GTL Project
Confidential
QSMDS Overview
QGTL Subsurface Team
PS – Thomas Krayenbuhl
PG – Marietta Vroon
PP – Mark Schiet
PT – Dolf Reddingius
Confidential
QSMDS Overview
QGTL Timeline
U/S+D/S Scoping Study July 2002
Draft appraisal well proposal October 2002
U/S Development Options Report May 2003
Block allocation June 2003
VAR2 July 2003
3D seismic acquisition Aug/Sep 2003
Heads of Agreement October 2003
Data well spudding Feb 2004
VAR3 May 2004
Update Gas Composition Jul 2004
Update ADP Jan 2005
First gas October 2008
Confidential
QSMDS Overview
Outline
Project Overview
NPV Map
Development Options
Confidential
QSMDS Overview
Project Overview
Confidential
QSMDS Overview
North Field (Qatar) and South Pars (Iran)
Discovered by Shell in 1971
Iran
Shallow oil (NWD-1)
Iran Iranian part was discovered in
1991 (SP-1)
Qatar Simple structure: NE-SW Dome-
Groningen field shaped anticline approx.
The Netherlands
GIIP: 100 Tcf 160 x 80 km
Reservoir: Khuff carbonate
(2800 mss)
0 100
Gas Column: ~ 1350 ft (K1-K4)
km
Tilted GWC (Hydrodynamic
effect)
North Field (Qatar) & South Pars (Iran) No. wells : > 60+ wells (Qatar)
GIIP: 1400 + 440 = 1840 Tcf Water depth: 30 – 70 m
CIIP: 55 billion barrels
Confidential
QSMDS Overview
North Field/South Pars Developments
Phase 14
Dolphin
Qatar SMDS
Confidential
QSMDS Overview
Reservoir Offtake
1994
2002
2020
2022
2028
2030
1990
1996
1998
2000
2004
2006
2008
2010
2012
2014
2016
2018
2024
2026
North Field Alpha
Date
Confidential
QSMDS Overview
Value Chain of 1 Phase
O2
sulphur, CO2,
25,000 b/d
Hg removal
C5+
LPG
(C3, C4)
Deep C2
extraction
Confidential
QSMDS Overview
Importance of Gas Composition
C5+ determines condensate output
}
N2
total
CO2 Increasing total inerts increase capex & opex of the
inerts
H2S midstream and SMDS facilities
C1 Each 1 mole% N2 causes 6 MM$/y product loss
C2
6+ mole% N2 requires changes to the SMDS process
C3
C4
} LPG 10+ mole% N2 results in very poor plant performance
C5+ condensate Each 1 mole% H2S incurs 30 MM$ capex + 1 MM$/y opex
Confidential
QSMDS Overview
Gas Mixing
Well stream composition
Reservoir
K1 kh1, composition 1
K4 kh4, composition 4
11 11
14 14
17 22 17 22
25 25
21 21
Confidential
QSMDS Overview
Delta NPV Map
Value Drivers:
Gas composition
Pipeline
11
14
17 22
SDA
21 25
East-flank blocks
-ve +ve
Confidential
QSMDS Overview
Development Options
Confidential
QSMDS Overview
Scenario Tree (SDA)
Control
Controlwell
well
UISE1 (33%) QMD1 (33%) NWD4 (33%)
GWC
GWC
Shallow (33%) Mid (33%) Deep (33%)
Kv/kh
Kv/kh
skin
skin
-3 (40%) 0 (50%) 7 (10%) (……… 54 cases)
successful reference condensate
acidization case blocking
Confidential
QSMDS Overview
Well Count Probability for the SDA
0.160
0.140
0.120
Probability
0.100
0.080
0.060
0.040
0.020
0.000
12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
# wells
1.000
0.900
Cumulative Probability
0.800
0.700
0.600
0.500
0.400
0.300
0.200
0.100
0.000
0 5 10 15 20 25 30 35
# wells
Confidential
QSMDS Overview
Drainage Pattern and Drilling Sequence
Infill wells
UR(2038): 15 Tscf
GIIP(2 blocks): 40 Tscf
+ 4 wells + 4 wells
potential
8 wells
actual
Confidential
QSMDS Overview
Development Options for the SDA
SP (6w) 5% SP (6w) 5%
Confidential
QSMDS Overview
Development Options - Risked PV Capex for the SDA
Confidential
QSMDS Overview
Conclusions
SDA well count (P15, P50, P85) = (13, 16, 20)
Blocks (21, 22) well count (P15, P50, P85) = (12, 14, 17)
Confidential
QSMDS Overview
Further Feedback from QP