MANUFACTURING PROCESS
PART 2 (IBS AND PRODUCTIVITY)
INDUSTRIALISED BUILDING SYSTEM
CHARACTERISTICS
5. SPECIALISATION
Large production output and standardisation allow high degree of labour specialisation. Workers are
exposed to their repetitively work with higher productivity level.
6. PRODUCTION FACILITY
Initial facility by setting a permanent factory, with plant, equipment, skill workers, management
resources to be acquired before commenced the production.
7. INTEGRATION
A high degree of coordination must exist between relevant parties .
SHOP DRAWINGS
r/Fabricators
Manufacture
Showing how they
CONCEPTUAL
manufactured the
(CLIENT
components
REQUREMENT)
Early Decision -making
PRELIMINARY
PLAN
CONSTRUCTION /
WORKING
DESIGN ESTIMATE /DETAIL
DRAWINGS
ARCHITECTURAL
Limit of design process
Slab
PRECAST CONCRETE (PC) SYSTEM :
FRAMING SYSTEM : COLUMN AND BEAM
Finishing before
transporting for installation
PRECAST HOLLOW
CORE SLAB [TOP]
http://provenholding.com/en/what-is-ibs/formwork-system/
PRODUCTION PROCESS OF FORMWORK SYSTEM- Zone 1 Zone 2 Zone 3
Tunnel form & Load Bearing Wall
Reinforcement for wall
Aluminium Mould
Install reinforcement for wall Install one side formwork &
transported to the
site
install conduit (M&E, Zone 1 Zone 2 Zone 3
services)
Install one side of formwork
Reinforcement for wall
The various process routes may be different in respect of principle, technique, quality of products
and time requirement and cost of manufacture.
The best one is to be selected based on some criteria. Achieving the goal in manufacturing requires
fulfillment of one or more of the following objectives:
1. reduction of manufacturing time (lead time, cycle time and takt time)
2. increase of productivity
Conventional physical
work IBS physical work
Ibrahim Mohd Noor, “Based on S-Curve graph, it can easily see that for conventional, the graph peak
Kenchana Precast Sdn Bhd
up during the planning process but slows down when it comes to construction
period. While IBS is slow during the planning process but become very fast when
it comes to construction period”