I & C Presentation
I & C Presentation
I & C Project
04/30/21 1
Believe
04/30/21 2
Contents
Types of Commercial Customers
Process Flow Chart
Requirement of Documents
Meter and Regulator , MRS
Load Calculations.
Downstream work & Documentation
Conversion and Records
04/30/21 3
Let this flame energize
many more…….
Powder Coating Oven VAM
Gas pyre
04/30/21
Boilers Power plant Furnace Cogeneration 4
Categories of Commercial Customers
On Basis Of Consumption Patterns
COMMERCIAL INDUSTRIAL
(Consumption Till 1000SCMD)* (Consumption Above 1000SCMD)
04/30/21 5
Classification On Basis Of
Type Of Consumers
COMMERCIAL INDUSTRIAL
COMMERCIAL A COMMERCIAL B
CONCESSIONARY
NORMAL SMALL
(Restaurants / Caterers / SSI / Cafeterias) (Office Kitchen / Pantries)
(Temples / Trust / Govt. Inst.)
04/30/21 6
Process Flow Chart I
START RECEIVE CUST. REQUEST IDENTIFY THE CATEGORY ‘A’ / ‘B’ No
FROM MKT. DEPT. OF CUSTOMER TYPE
A
Yes
CARRY OUT THE TECHNICAL SURVEY
PREPARE TECHNICAL Yes & CHECK FORFEASIBILITY
SURVEY REPORT &
FEASIBLE?
INFORM MKT. DEPT
FOR REGISTRATION GET CONFIRMATION FROM PLNG.
DEPT. FOR LOAD FEASIBILITY
No
INFORM MKT. DEPT. NOT TO STOP
REGISTER THE CUSTOMER
C
04/30/21 8
Process Flow Chart III
ISSUE METER & REGULATOR DECIDE & EXPLAIN DURING D/S INSTALLATION,
C (IF REQUIRED) AS PER THE FINAL DOWNSTREAM AUDIT THE SITE FOR
QUOTATION ROUTE TO D/S CONTRACTOR QUALITY ASSURANCE
Not OK
GET IT RECTIFIED
ARRANGE FOR
COMMISSION LP AND THEN SUBMIT MJC SAFETY TRAINING
FORWARD THE PAPERS DOWNSTREAM LINE TO MKT &
TO O&M FOR AUDIT TO CUSTOMER
WITH THE HELP OF O&M BILLING DEPT. ( IF APPLICABLE)
THROUGH HSS&E DEPT.
04/30/21 STOP 9
Requirement of Documents…
Sr.No. Stage Document From Whom?
1 Pre-registration Customer request letter Customer through
Survey Mkt. Dept.
2 Feasibility Survey / Cust. Load requirement Customer
Quotation
3 Quotation Society permission Customer
Acceptance
4 Job Order Statutory Permission Statutory Authority
Planning Drawing. Planning Dept.
5 D/s Pre-audit D/s Testing Certificate Customer
CFO Noc / Permission
CFO Approved D/s As laid
Check list for CFO points
6 D/s Pre-audit D/s Inspection Report D/s Contractor
04/30/21 10
Meters, Regulators & MRS
Commonly used meters & regulators for I&C Connections.
04/30/21 12
Meter Installation.
Up to 40 SCMH Riser Regulator…
04/30/21 13
Meter Installation.
65 SCMH Riser
Regulator…
04/30/21 14
25 SCMH Riser - Meter Installation.
04/30/21 15
40 SCMH Riser
Regulator – Meter
Installation.
04/30/21 16
Industrial Installation & application.
04/30/21 17
Load Calculations.
For Burners…
For Boilers…
For Furnaces…
For VAM…
04/30/21 18
Load Calculations.
Commercial Burners.
High Pressure Burners (T Type)
04/30/21 19
Load Calculations.
High Pressure Burners ( M Type)
M-22 0.9
M-35 1.58
M-50 2.24
M-78 3.56
04/30/21 20
Load Calculations.
V Burners Burner Type Consumption (Kgs/Hr)
V-300 1.58
V-600 1.58
V-900 1.58
V-1200 1.58
04/30/21 21
Load Calculations.
Calculation for Boilers.
Capacity : 1 Ton (1000 Kgs/Hr)
Boiler Efficiency : 80 %
CV of Natural Gas : 8500 – 8600 Kcal / SCM
Latent Heat of Evp. : 540 Kcal / Kg
Sensible Heat of Water : 1 Kcal /Kg 0K
Considering intake of water at 600C
04/30/21 23
Load Calculations.
Calculation for VAM ( Air Conditioning)
Generally load taken for
VAM is 0.3 times of total TR.
04/30/21 24
I&C Database – INDCOMM
INDCOMM is a centralised database in
Approach form.
It is maintained by both Marketing and
Projects Department.
The data like New Registrations, Quotation
Acceptance, Survey Details, Conversion
Details, Customer Status, etc is captured
in this module.
This Module is accessible through Remote
Desktop.
04/30/21 25
INDCOMM…
The login screen appears like this:
04/30/21 26
INDCOMM…
And the main menu screen is……
04/30/21 27
Quotation (Commercial Offer)…
04/30/21 28
Quotation for less than 30 mtrs. of
PE laying.
Customer Name : M/s Sports Authority, Kandivali(E)
04/30/21 29
Customer Name : M/s Sports Authority,
Kandivali(E)
04/30/21 30
Customer Name : M/s Sports Authority,
Kandivali(E)
04/30/21 31
Quotation for more than 30 mtrs.
of PE laying.
Customer Name : M/s Rite On Coal, Kandivali(E)
04/30/21 32
Customer Name : M/s Rite On Coal,
Kandivali(E)
04/30/21 33
Customer Name : M/s Rite On Coal,
Kandivali(E)
04/30/21 34
Customer Name : M/s Rite On Coal,
Kandivali(E)
04/30/21 35
D/s Pipe Sizing…
Prepare the D/s route map with tentative consumption (Load).
With the use of Gas Flow Calculator design the network for optimum
sizing.
General Guidelines.
6 1”
10 1 ½”
25 1 1/2” or 2” (based on overall load & length)
40 1 1/2” or 2” (based on overall load & length)
65 2” or 3” (based on overall load & length)
MRS 3” and above
04/30/21 36
I&C Status..
Total Registrations:
A Type : 1211 Nos.
B Type : 156 Nos.
C Type : 29 Nos.
Industrial : 56 Nos.
Total Conversions:
A Type : 904 Nos.
B Type : 156 Nos.
C Type : 19 Nos.
Industrial : 52 Nos.
04/30/21 37
Current Status
04/30/21 38
I&C Targets and Progress..
04/30/21 39
Key Features of I&C Work.
RCC Protection tiles have to be laid in
both i.e. MP as well as LP.
Individual Stop Off Valve has to be
provided to every customer having riser
regulator.
Separate Auto CAD As laid drawing has to
be prepared for individual customer.
MJC submission to Non Domestic Billing
Department, MGL House on every Friday.
04/30/21 40
Some of our I&C Customers….
Pepsico Hotel Leela
Asian Paints Hotel Tajmahal
Empire(victrum) ITC Sahar
Borosil Glasses ITC Parel
L& T Industries Asian Hotels
Parle Products Hotel Ambassador
Star Metals Taj Land’s End
Metal Tubes Grand Hyatt
Johnson & Johnson Hotel Raheja
Godrej Soaps Hotel Sun & Sand
Mahindra & Mahindra Godrej Boyce
Nicolas Piramal Leelavati Hospital
Kamani Oil M.S.E.B
V.V.F Hotel Sea Princess
Laminator J.W. Marriot
04/30/21 41
A Glimpse Of MGL’s Prestigious
Clients’ List.
04/30/21
National College Shri SiddhiVinayak
42
Temple
Thank You.
04/30/21 43
Technical site survey report
04/30/21 44
Customer Request Letter…
Customer’s request
for PNG connection.
04/30/21 45
Customer Load Requirement.
04/30/21 46
Society Permission.
Permission issued by
the Society stating their
NOC for installation
and usage of PNG
for the said customer.
04/30/21 47
BMC Permission.
Permission issued by
BMC for laying MP
lines for the said
customer.
04/30/21 48
Planning Drawing…
Approved Plan
Drawing issued
by Planning
Department.
04/30/21 49
Job Order
Job Order for laying
of pipe line for the
said customer.
04/30/21 50
D/s Testing Certificate.
Testing of Downstream Pipeline
04/30/21 51
CFO NOC & CFO Approved Drawing.
04/30/21 52
Checklist as per Fire NOC.
Remarks of Customer
as well as MGL, against
Compliance of points
Mentioned in CFO NOC.
04/30/21 53
Downstream Inspection Report
04/30/21 54
Checklist as per D/s Piping.
Check list for
Downstream Installation
Assembly
04/30/21 55