Qatar North Field GTL Project: Confidential

The document discusses Qatar's North Field and the Qatar SMDS project. It provides an overview of the QSMDS project timeline and development options being considered. It also includes a map showing the major phases of development for the North Field/South Pars field, which is one of the largest natural gas fields in the world straddling the maritime boundary of Qatar and Iran.

Uploaded by

Mostafa Korttam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
84 views

Qatar North Field GTL Project: Confidential

The document discusses Qatar's North Field and the Qatar SMDS project. It provides an overview of the QSMDS project timeline and development options being considered. It also includes a map showing the major phases of development for the North Field/South Pars field, which is one of the largest natural gas fields in the world straddling the maritime boundary of Qatar and Iran.

Uploaded by

Mostafa Korttam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 23

Qatar North Field

GTL Project

Confidential
QSMDS Overview
QGTL Subsurface Team

PS – Thomas Krayenbuhl

PG – Marietta Vroon

PP – Mark Schiet

RE – Wisse van de Guchte

PT – Dolf Reddingius

TL – Wisse van de Guchte

Confidential
QSMDS Overview
QGTL Timeline
 U/S+D/S Scoping Study July 2002
 Draft appraisal well proposal October 2002
 U/S Development Options Report May 2003
 Block allocation June 2003
 VAR2 July 2003
 3D seismic acquisition Aug/Sep 2003
 Heads of Agreement October 2003
 Data well spudding Feb 2004
 VAR3 May 2004
 Update Gas Composition Jul 2004
 Update ADP Jan 2005
 First gas October 2008

Confidential
QSMDS Overview
Outline
 Project Overview

 NPV Map

 Development Options

Confidential
QSMDS Overview
Project Overview

Confidential
QSMDS Overview
North Field (Qatar) and South Pars (Iran)
 Discovered by Shell in 1971
Iran
Shallow oil (NWD-1)
Iran  Iranian part was discovered in
1991 (SP-1)
Qatar  Simple structure: NE-SW Dome-
Groningen field shaped anticline approx.
The Netherlands
GIIP:  100 Tcf 160 x 80 km
 Reservoir: Khuff carbonate
(2800 mss)

0 100
 Gas Column: ~ 1350 ft (K1-K4)
km
 Tilted GWC (Hydrodynamic
effect)
North Field (Qatar) & South Pars (Iran)  No. wells : > 60+ wells (Qatar)
GIIP:  1400 + 440 = 1840 Tcf  Water depth: 30 – 70 m
CIIP:  55 billion barrels

Confidential
QSMDS Overview
North Field/South Pars Developments

Phase 4&5 Phase 9&10

Phase 14

ND 1 Phase1 Phase 6,7&8


Phase 2&3
ND 2 RasGas
Phase 13
Alpha EGU
Phase 11&12
Qatargas Petronet
ND 4
ND 3
ND 5

Dolphin

Qatar SMDS

Confidential
QSMDS Overview
Reservoir Offtake

South Pars / North Field Development Projects


35000
Qatar Not Defined 5
Qatar Not Defined 4
Qatar Not Defined 2
30000
Qatar SMDS Phase 2
SP Phase 12
SP Phase 11
25000
Qatar Not Defined 1
Production rate (MMscf/d)

Persian LNG Phase 13


SP Phase 10
20000 SP Phase 9
SP Phase 6, 7 and 8
Qatar SMDS Phase 1
15000 Qatar Not Defined 3
Iran SMDS Phase 14
Dolphin
10000 EGU
SP Phase 4 and 5
RasGas2 (Petronet)
5000 Qatargas (K2/3)
SP Phase 2 and 3
SP Phase 1
0 RasGas
Qatargas (K4)
1992

1994

2002

2020

2022

2028

2030
1990

1996

1998

2000

2004

2006

2008

2010

2012

2014

2016

2018

2024

2026
North Field Alpha
Date

Confidential
QSMDS Overview
Value Chain of 1 Phase

O2

onshore slugcatcher C4- C1, N2 middle


offshore and condensate midstream SMDS distillates
800 MMscf/d stabilization 70,000 b/d

sulphur, CO2,
25,000 b/d
Hg removal

C5+
LPG
(C3, C4)

Deep C2
extraction

Confidential
QSMDS Overview
Importance of Gas Composition
 C5+ determines condensate output

 Total inerts inversely correlate to C2+

}
N2
total
CO2  Increasing total inerts increase capex & opex of the
inerts
H2S midstream and SMDS facilities
C1  Each 1 mole% N2 causes 6 MM$/y product loss
C2
 6+ mole% N2 requires changes to the SMDS process
C3
C4
} LPG  10+ mole% N2 results in very poor plant performance

C5+ condensate  Each 1 mole% H2S incurs 30 MM$ capex + 1 MM$/y opex

 Mercaptans and COS incur additional capex and opex

 Below 5 mole% CO2 no problem, above 10 mole% significant


removal costs

Confidential
QSMDS Overview
Gas Mixing
Well stream composition

Reservoir

K1 kh1, composition 1

K2/3 kh2/3, composition 2/3

K4 kh4, composition 4

Total k.h affects well deliverability

k.h ratios affect well stream composition


Confidential
QSMDS Overview
Compositional Differences between SDA & Flank

K2: Total Inerts (mole%) K2: C7+ (mole%)

11 11

14 14

17 22 17 22

25 25
21 21

15.5 mole% 5.5 mole% 1.3 mole% 2.4 mole%


(20 b/MMscf) (40 b/MMscf)
Confidential
QSMDS Overview
NPV Map

Confidential
QSMDS Overview
Delta NPV Map
Value Drivers:
Gas composition

Pipeline

Well count (GWC, kh)

11
14
17 22
SDA
21 25

East-flank blocks
-ve +ve

Confidential
QSMDS Overview
Development Options

Confidential
QSMDS Overview
Scenario Tree (SDA)

Control
Controlwell
well
UISE1 (33%) QMD1 (33%) NWD4 (33%)

GWC
GWC
Shallow (33%) Mid (33%) Deep (33%)

Kv/kh
Kv/kh

= 0 (80%) > 0 (20%)

skin
skin
-3 (40%) 0 (50%) 7 (10%) (……… 54 cases)
successful reference condensate
acidization case blocking

Confidential
QSMDS Overview
Well Count Probability for the SDA

0.160
0.140
0.120

Probability
0.100
0.080
0.060
0.040
0.020
0.000
12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
# wells

1.000
0.900
Cumulative Probability

0.800
0.700
0.600
0.500
0.400
0.300
0.200
0.100
0.000
0 5 10 15 20 25 30 35
# wells

Confidential
QSMDS Overview
Drainage Pattern and Drilling Sequence

2008: 8 wells on platform A

2010: 4 wells on platform B

Next: 4 wells on platform B

Next: 4 infill wells on A

Next: 4 infill wells on B

Automated drilling sequence:


1-2 spare wells at all times

Infill wells

3 km outstep Central platform


Total well potential > 1.15 x DCQ
60 deg deviation
Confidential
QSMDS Overview
Reference Case Forecast (SDA based on QMD-1)

UR(2038): 15 Tscf
GIIP(2 blocks): 40 Tscf
+ 4 wells + 4 wells
potential
8 wells

actual

Confidential
QSMDS Overview
Development Options for the SDA

11 CP (12w) CP (12w) 95% 33 CP (12w) SP (6w) 70%

SP (6w) 5% CP (12w) 30%

22 CP (12w) SP (6w) 70% 44 CP (12w) 7%

SP (6w) 25% CP (12w) 88%

SP (6w) 5% SP (6w) 5%

Confidential
QSMDS Overview
Development Options - Risked PV Capex for the SDA

CP CAPEX 24 MM$ common costs excluded


SP CAPEX 20 MM$ common costs excluded Difference between CP & SP:
CP-PL CAPEX 16 MM$
SP-PL CAPEX 13 MM$
WELL CAPEX 18 MM$ Size (# slots)

Risked PV Total Risked PV


Option Description CAPEX Timing PV CAPEX Prob CAPEX CAPEX
1 1 CP 24 0 24.0 0.947 23 Commonalities:
1 1 CP 40 2 34.9 0.947 33
1 +1 SP 33 15.0 70.9 0.053 4
60 Power generation
2 1 CP 24 0 24.0 0.700 17
2 1 SP 36 2 31.4 0.700 22 MEG
2 +1 SP 33 10.0 72.2 0.247 18
2 +1 SP 33 15.0 84.2 0.053 4 Corrosion inhibition
61
3 1 CP 24 0 24.0 0.700 17 Rigless well intervention
3 1 SP 36 2 31.4 0.700 22
3 +1CP 40 10.0 75.8 0.300 23
62
Crane
4
4
1CP + 1 WELL
+1CP
42
40
0
7.0
42.0
66.9
0.062
0.884
3
59
Helideck + boat access
4 +1SP 33 15.0 78.9 0.053 4
66
No shelter

Confidential
QSMDS Overview
Conclusions
 SDA well count (P15, P50, P85) = (13, 16, 20)

 Blocks (21, 22) well count (P15, P50, P85) = (12, 14, 17)

 In terms of risked capex the use of central or satellite platforms is


cost neutral for the SDA and blocks (21, 22)
 The installation of 2 central platforms is therefore preferred,
because:

 it provides the largest flexibility,

 caters for 24 wells

 allows the 2nd platform to be a copy of the first

Confidential
QSMDS Overview
Further Feedback from QP

2 dedicated K4 and 2 dedicated K123 producers per platform

 16 wells required for blocks H4H5.

Confidential
QSMDS Overview