Cellular Layout: Case Study
Cellular Layout: Case Study
CASE STUDY
STYLE DESCRIPTION
BUYER NYGARD
SYLE 102
CLASSIFICATION TROUSER
OPERATION BULLETIN- CONVENTIONAL
IBG JORDAN
Operation Bulletin
Style #102 MACHINE REQUIREMENT WIP
Waiting Time
Total
Sl# Code Operation Machine SMV Target Manpower Kansai Single Needle Bartack 5T Overlock 3T Overlock Blind Hem WIP (NVA)
Output/Hr
1 M1 Pocket bag Overlock 5T O/L 0.95 63 2.5 3 158 0.38
2 M2 Pocket Attach SNLS 0.43 140 1.5 1 209 0.29 0.09
3 M3 Pocket Outline SNLS 0.26 231 1 1 231 0.26 0.03
4 M4 Pocket tacking SNLS 0.45 133 1.5 1 200 31 0.30
5 M5 Side Seam 5T O/L 0.84 71 2 2 143 57 0.42
6 M6 Inseam Attach 5T O/L 0.6 100 2 2 200 0.30 0.12
7 M7 Overlock backrise 5T O/L 0.33 182 1 1 182 18 0.33
8 M8 Mark Elastic Helper 0.18 333 1 333 0.18 0.15
9 M9 Attach Elastic 3T O/L 0.37 162 1 1 162 171 0.37
10 M10 Bottom Serge 3T O/L 0.26 231 1 1 231 0.26 0.11
11 M11 Blind Hem Blind Hem 0.28 214 1 1 214 16 0.28
12 M12 Press garment (seams) Press 0.33 182 1 182 32 0.33
13 M13 Label Attach SNLS 0.42 143 1 1 143 39 0.42
14 M14 Waist band tacking SNLS 0.18 333 1 1 333 0.18 0.24
15 M15 Elastic Smocking Kansai 0.57 105 1.5 2 158 175 0.38
16 M16 Bartack Front Bartack Mac 0.23 261 1 1 261 0.23 0.15
17 M17 Checking helper 0.3 200 1 200 61 0.30
Handling Time 1 67 200
TOTAL 7.87 22 2 5 1 8 2 1 541 0.89
100% 168
90% 151
85% 143
FLOOR AREA REQUIRED-CONVENTIONAL LINE
2.64 meter
INPUT
Chec
M1 M1 M4 M5 M6 M8 M10 M11 M14 M15
king
13.75 meter
Length 13.75 m
Breadth 2.64 m
Area 36.3 m^2
OPERATION BULLETIN- LEAN LINE
IBG JORDAN
Operation Bulletin-CELLULAR LAYOUT
Style #102 MACHINE REQUIREMENT
Sl# Code Operation Machine SMV Target Manpower Kansai Single Needle Bartack 5T Overlock 3T Overlock Blind Hem
1 M1 Pocket bag Overlock 5T O/L
2 Pocket Attach SNLS
2.09 29 1 1 1
3 M2 Pocket Outline SNLS
4 Pocket tacking SNLS
5 Side Seam 5T O/L
6 M3 Inseam Attach 5T O/L 1.67 36 1 1
7 Overlock backrise 5T O/L
8 Mark Elastic Helper
9 Attach Elastic 3T O/L
M4
10 Bottom Serge 3T O/L 1.42 42 1 1 1
11 M5 Blind Hem Blind Hem
12 M6 Press garment (seams) Press
13 Label Attach SNLS
M7
14 Waist band tacking SNLS
15 M8 Elastic Smocking Kansai 1.59 38 1 1 1 1
16 M9 Bartack Front Bartack Mac
17 Placing back the Garment Helper
TOTAL 6.77 4 1 2 1 2 1 1
TARGET 100% 35
90% 32
85% 30
CELLULAR LAYOUT
5TOL SNLS 5TOL 3TOL 3TOL 5TOL SNLS 5TOL
BHM
CELL 1 CELL 3
BHM
CELL 4
CELL 2
Length 9.11 m
Breadth 4.2 m
Area 38.262 m^2
COMPARISON
SL FACTORS CONVENTIONAL CELLULAR
1 Standard Minute Value 7.87 6.77
2 Manpower 22 20
3 Target per Hour 168 177
4 Floor Area (Sq.m) 36.3 47.82
5 Machine requirement 19 40
6 WIP 541 0
7 Waiting Time 0.89 0.67
8 Multi Skil Level Operator Not required Required
9 Changeover time 2days less than 1hrs