0% found this document useful (0 votes)
120 views

Hazard Identification & Risk Assessment

The document outlines a hazard identification and risk assessment study conducted for an oil and gas company's (SPDC) new gas project. It describes the objectives, methodology, hazards identified, and risk levels associated with well casing and cementing. Several high and extreme risks were found. The conclusion recommends managing hazards through advanced technologies, surveys, and minimizing costs and delays to improve safety and project success.

Uploaded by

Daniel Omolewa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
120 views

Hazard Identification & Risk Assessment

The document outlines a hazard identification and risk assessment study conducted for an oil and gas company's (SPDC) new gas project. It describes the objectives, methodology, hazards identified, and risk levels associated with well casing and cementing. Several high and extreme risks were found. The conclusion recommends managing hazards through advanced technologies, surveys, and minimizing costs and delays to improve safety and project success.

Uploaded by

Daniel Omolewa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 19

HAZARD

IDENTIFICATION &
RISK ASSESSMENT
CLIENT: SPDC

CONTRACTOR: FOKAADOS
OUTLINE
• INTRODUCTION

• OBJECTIVE OF STUDY

• METHODOLOGY

• RESULT

• CONCLUSION
INTRODUCTION
 Oil and gas industry, largest
sectors in the world in terms of
dollar value, ($3.3 trillion in
revenue annually) "
Global Biggest Industries by Revenue in 20
20
." Accessed Jan. 22, 2021.

 Well casing and cementing is


one of the critical stage in oil
and gas industry. Why??

Hazard Identification is a proactive process to identify hazards


and eliminate or minimize/reduce the risk of injury/illness to
workers and damage to property, equipment and the
environment.
INTRODUCTION
DEATH RATE ??
167

FINANCIAL LOSS?
£2 billion (the equivalent
of US$ 5 billion today)

LOCATION??
Aberdeen in Scotland

DATE OF OCCURENCE??
06 July 1988 Piper Alpha Explosion

SOURCE: Article by Fiona Macleod CEng FIChemE and Stephen


Richardson (July 2018)
OBJECTIVE OF STUDY

SPDC is currently developing Assa North- Ohaji South Gas


Project. SPDC engaged FOKAADOS to carry out Hazard
Identification and Risk Assessment in other to;

 identify the hazards inherent in Well casing and cementing

 carry out risk assessment from each of the identified hazards

 recommend control measures to mitigate the risks


METHODOLOGY

Conduct pre-start Engage SPDC


discussions on the Review field Operations Team
work to be carried information i.e. EIA Lead on the job
out report processes

Using risk matrix


Breaking the job
approach to classify Identifying potential
down into a
the hazards hazards
sequence of steps.
identified.

Determining control
Looking at past
measures to
incidents and near
overcome these
misses
hazards
METHODOLOGY
• Tool Used: ISO 31000:2009 – Risk Matrix

RESULTS

THE RISK ASSESSMENT ASSOCIATED WITH


CEMENTING AND CASING OPERATION

EXTREME
9%
EXTREME
HIGH
MEDIUM MEDIUM
44%

HIGH
47%
RESULTS
RESULTS
RESULTS
RESULTS
RESULTS
RESULTS
RESULTS
RESULTS
RESULTS
RESULTS
CONCLUSION
• The hazards associated with drilling involve the subsurface,
mechanical, and operational aspects that have economic,
environmental, and safety consequences.
• The effects of these hazards found in casing and cementing
have implications on the project completion, economic
performance, and professional reputation.
• Managing and mitigating the casing and cementing hazards
found is an important aspect of engineering and geological
projects.
• The management often requires advanced technologies and
predrilling surveys. When evaluating the success of drilling
projects, it is necessary to view them in terms of timely
completions, in a safe manner, using the available
technology while minimizing overall costs.