Clean Development Mechanism (CDM) in Malaysia
Clean Development Mechanism (CDM) in Malaysia
5 OCTOBER 2010
by
CDM ENERGY SECRETARIAT
1
GreenTech MALAYSIA
Presentation Outline
• Introduction
• CDM Institutional
Framework
• CDM Development
in Malaysia
GreenTech MALAYSIA
Involvement in Climate Change Process
• Kyoto Protocol
– Signed on 12 March 1999
– Ratified on 4 September 2002
– Entered into force on 16 February 2005
GreenTech MALAYSIA
CDM in Malaysia
GreenTech MALAYSIA
CDM Institutional Arrangement
GreenTech MALAYSIA
CDM Institutional Framework
GreenTech MALAYSIA
CDM Project Cycle
Carbon Contracting
6
GreenTech MALAYSIA
APPROVAL PROCESS – OPTION 1
Project Proponent
Project
National Committee on Idea Note
CDM
(NCCDM) No
Fulfill
National
Criteria
Project Design
Document
Operational
Entity (OE) No
Fulfill
International
Criteria
Yes – On condition of OE
validation of PDD
Designated National
Authority (DNA) Host Country’s Letter
of Approval
CDM 8
Executive Board Registration
GreenTech MALAYSIA
22
APPROVAL PROCESS – OPTION 2
Project Proponent
National Committee on
CDM
(NCCDM) Project Design
Document
No
Fulfill
Operational National & International
Entity (OE) Criteria
Yes – On condition of OE
validation of PDD
Designated National
Host Country’s Letter
Authority (DNA) of Approval
CDM Registration
Executive Board
GreenTech MALAYSIA
12
Project Idea Note
10
GreenTech MALAYSIA
Additional Information Sheet
11
GreenTech MALAYSIA
Checklist for submission of PIN
12
GreenTech MALAYSIA
Checklist for submission of AIS
13
GreenTech MALAYSIA
Malaysia CDM Administration Fee
14
GreenTech MALAYSIA
National CDM Criteria
1. Project must support the sustainable development policies of Malaysia and bring direct
benefits towards achieving sustainable development;
2. Project must involve participation of Annex 1 Party/Parties as CER buyer. In addition, they
are encouraged to participate as equity or technology providers;
4. Project must fulfill all conditions underlined by the CDM Executive Board; and
5. Project proponent should justify the ability to implement the proposed CDM project activity
* Where flaring is used in methane abatement project, the project developer is required to
utilize at least 10 percent of biogas for energy utilization
15
GreenTech MALAYSIA
Further Requirements
16
GreenTech MALAYSIA
CDM Baseline 2008
17
GreenTech MALAYSIA
CDM Application (Energy Project)
As of September 2010
2002 3 124,987
2003 2 62,190
2004 9 918,275
2005 25 2,823,171
2006 21 2,621,098
2007 45 4,404,759
2008 50 4,342,384
2009 24 1,632,589
2010 13 286,809
TOTAL (PINs and PDDs) 192 17,216,262 18
18
GreenTech MALAYSIA
CDM Application (Project Type)
Project Application by Project Type
Agriculture,
370,000 Biomass - Kenaf Waste,
30,833
Animal Waste,
Spent Bleaching Earth (SBE),
158,639
29,722
Biogas - Palm Oil Mill Effluent (POME),
Landfill, 1,561,264
Municipal Waste, 596,254 3,803,599
Fuel Sw itch, 62,011 Energy Efficiency (EE), 1,058,839
Biomass - Empty Fruit Bunch (EFB) Biomass - Palm Kernel Shell (PKS) Biomass - Wood Waste Biomass - Kenaf Waste
Spent Bleaching Earth (SBE) Biogas - Palm Oil Mill Effluent (POME) Energy Efficiency (EE) Fuel Switch
Landfill Municipal Waste Animal Waste Agriculture
Hydro Mini Hydro Biodiesel - Transportation Chemical Industry
Oil and Gas Manufacturing Industries 19
GreenTech MALAYSIA
Trend and Analysis of CDM Projects
20
20
GreenTech MALAYSIA
CDM Application (Energy Project)
GreenTech MALAYSIA
CERS Issued
22
22
GreenTech MALAYSIA
Bukit Tagar Sanitary Landfill
23
23 Heat Recovery Boiler & EnviroCycler in MASB Power
Plant
GreenTech MALAYSIA
Kina & Seguntor plants
Boiler
Front view of
the plant
Fuel treatment 24
GreenTech MALAYSIA
Monitoring Of CDM Projects
Issues raised
• DOE validation process took longer time
• Project monitoring is lengthy
– Calibration of equipment (for some of the equipment
no “local calibrator”)
• Registration with CDM EB
– Longer process (request for review and so forth)
• Methodology keep on changing every now and then
• More and more requirement or new guideline from CDM
EB
• SREP: Agreement on the REPPA
• No issues on local CDM process
25
GreenTech MALAYSIA
Potential CDM Projects
26
26
GreenTech MALAYSIA
Potential CDM Projects
2. Wastewater sector
27
27
GreenTech MALAYSIA
Potential CDM Projects
28
28
GreenTech MALAYSIA
Conclusion
GreenTech MALAYSIA
Contact for Further Information (DNA)
Designated National Authority
Environmental Management & Climate Change Division
Ministry of Natural Resources and Environment
Level 6, Tower Block 4G3, Precinct 4
Federal Government Administrative Centre
62574 PUTRAJAYA
GreenTech MALAYSIA
Contact for Further Information
CDM Energy Secretariat
Malaysian Green Technology Corporation
No. 2, Jalan 9/10, Persiaran Usahawan, Seksyen 9
43650 Bandar Baru Bangi
Selangor Darul Ehsan
Malaysia
31
GreenTech MALAYSIA
Contact for Further Information
32
GreenTech MALAYSIA
Thank You