Kaizen
Kaizen
Solution :
Prepared a Daily Equipment Checklist
Implementation
BENEFITS 2
Implementation
BENEFITS 4
Solution :
In-house fabrication of Double Flapper Damper Valve for both cyclone and chamber.
Implementation
BENEFITS 6
Solution :
Used Transparent FRP Sheets at equal distance on roof top.
Installed Roof Ventilators
Before Implementation
BENEFITS 8
Solution :
In-house fabrication of hand trolly from scrap material to collect the waste
Implementation
BENEFITS 10
Solution :
Used discarded gum boots as small pots for tree plantation.
Implementation
BENEFITS 12
Problems :
Stair Case Edges used to be damaged and break repeatedly.
Solution :
Used Discarded FRP cable trays as stair case edge protector.
Before Implementation
BENEFITS 14
Solution :
Prepared a Daily Equipment Checklist
Implementation
BENEFITS 16
Solution :
Used waste acrylic sheet to make a file stand inside cupboard .
Implementation
BENEFITS 18
Solution :
Created a procedure of Assembling & Dismantling with time included for each step.
Implementation
BENEFITS 20