Management – Waterfall Example

www.aucerna.com
Resource Management Change Record
Sequence
Change Record Sequence
NI 51-101 SEC

Extension & Improved Recovery Economic Factors

Technical Revisions Production

Discoveries Extension & Improved Recovery

Acquisitions Discoveries

Dispositions Acquisitions

Economic Factors Dispositions

Production Technical Revisions

Accretion of Discount Accretion of Discount