Sandeep Dixit: Understanding Load Dispatch-Abt-Grid Code-Standards Interplay
Sandeep Dixit: Understanding Load Dispatch-Abt-Grid Code-Standards Interplay
SANDEEP DIXIT
GRID STANDARD
• IEA 2003 SEC
• 177(2)(a) MAKE REGULATION O&M OF
TRANSMISSION LINES
• 73(d) FUNCTION & DUTY CEA TO SPECIFY
• 34 COMPLIANCE OF STANDARD BY LICENSEE
• APPLICABILITY
– Transmission Licensees
– Central Transmission Utility (CTU)
– State Transmission Utilities (STUs),
– Users,
– Appropriate Load Despatch Centres,
– Regional Power Committees (RPCs).
OBJECTIVE
• To ensure safe operation, security,
integrity and reliability of the grid.
• To have a coordinated operation and
maintenance of transmission lines and
generators.
GRID CODE
• IEGC IS A REGULATION MADE BY THE
CENTRAL COMMISSION
• SECTION 79 (1)(H) FUNCTION OF CERC TO
SPECIFY GRID CODE HAVING REGARD TO
GRID STANDARDS
• SECTION 178(2)(g) CERC POWER TO MAKE
REGULATION.
• SECTION 28(2) RLDC TO COMPLY WITH
PRINCIPLES, METHODOLOGIES,
GUIDELINES IN RESPECT OF WHEELING
AND OPTIMUM SCHEDULING AND DISPATCH
ASPER IEGC
IEGC
• THE IEGC ALSO LAYS DOWN THE RULES,
GUIDELINES AND STANDARDS TO BE FOLLOWED
BY VARIOUS PERSONS AND PARTICIPANTS IN THE
SYSTEM TO
– PLAN,
– DEVELOP,
– MAINTAIN AND OPERATE THE POWER SYSTEM, IN
• MOST SECURE,
• RELIABLE,
• ECONOMIC
• EFFICIENT MANNER,
WHILE
• FACILITATING HEALTHY COMPETITION IN THE GENERATION
AND SUPPLY OF ELECTRICITY
CEA STANDARDS - DEFINITIONS
• “Area Load Despatch Centre” means the centre as established by the state
for load despatch & control in a particular area of the state,
• “Bulk consumer” means a consumer who avails supply at voltage of 33 kV
or above,
• Disaster management is the mitigation of the impact of a major breakdown
on the system and bringing about restoration in the shortest possible time,
• “Emergency Restoration System” A system comprising transmission towers/
structures of modular construction complete with associated components
viz. insulators, hardware fittings, accessories, foundation plates, guys,
anchors, installation tools etc. to facilitate quick restoration of
damaged/failed transmission line towers/ sections,
• “Islanding Scheme” is a scheme for separation of the grid into two or more
independent systems as a last resort with a view to save healthy portion of
the grid at the time of the grid disturbance.
STANDARDS
• “Standards” means “Grid Standards for Operation and Maintenance
of Transmission Lines” set forth in the Schedule appended to these
Regulations,
• ”Transient stability” means the ability of all the elements in the
network to remain in synchronism following abrupt change in
operating conditions like tripping of a feeder, tripping of generating
unit, sudden application of a load and network switching etc,
• ”User” means a person such as a Generating Company including
captive generating plant or Transmission Licensee other than the
Central Transmission Utility (CTU) and State Transmission Utility
(STU), Distribution Licensee or Bulk Consumer whose electrical
plant is connected to the Grid at voltage level 33 kV and above,
• “Voltage Unbalance” is defined as the deviation between highest
and lowest line voltage divided by Average line Voltage of the three
phases,
OPERATIONAL PLANNING
Operation Planning
• The Regional Power Committee shall
periodically review the performance of the grid
for the past period and plan stable operation of
the grid for the future, considering various
parameters and occurrences such as frequency
deviations, voltage profile, line loadings, grid
incidents, performance of system protection
schemes, protection coordination
MAINTENANCE PLANNING
Maintenance Planning.-
1.The annual maintenance plan for generating stations in a region
and the inter-State transmission lines shall be prepared by the
concerned RPCs, keeping in view the demand pattern and
maintenance schedule of the generating units and diversity in
demand of the States before the commencement of the financial
year.
The annual maintenance plan for Inter-Regional transmission lines
shall be coordinated between the concerned RPCs. The
coordinated generation and transmission line maintenance plan
shall be reviewed and revised, if necessary on a quarterly basis
and also in the monthly Operating Committee Meetings of the
RPCs.
MAINTENANCE PLANNING
– (2) The annual maintenance plan of Intra-State transmission
lines shall be coordinated by the concerned SLDC in
consultation with the concerned intra-state transmission licensee
taking into account the annual maintenance plan of generating
units and inter-state transmission
– system decided by the concerned RPC. Concerned SLDC will
also review and coordinate the maintenance plan of intra-state
transmission lines for the next month, taking into account the
monthly plan of generating units and inter-state transmission
lines by the concerned RPC for the next month.
– CEA (Grid Standards) Regulations,2006
• (3) The monthly maintenance plan for generating unit &
transmission line shall be implemented with the consent
of the SLDC or RLDC, as the case may be.
COORDINATION IN
OPERATIONS
• Coordination in Operations.-
– (2) RLDC shall inform all affected parties in case it affects their
system
WRITTEN OPERATING
INSTRUCTIONS.-
• 9. Written Operating Instructions.-
• (1) Written operating instructions for each equipment and
operating procedure for sequence of operations of power
system equipment shall be available at each sub-station
and switchyard.
• (2) The operating procedures followed shall not be
inconsistent with the manufacturer’s instructions
regarding particular items of equipment.
• (3) All operators shall be aware of all the operating
instructions and procedures and be capable of operating
the equipment skillfully.
• (4) These operating instructions and procedures shall be
revised whenever required.
INSTRUCTIONS BY RLDCS AND
SLDCS
• 10. Instructions by RLDCs and SLDCs.-
– All operational instructions given by RLDCs
and SLDCs through telephone, Fax, e-mail,
etc shall be coded. Voice recorder shall be
provided at every
– CEA (Grid Standards) Regulations,2006
• RLDC and SLDC for recording and
reproduction of conversation with time
tag/stamp. Archives may be kept at least
for one month.
AUTOMATIC UNDER FREQUENCY
RELAY
• 11. Automatic under frequency Relay.-
• All Regional constituents shall set their under-frequency (UF)
and rate of change of frequency with time (df/dt) Relays in
their respective systems as per plan finalized by RPC to
provide adequate relief for grid security. They shall ensure
healthiness and operation of these relays at the set
frequencies.
– 12. Islanding Schemes.-
• Islanding schemes for separation of systems
with a view to save healthy system from total
collapse in case of grid disturbance if considered
necessary shall be finalized by the RPCs.
Restoration of grid following
disturbance
• 13. Restoration of grid following disturbance.-
• Regional Load Despatch Centre in consultation with
Regional Power Committee and Regional Constituents
shall develop procedures following grid disturbance,
partial grid collapse or blackouts for enabling restoration
and normalization of the grid at the earliest. State Load
Despatch Centre shall also develop procedures
accordingly for restoration of intra-state system. The
operating procedures shall be reviewed following any
addition of generating station or transmission line or at
least once in two years, and revised, if considered
necessary by RLDC and SLDC as the case may be. The
above procedure shall be available to and followed by all
concerned Users.
Reporting of Events
– 14. Reporting of Events Affecting Grid Operation.-
– Any tripping of generating unit or transmission
element shall be promptly reported by the respective
user to the Appropriate Load Despatch Centre.
Details of the respective relay indications in case of
tripping shall also be furnished within two (2) hours.
– CEA (Grid Standards) Regulations,2006
– 15. Reporting of Grid Disturbance.-
• All the incidents of grid disturbance shall be
reported by the Appropriate RLDC to the
concerned RPC and the Authority immediately.
Operational Data
– A real time display of the grid position shall also be made available to
the RPC.
– (a) CEA (Supply and Safety) Regulations, 2006 shall be complied with.
– (b) Contingency procedures shall be prepared and kept handy for use of operators at each
sub-station and switchyard.
– (c) All staff members shall be trained in safety procedures at regular intervals. The entities
shall require their personnel to follow the safety rules during operation and maintenance.
– (e) The fire fighting equipment shall be made available at all substations, switchyards and
converter stations and shall be checked periodically for its upkeep. Mock exercises in fire
fighting shall be carried out periodically.
Maintenance of Tools and
Equipment
• 20. Maintenance of Tools and Equipment.-
• The maintenance staff of the transmission licensee must be made aware of
the list of tools, devices and equipment for various maintenance and
rectification works on transmission lines, sub-stations and converter
stations. The tools must be readily available and certified for usage.
• 21. Maintenance Procedures.-
• Maintenance procedures for each equipment shall be prepared in line with
the manufacturer’s recommendations and prudent utility practices.
• 22. Hot Line Methods.-
• Where feasible, hot line techniques for maintenance of critical transmission
lines and sub-stations shall be adopted eg. washing, and replacement of
Insulators, replacement of damaged section of conductor, replacement of
hardware components. Only trained staff shall be used for such techniques.
The hot line tools employed shall have necessary certification from a
national or international accredited laboratory before usage.
Emergency Restoration System
23. Emergency Restoration System.-
Each transmission licensee shall have an
arrangement for restoration of transmission
lines of 400 kV and above and strategic 220
kV lines through the use of Emergency
Restoration System (ERS) in order to
minimize the outage time of the transmission
lines in case of tower failures.
Inspection and Patrolling
• 24. Inspection and Patrolling.-
• (1) All essential parameters which indicates the
healthiness of the equipment, shall be inspected
by the shift engineer once in each shift and once
daily by the officer in-charge.
• (2) Overhead lines shall be patrolled at
periodicity decided by the transmission licensee.
Different patrolling schedules shall be
implemented by the transmission licensees for
normal terrain, vulnerable terrain and most
vulnerable terrain.
Inspection and Patrolling
• Patrolling schedules for ground inspection of live
lines and tower top inspection of de-energized
lines shall be separately issued by the licensees.
Important lines shall be inspected by senior
engineers after patrolling by junior staff.
Maintenance works such as tree cutting and
replacement of damaged insulators shall be
carried out immediately after patrolling wherever
required. Preventive maintenance of
transmission lines shall be carried out at least
once before onset of summer and once before
onset of winter
Maintenance Schedules.-
• 25. Maintenance Schedules.-
• (1) Traditional Time Based Maintenance(TBM) need to be replaced
by Condition Based Maintenance(CBM) or Reliability Based
Maintenance (RBM) as far as possible, based on criticality of
equipment in order to save on the expenditure on maintenance of
equipment.
• The periodicity of maintenance of lines shall be fixed based on
whether they are passing through normal area or polluted area or
coastal area.
• The transmission lines and sub-stations in polluted areas should be
maintained more frequently.
• The maintenance of lines passing through all such areas should be
completed once before onset of winter so as to minimize tripping
under conditions of fog or due to salt deposit on insulator discs in
coastal areas and once before onset of summer.
Maintenance Schedules.-
• (2) Maintenance and cleaning of various equipment
fittings, accessories, primary instruments and sensors
shall be carried out when they are de-energized during
the shut-down of main equipment although the
maintenance on these additional items is not due.
• (3) Where defects are observed through condition
monitoring as given below or during patrolling and
inspection, the maintenance work on various items of
equipment may be preponed with reference to general
periodicity schedules depending on the condition of the
equipment
Use of Diagonistic Tecniques
• 26. Use of Diagonistic Tecniques for Condition Monitoring of
Equipment.-
• The diagnostic methods of maintenance shall be preferred over
traditional time based maintenance. For this purpose, the following,
but not limited to, devices / methods shall be used.
• (o) Static resistance meter for circuit breakers, isolators, bus bar joint, earth switches
etc.
• (p) Ground tester for measurement of resistivity of soil and ground resistance
– (2) All spare parts would be divided into 3 categories i.e. vital,
essential and desirable. ABC analysis may be carried out in
each category of the equipment.
‘
l’ refers to fundamental frequency (50 Hz)
• ‘n’ refers to the harmonic of nth order (corresponding
frequency is 50 x n Hz)
Harmonics
(2) Maximum Limits of total Harmonic Distortion
• System Voltage THD Individual Harmonic
kV rms % %
765 1.5 1.0
400 2.0 1.5
220 2.5 2.0
132 3.0 2.0
Voltage Fluctuations
• 8. Voltage Fluctuations.-
• (1) The permissible limit of voltage fluctuation for
step changes which may occur repetitively is
1%.
• (2) For occasional fluctuations other than step
changes the maximum permissible limit is 2%.
• The limits prescribed in (a) and (b) above shall
come into force not later than two years from the
date of the publication of these Standards in the
official Gazette.
DISPATCH
• “Despatch Schedule” means the ex-power
plant net MW and MWh output of a
generating station, scheduled to be
Exported to the Grid from time to time.