Construction of Two Storied Mosque: A Tender For

This document is a tender submitted by AKH Builders Company Ltd. for the construction of a two-storied mosque in Patenga, Chittagong. The proposed mosque will be 2650 square feet and take 15 months to complete. AKH Builders includes details of their qualifications, 15 previous completed projects including government works, project description and timeline, bill of quantities, resources including skilled labor and modern equipment, and emphasizes their experience and aim to deliver exceptional quality and client service.

Uploaded by

Sanjay Acharjee
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
304 views24 pages

Construction of Two Storied Mosque: A Tender For

This document is a tender submitted by AKH Builders Company Ltd. for the construction of a two-storied mosque in Patenga, Chittagong. The proposed mosque will be 2650 square feet and take 15 months to complete. AKH Builders includes details of their qualifications, 15 previous completed projects including government works, project description and timeline, bill of quantities, resources including skilled labor and modern equipment, and emphasizes their experience and aim to deliver exceptional quality and client service.

Uploaded by

Sanjay Acharjee
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 24

Group:03

1604169
A Tender for
1604170

1604171
Construction of Two Storied
1604176 Mosque
1604181

1604185

1604190
AKH Builders Company Ltd.

Director : Kushal Acharja Topu


Contract Manager : Shamsul Arefin
Chief Engineer : Md. Arafat Rahman
Project Manager : Md. Hasibul Islam
Coordinator : Sifur Rashid
Surveyor : S.A. Mamun
Safety Manager : Azizul Islam
Proofs of qualification
 Experience details
 Average annual construction turnover
 Credit & financial resources
 Details of other procuring entities
 Bank reference
15 Completed Previous Work Including Government Works

Patenga Girls High School and Shah Mokhdum Jam-E-Masjid


College
Project Description

Site Location: Patenga, Chittagong

2 Storied Mosque
2650 Sq. ft.
15 Months of work
Advertisement

Tender Buy tender data sheet, Collect all Estimate bill


arrangement submission sheet, documents of quantity
contract forms

Pre – tender
meeting
From 01 Nov to
15 Nov, 2019

Tender
submission Within 14 days

Furnishing
Contract Contract notification Signing
performance
management contract
security
Within 7 days
Ten months

Service Possession of site Finishing Hand over to


work procuring
entity
Payment Payment certificate Payment
Attachments

 Tender Submission letter (Form PW2-1)


 Tenderer information (Form PW2-2)
 Bank Guarantee for Tender Security (PW2 – 3)
 Bank letter proof of funds (Form PW2-6)
 Taxpayer’s Identification Number (TIN) Certificate
 Trade license of the tenderer
 Certificate of completion
 Bank Solvency
 Experience Certificate
Important Documents Required

VAT registration Income Tax with up to


Bank certificate
certificate. date clearance.
Annual Turnover
Trade License
Construction Equipment
 Construction vehicles

Backhoe Motor grader Bull Dozer


Construction Equipment
 Construction vehicles

Excavator Tipper
Construction Equipment
 Material handling equipment

Rotary Drilling Rig HDR230 Hand-Held electric concrete Plastering Machine


20-40-60m Vibrator
Construction Equipment
 Material handling equipment

Portable concrete Compactor


Stone Crusher Machine
mixer
Structural Work: Earth Work:
 Layout and marking
 Excavation
 Earth Filling
 Sand Filling

RCC Work:
 Footing Includes:
 Grade beam Shuttering
 Column Reinforcing
 Roof beam Concrete casting
 Slab
 Lintel
Brick Flat Soling One Layer(3”) BFS

Cement Concrete One Layer(3”) CC


NON- Damp Proof Course 3" thick DPC(1:1.5:3) with sand
STRUCTURAL
WORK Brickwork for 5 inch thick Brick
Brickwork
(outside & Partition) wall

Plastering Plastering in Both outside and Inside

Floor finish Floor finishing With Tiles

6 mm thick whitewash with fresh


Whitewashing
cement
Painting Weather coat approved

Mehgoni wood for door, Fixing


Doors and Windows
Aluminium Sliding Window
Bill of Quantity
Sl No. General Summary Amount (Tk)
01 Earthwork 63,500
02 Brick Work 4,00,000
03 Form Work 4,83,500
04 Concrete Estimation 13,00,000
05 Reinforcement Estimation 28,86,500
06 Door & Window 3,56,000
07 Stair 3,96,000
08 Floor Finish, Plastering, Varnish & Painting 3,00,000
09 Sanitary & Water Supply Work 1,76,000
10 Others 5,00,500
Sub Total 66,12,000
Contract Price

Bill of
Payments
Quantities

Cost
Changes in
Price Control Variations

Liquidated Performance
Damages Security
Why us !!!

 9 years of experience
 Skilled Labor & Engineers
 Consultants from BUET and other reputed Universities
 All materials tested in BUET laboratory
 3 Big project completed successfully
Resources

Skilled
Manpower and
Modern
Better
Equipment
Maintenance
Finance
Skilled Manpower and
Better Maintenance

Skilled Experienced Experienced Better


Labor Engineers Architects Facilities in
Office
Why us !!!
 Our Partners
Our aim is to provide a
service to our client that
delivers exceptional quality
workmanship combined
with a working
relationship that you will
not find anywhere else.
“ We don’t build your house,
We build your dream ”