Analysis, Design and Estimation of Hostel Building by Using E-Tabs
Analysis, Design and Estimation of Hostel Building by Using E-Tabs
ENGINEERING COLLEGE
CANTONMENT, BALLARI-583104,
KARNATAKA
2020 – 2021
DEPARTMENT OF CIVIL ENGINEERING
1
2
INTRODUCTION OF PROJECT
3
LITERATURE SURVEY
Name : K. Naga Sai Gopal & N. Lingeshwaran
I.Type for building : Residential Building
II.Number of story : G+5
III.Software used for analysis and design : E-TABS
IV.Purpose : They find stress analysis in slab, shear force for the beam, area reinforcement for
the column, foundation design depends upon the reaction, height of the foundation level
depends upon site and SBC of the soil and due to stability purpose designed the retaining wall
in this project
5
OBJECTIVES OF PROJECT
6
METHODOLOGY
7
SBC TEST
8
DIRECT SHEAR TEST
9
DETAILS OF PROJECT
BUILDING DATA
Utility of Building : Public Building.
Name of Building : Post Metric Boys Hostel @ Hosapete.
Area of the site : 28.53m X 18.61m
Building Height : 15m.
Number of Storey: (G+3).
Type of construction : R.C.C Framed Structure.
Shape of Building : Rectangular.
Type of staircase : Dog Legged.
Type of Walls : Burnt Brick Masonry & RCC Shear wall/RCC
Drop wall.
10
11
12
13
ANALYSIS BY ETABS
14
RESULT DIAGRAMS OBTAINED
2D Analysis
3D Analysis (portal bay analysis)
Model of plan
3D Rendering
2D SFD
2D BMD
3D SFD
3D BMD
15
ANALYSIS DRAWINGS BY ETABS
2D ANAYLSIS
16
ANALYSIS DRAWINGS BY ETABS
3D ANAYLSIS
17
3D RENDER
18
2D SFD
19
2D BMD
20
3D SFD
21
3D BMD
22
REACTIONS
23
DETAILING AND DRAWING
DETAILED STRUCTURAL DRAWINGS
SLAB
BEAM
COLUMN
FOOTING
STAIRCASE
24
SLAB LAYOUT
25
SLAB REINFORCEMENT DETAILS
26
NOTE :
1. TOP REINFORCEMENT SHOULD BE AS PER
ROOF BEAM LAYOUT & RC SCHEDULE
27
ROOF BEAM REINFORCEMENT DETAILS
28
REINFORCED COLUMN LAYOUT
29
REINFORCED COLUMN RC DETAILS
NOTE :
STORY 1 = TIE BEAM LVL.
STORY 3 = 1ST FLOOR LVL.
STORY 4 = 2ND FLOOR LVL.
31
FOOTING REINFORCEMENT DETAILS
32
STAIRCASE REINFORCEMENT DETAILS
UP UP
33
ESTIMATION
Construction cost estimators can be contractually hired in many different
ways.
They may be employed by the owner's representative/project manager,
construction manager, professional design team, or separately hired by the
owner.
They estimate building costs through all the stages of design and the
construction of the project.
It is very important to have the cost estimator involved right from the start
of the project to check the estimation as follows
Quantity Take off
Labour Hours
Labour Rates
Material Prices
Equipment Costs
Subcontractor Quotes
Indirect Costs
Profit Amount
34
GENARAL ABSTRUCT
Swathi Infrastructure, Hosapete.
GENERAL ABSTRACT
Name of Work: CONSTRUCTION OF POST METRIC B.C.M HOSTEL (OLDER)
AT CHITTAWADIGI IN SURVEY NO : 249
AS 0.2 ACRE LAND OF HOSPET TOWN
SI.
Type of Work Amount in Rs.
No.
DETAILED ESTIMATE
CONSTRUCTION OF POST METRIC B.C.M HOSTEL (OLDER)
AT CHITTAWADIGI IN SURVEY NO : 249 Estimated cost: 109.00 Lakhs
AS 0.2 ACRE LAND OF HOSPET TOWN
Itm
Description Unit. No Length L Breadth B Depth D Quantity Rate in Rs. Amount in Rs.
No.
1 2 3 4 5 6 7 8 9 10
I.HOSTEL BLOCK [GROUND FLOOR]
1 KSRRB 200-9: Clearing and grubbing road land including uprooting rank vegetation, grass, bushes,
shrubs, saplings and trees of girth upto 300mm, by manual means, in area of light jungle,
removal of stumps, disposal of unserviceable materials, stacking of serviceable materials within a
lead of 100 metres from road boundary, labour charges complete as per specifications.
Specification No. KRBS 200-1 MORT & H Specifications No. 201(PWD SR 2018-19 Page No. 138,
Item No. 18.11)
ETABS was used for the analysis for all loading combinations since it reduces
the time consumption and gives required accurate results.
All the structural components are checked to satisfy the serviceability criteria
and hence provided dimension of all structural components are adequate.
From the “Analysis and design”, we can estimate the cost of whole structure
before the work is to be executed. Hence the appropriate cost of whole building
will be known in advance. 37
SCOPE OF FUTURE WORK
The quantity of reinforcement required for the structure with and
without seismic load can be checked to know the difference in quantity
of steel and cost of structure.
Shear walls and lateral bracing can also be provided to make the
structure safer against earthquake load and their influence in the analysis
can be considered.
Low cost building material and their strength can be used in multi storey
buildings to achieve overall economy of structures.
The above project can further planned using the project management
tools like Primavera Project Planner or Microsoft project and can be
managed and monitored during execution to achieve fast and efficient
execution.
Light weight building materials can be incorporated in the structural
elements wherever it is required to reduce the total weight of the
structure, and hence can reduce the cost of project.
38
REFERENCE
Structural Design of concrete structure using E-Tabs, Shivam Asawa,
IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) Volume
14, Issue 1 ver. 4 (Jan – Feb 2017), PP 49-51